20% Wind Vision

Preview:

DESCRIPTION

20% Wind Vision. NARUC Electricity Committee February 19, 2008 Rob Gramlich Policy Director rgramlich@awea.org. Existing 765 kV New 765 kV AC-DC-AC Link. Transmission for 20% Electricity From Wind. 140 Control Areas Today. From 2003 DOE-NRCan Blackout Report. - PowerPoint PPT Presentation

Citation preview

20% Wind Vision20% Wind Vision

NARUCElectricity CommitteeFebruary 19, 2008

Rob Gramlich Policy Directorrgramlich@awea.org

Existing 765 kV

New 765 kV

AC-DC-AC Link

Transmission for 20% Electricity From WindTransmission for 20% Electricity From Wind

140 Control Areas Today140 Control Areas Today

From 2003 DOE-NRCan Blackout Report

Recommended