7/29/2019 2a. Ramboll. Decom in Operational Phase
1/25
Decommissioning of
offshore installations in
the operational phase
Kristian Lund Jepsen
Ramboll Oil & Gas
7/29/2019 2a. Ramboll. Decom in Operational Phase
2/25
2SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Two types of installations two types decom
7/29/2019 2a. Ramboll. Decom in Operational Phase
3/25
3SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Reasons for decom at fixed installations
Equipment redundantfrom day one
Equipment/systemprocess wise outdated
Demolition
Equipment/systemtechnological outdated
Equipment failed /worn-out
Replace with equipment /systems that fits changedprocess conditions
Replace with modernequipment / systems withnew technology
Refurbish / Repair
Replace (1 : 1)
7/29/2019 2a. Ramboll. Decom in Operational Phase
4/25
4SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Redundant from day one - example
Gas fired heater back-upfor turbine WHRUs
Other examples:
Mud tanks
Well kill system
Runway beams
Trolleys/chain hoists
7/29/2019 2a. Ramboll. Decom in Operational Phase
5/25
5SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Process wise outdated equipment
Increased amount ofproduced water
Change from HP
separation to LP Mode
Change in gascomposition / mole
weight
Change in gascomposition increaseof H2S + CO2
Increased amount ofoil/gas
Debottlenecking ofcomplete process train
Debottlenecking ofproduced water system
Larger pipe dia, larger
volume in separators
Re-bundling ofcentrifugal compressors
and larger driver
Change piping matr.class from CS to duplex
7/29/2019 2a. Ramboll. Decom in Operational Phase
6/25
6SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Technological outdated equipment - examples
Pneumatic analog instruments
F&G Detectors / systems
Control / ESD Systems
Control panels for gas
compressors
7/29/2019 2a. Ramboll. Decom in Operational Phase
7/25
7SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Examples worn-out equipment
7/29/2019 2a. Ramboll. Decom in Operational Phase
8/25
8SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Heat exchangers for cleaning/refurbisment
7/29/2019 2a. Ramboll. Decom in Operational Phase
9/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
10/25
10SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Experiences from operational decom
Dangerous lifting operations(unknown weight+COG)
Handling of NORM (NaturalOccuring Radioactive Matr)
Handling of chemical/oil waste
No asbestos in insulation(however: Flange Insulationkits, Carbon-Asbestos filled
gaskets) Scale may be barium orstrontium sulphate which isNORM material.
7/29/2019 2a. Ramboll. Decom in Operational Phase
11/25
11SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Estimates tons metal scrap per year
Detailed data from one platform backload to shore during one
year.
Assumed a model partly based on above data from one platformfor calculating the amount of equipment operational
decommissioned yearly.
Assessed the Customs Authorities to obtain information aboutimport from offshore installations.
Assessed the oil Companies (DUC/Mrsk Oil, Hess, DONG E&P)
7/29/2019 2a. Ramboll. Decom in Operational Phase
12/25
12SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Backload Logistics and Handling
Return Goods
/ Supply Boat
Well Service
Company
Equipment
Waste skips
Chemical Tote
Tanks
Backload
Containers /
Baskets
Large scrap
items
To Service company
Not dangerous
waste
Chemicals/oil
waste
Empty - send
to Kommune
Kemi
Empty -
normal
renovation
Waste to Kommune Kemi
Tank Cleaning
Waste to Kommune Kemi
Refill Tote
Tank
Sorting /
Evaluation
To Service /
Repair
company
To be Stocked for
later use
(OIL COMPANY'S
STORE)
To be sold for
re-use
Repair /
scrap
Repaired/
To stock
Supply Goods
/ Supply Boat
Scrap Yard
Scrap
Repaird - directly return to offshore
Costums area
7/29/2019 2a. Ramboll. Decom in Operational Phase
13/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
14/25
14SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Estimates from the 3 operators in Danish sector
DUC/Mrsk Oil
Hess Denmark Aps
DONG E&P
Totally: 3100 tons 3400 tons yearly
Variations: 2500 4000 tons yearly
7/29/2019 2a. Ramboll. Decom in Operational Phase
15/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
16/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
17/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
18/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
19/25
19SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Maersk Giant production package onboard
7/29/2019 2a. Ramboll. Decom in Operational Phase
20/25
20SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Maersk Giant equipment being lifted off
7/29/2019 2a. Ramboll. Decom in Operational Phase
21/25
21SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Maersk Giant 2001 Decom/Conversion
Noise / Fire Walls around package removed
Flare tower removed
Production package removed from deck
All interconnecting piping and cabling removed
Totally: 1200 tons removed
Production package, 800 tons, sold from Schlumberger toHannover Company for possible re-use
7/29/2019 2a. Ramboll. Decom in Operational Phase
22/25
7/29/2019 2a. Ramboll. Decom in Operational Phase
23/25
23SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Mobile offshore units. Decom status.
Yearly 2 units in the harbour.
Equipment decommissioned/scapped yearly: 500 tons 2000tons
7/29/2019 2a. Ramboll. Decom in Operational Phase
24/25
24SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Total status. Decom. Tonnes handled yearly
From fixed installations 2500 - 4000From mobile offshore units 500 - 2000
Total 3000 - 6000
7/29/2019 2a. Ramboll. Decom in Operational Phase
25/25
25SlideOctober 15, 2007Basic Ramboll Oil & Gas PPT
Conclusion
The amount (tonnes) of equipment decomissioned/scraped and
then handled in the harbour of Esbjerg yearly corresponds to theweight of one medium size topside.
The experience exists and the companies to handle the wasteand scrap are used to handle these items.
Large heavy lift cranes (Thialf) cannot go into the harbour.
Need for companies who can handle and clean scrapped piping
and equipment for NORM.
Need for long-term storage facilities for NORM.
Recommended