Alcatel-Lucent GSM
Move BTS/Abis in Same BSC
MPI14 / MDR3 - CCL
BTS Document
Reconfiguration Method
3BK 17430 0143 QZZZA Ed.04
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 2/10
Status RELEASED
Short title MPI14 / MDR3
All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.
BLANK PAGE BREAK
2 / 10 3BK 17430 0143 QZZZA Ed.04
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 3/10
Move BTS/Abis in Same BSC
MPI14 / MDR3 - CCL
Identification
Customer
Country
OMC-R Site Name: Address:
Name: Address:
Alacatel-Lucent Representative (s)
Customer Representative (s)
Customer Contractor Representative (s)
Date, Time and Duration of Work Start End Duration
General Remarks from Customer General Remarks from Alcatel-Lucent
3BK 17430 0143 QZZZA Ed.04 3 / 10
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 4/10
Applicable Documents
Fill in the edition of the applicable documents
Document Title Document Reference Edition
Move BTS/Abis in Same BSC 3BK 17430 0143 RJZZA
BSS Methods Handbook 3BK 21268 AAAA PCZZA
BSS Configuration Handbook 3BK 21201 AAAA PCZZA
BSS Surveillance Handbook 3BK 21206 AAAA PCZZA
Network Reconfiguration Recommendations 3BK 21269 AAAA PCZZA
BTS NEM User Guide 3BK 21228 AAAA PCZZA
Applicable ITL
Information
Fill in the site data.
OMC-R Hostname
User Name
Password
4 / 10 3BK 17430 0143 QZZZA Ed.04
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 5/10
Cases and Options
Enter a cross for the applicable case or option.
C1 Move BTS(s)
C1.1 New target Abis link has to be created
C1.2 There are downstream BTSs on the source Abis link
C1.3 There are downstream BTSs on the target Abis link
C1.4 Source or target Abis link is "via satellite".
C2 Move a complete Abis link
C3 The BTS supports secondary sectors (for shared cell)
C4 GPRS is activated on the cell(s) of the moved BTS.
O1 Modify NExtraAbis TS on Primary (if HSDS is supported).
O2 Manual Transmission Programming
O3 Automatic Transmission Programming.
Software & Documentation Versions
Fill in the appropriate INITIAL and FINAL software versions.
For BSS reshuffling methods, the INITIAL and FINAL versions are equal.For installation methods, the INITIAL version is "-" .
Initial Version Final Version
OMC-R
NPA
RNO
LASER
BSS
MFS
DocumentationVersion
3BK 17430 0143 QZZZA Ed.04 5 / 10
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 6/10
Results Table
Fill in the Results Table according to the following rules: YES: Put a cross here if the task was performed NO: Put a cross here if the task was not performed
N.A: Put a cross here if the task is not applicable S.A: Enter the number of solved anomalies N.S.A: Enter the number of non-solved anomalies
Scenario Description
Initial Checks
YES NO N.A S.A N.S.A
Initial Checks
Performed by Site Date Start Time End Time Duration
Switch BTS(s)
YES NO N.A S.A N.S.A
Create Abis and Modify Abis Settings
Shut Down Cell on Impacted BTSs
Logically Insert Impacted BTSs
Physically Insert Impacted BTSs
Unlock Cell on Moved BTSs
Performed by Site Date Start Time End Time Duration
Final Checks
YES NO N.A S.A N.S.A
Final Checks
Performed by Site Date Start Time End Time Duration
6 / 10 3BK 17430 0143 QZZZA Ed.04
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 7/10
Reverse Procedure
Shut Down Cell on Impacted BTSs
YES NO N.A S.A N.S.A
Shut Down Cell on Impacted BTSs
Performed by Site Date Start Time End Time Duration
Logically Re-Insert Impacted BTSs
YES NO N.A S.A N.S.A
Logically Re-Insert Impacted BTSs
Performed by Site Date Start Time End Time Duration
Physically Re-insert Impacted BTSs
YES NO N.A S.A N.S.A
Physically Re-insert Impacted BTSs
Performed by Site Date Start Time End Time Duration
Unlock Cell on Impacted BTSs
YES NO N.A S.A N.S.A
Unlock Cell on Impacted BTSs
Performed by Site Date Start Time End Time Duration
3BK 17430 0143 QZZZA Ed.04 7 / 10
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 8/10
Unavailability Duration Sheet
Fill in the unavailability duration sheet according to the following rule: Section Title Title of the paragraph where the unavailability occured Unavailability type T for traffic interruption , R for traffic reduction , S for loss of supervision
(T,R and S could be held simultaneously)Equipment Equipment with its number (eg BTS-1)Date Date expressed as: yy/mm/dd Start time Start time expressed as: hh/mm/ss End time End time expressed as: hh/mm/ss
UnavailabilityType
Equipment Date Start Time End Time
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
8 / 10 3BK 17430 0143 QZZZA Ed.04
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 9/10
Anomaly Sheet
Fill in the unavailability duration sheet according to the following rule: Section Title Title of the paragraph where the anomaly occured Brief description of the anomaly Summarize the anomaly (details must be in anomaly report)
Anomaly report Anomaly report was sent or no Solved by Name of the technician who solved the anomaly Date of anomaly solving
Description Solved by
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
3BK 17430 0143 QZZZA Ed.04 9 / 10
8/2/2019 174300143ccle04
http://slidepdf.com/reader/full/174300143ccle04 10/10
BLANK PAGE BREAK
10 / 10 3BK 17430 0143 QZZZA Ed.04