Good Housekeeping

Photo 1: Pan installed under portable toilet and spill kit on site.

Photo 2: Staged straw bales ready to be deployed prior to any qualifying rain event.

Photo 3: Planting and mulching along channel is ongoing.

Photo 4: Planting and native vegetation left in place. Mulch pile on hand for soil stabilization prior to anticipated rain events.

Photo 5: Temporary culvert crossing in new channel. Scheduled for removal on 10/23/2018. Recommend removal of as much soil as possible from crossing prior to removal of culverts and spreading of gravel into channel. Items of Concern

Photo 6: Fuel tank in containment and spill kit present. Contained tank should be covered during rain events to prevent pooling of water in container.

Site Deficiencies None

Recommended