1

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

Client: U.S. Small BusinessProperty: 50 West 6th Avenue

Oshkosh, WI

Operator: AMY

Estimator: Adam Koch Business: (920) 327-9126E-mail: adam@squareonerestoration.

comBusiness: 2121 Bellevue St

Green Bay, WI 54311

Reference:Company: Self Pay

Type of Estimate: Water DamageDate Entered: 8/11/2014 Date Assigned: 8/11/2014

Price List: WIGR8X_JUL14Labor Efficiency: Restoration/Service/Remodel

Estimate: USSMALLBUSINESS

This is our estimate to complete repairs due to water damage on your property.

2

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 2

USSMALLBUSINESS

Main LevelMain Level

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

1. Neg. air fan/Air scrub.-XLrg (per 24 16.00 DA 0.00 140.00 0.00 2,240.00hr period)-No monit.

8 negative air units for 48 hrs

2. Air mover axial fan (per 24 hour 44.00 EA 0.00 29.78 0.00 1,310.32period) - No monitoring

22 air movers for 48 hrs

3. Scaffold - per section (per week) 10.00 WK 0.00 48.00 0.00 480.00

4. Scaffolding Setup & Take down - 12.00 HR 0.00 30.42 0.00 365.04per hour

6. Cleaning Technician - per hour 12.00 HR 0.00 28.49 0.00 341.88

Needed for leaf blowing of mold spores

229. Content Manipulation charge - 16.00 HR 0.00 30.42 0.00 486.72per hour

needed to throw away remaining contents

Total: Main Level 0.00 5,223.96

Up

Up

Up

Up

Up

Up

UpUp

Up

Hallway 2

Dinning 1Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

7' 1"

12' 1

1"

7' 9

"

12'12' 4"

8' 1

"8'

1"

7' 7" 6' 1"

9' 8

"

9' 6

"

12' 2"11' 10"

4' 9

"4'

11"

38'37' 10"

9' 7

"

14' 5

"

Kitchen Height: 8'

1,027.45 SF Walls1,549.96 SF Walls & Ceiling

58.06 SY Flooring134.75 LF Ceil. Perimeter

522.51 SF Ceiling522.57 SF Floor127.17 LF Floor Perimeter

Missing Wall - Goes to Floor 7' 7" X 6' 8" Opens into WASH_AREA

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

7. Clean the walls and ceiling - Heavy 1,549.96 SF 0.00 0.29 0.00 449.49

9. Clean floor - tile - Heavy clean 522.57 SF 0.00 0.54 0.00 282.19

10. Apply anti-microbial agent 2,072.53 SF 0.00 0.20 0.00 414.51

Totals: Kitchen 0.00 1,146.19

3

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 3

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

6' 3

"

6' 3

"

3' 2

"3'25' 8"

26' 4"

15' 1

1"

17' 4

"1'

7" 7' 7" 6' 1"

8' 1

"8'

1"

12'12' 4"

Wash Area Height: 8'

637.29 SF Walls982.33 SF Walls & Ceiling38.34 SY Flooring85.98 LF Ceil. Perimeter

345.04 SF Ceiling345.04 SF Floor78.40 LF Floor Perimeter

Missing Wall - Goes to Floor 7' 7" X 6' 8" Opens into KITCHEN

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

11. Clean the walls and ceiling - 982.33 SF 0.00 0.29 0.00 284.88Heavy

13. Clean floor - tile - Heavy clean 345.04 SF 0.00 0.54 0.00 186.32

14. Apply anti-microbial agent 1,327.37 SF 0.00 0.20 0.00 265.47

Totals: Wash Area 0.00 736.67

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

12'

1' 7

"9'

8"

11' 1

"

12' 2"

11' 10"

11' 3

"

Office Height: 8'

366.38 SF Walls497.31 SF Walls & Ceiling14.55 SY Flooring45.80 LF Ceil. Perimeter

130.94 SF Ceiling130.94 SF Floor45.80 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

15. Clean the walls and ceiling - 497.31 SF 0.00 0.29 0.00 144.22Heavy

19. Apply anti-microbial agent 628.25 SF 0.00 0.20 0.00 125.65

203. Clean floor - Heavy 130.94 SF 0.00 0.40 0.00 52.38

Totals: Office 0.00 322.25

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 10"

5' 4

"

5' 8

"

5' 6

"

Stairs1 Height: 17'

165.08 SF Walls186.17 SF Walls & Ceiling

4.37 SY Flooring11.17 LF Ceil. Perimeter

21.08 SF Ceiling39.29 SF Floor13.44 LF Floor Perimeter

Missing Wall 3' 10" X 17' Opens into ENTRY

4

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 4

CONTINUED - Stairs1

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 10"9"2'

5"

8'

8' 6"

3' 2

"3' 10"

Subroom: Landing1 (2) Height: 17'

243.67 SF Walls269.00 SF Walls & Ceiling

2.81 SY Flooring14.33 LF Ceil. Perimeter

25.33 SF Ceiling25.33 SF Floor14.33 LF Floor Perimeter

Missing Wall 3' 10" X 17' Opens into STAIRS3

Missing Wall 3' 10" X 17' Opens into STAIRS1

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 10"

5' 6

"

4' 2"

5' 4

"

5' 8

"

Subroom: Stairs3 (1) Height: 17'

205.25 SF Walls225.69 SF Walls & Ceiling

4.29 SY Flooring14.50 LF Ceil. Perimeter

20.44 SF Ceiling38.65 SF Floor17.00 LF Floor Perimeter

Missing Wall 3' 10" X 17' Opens into LANDING1

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

20. Clean the walls and ceiling - 680.86 SF 0.00 0.29 0.00 197.45Heavy

21. Apply anti-microbial agent 784.14 SF 0.00 0.20 0.00 156.83

204. Clean floor - Heavy 103.28 SF 0.00 0.40 0.00 41.31

227. Remove 1/2" drywall - hung, 66.86 SF 0.31 0.00 0.00 20.73taped, heavy texture, ready for paint

228. Remove Batt insulation - 10" - 66.86 SF 0.27 0.00 0.00 18.05R30 - unfaced batt

Totals: Stairs1 0.00 434.37

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 10"3' 10"

4' 2"

1' 5

"

7' 4

"

5' 9

"

3' 4" 4' 8"

8'

4' 9

"2'

5"

7' 6

"

Entry Height: 8'

216.00 SF Walls275.31 SF Walls & Ceiling

6.59 SY Flooring30.83 LF Ceil. Perimeter

59.31 SF Ceiling59.31 SF Floor27.00 LF Floor Perimeter

Missing Wall 3' 10" X 8' Opens into STAIRS1

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

5

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 5

CONTINUED - Entry

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

22. Clean the walls and ceiling - 275.31 SF 0.00 0.29 0.00 79.84Heavy

24. Clean floor - tile - Heavy clean 59.31 SF 0.00 0.54 0.00 32.03

25. Apply anti-microbial agent 334.61 SF 0.00 0.20 0.00 66.92

Totals: Entry 0.00 178.79

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

10' 8"10' 4"

5' 1

1"

5' 9

"

18' 10"18' 8"

13' 9

"

14' 3

"

8'

8' 6"

8'7'

8"

Large Cooler Height: 8'

518.80 SF Walls690.25 SF Walls & Ceiling19.05 SY Flooring64.85 LF Ceil. Perimeter

171.45 SF Ceiling171.45 SF Floor64.85 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

26. Clean the walls and ceiling - 690.25 SF 0.00 0.29 0.00 200.17Heavy

28. Clean floor - tile - Heavy clean 171.45 SF 0.00 0.54 0.00 92.58

29. Apply anti-microbial agent 861.70 SF 0.00 0.20 0.00 172.34

Totals: Large Cooler 0.00 465.09

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

10' 6"

6' 3

"1'

5"

7' 8

"

10' 8"

10' 4"

8'

Freezer Height: 8'

288.00 SF Walls367.22 SF Walls & Ceiling

8.80 SY Flooring36.00 LF Ceil. Perimeter

79.22 SF Ceiling79.22 SF Floor36.00 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

30. Clean the walls and ceiling - 367.22 SF 0.00 0.29 0.00 106.49Heavy

32. Clean floor - tile - Heavy clean 79.22 SF 0.00 0.54 0.00 42.78

33. Apply anti-microbial agent 446.44 SF 0.00 0.20 0.00 89.29

Totals: Freezer 0.00 238.56

6

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 6

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

8'

8' 6"

14' 1

0"

2' 6"4' 3"

4' 5"

15' 2

"

Bathroom Mens Height: 8'

365.33 SF Walls484.00 SF Walls & Ceiling13.19 SY Flooring45.67 LF Ceil. Perimeter

118.67 SF Ceiling118.67 SF Floor45.67 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

38. Clean the walls and ceiling - 484.00 SF 0.00 0.29 0.00 140.36Heavy

39. Clean toilet - Heavy 4.00 EA 0.00 19.23 0.00 76.92

40. Clean toilet seat - Heavy 4.00 EA 0.00 4.03 0.00 16.12

41. Clean urinal - Heavy 4.00 EA 0.00 18.59 0.00 74.36

42. Clean sink - Heavy 4.00 EA 0.00 11.54 0.00 46.16

43. Clean floor - tile - Heavy clean 118.67 SF 0.00 0.54 0.00 64.08

44. Apply anti-microbial agent 602.67 SF 0.00 0.20 0.00 120.53

Totals: Bathroom Mens 0.00 538.53

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

9' 2"

9' 8"

6' 3

"

14' 1

0"8'

10"

2' 6" 5' 10"

6'1' 2"

Bathroom Height: 8'

384.00 SF Walls519.97 SF Walls & Ceiling15.11 SY Flooring48.00 LF Ceil. Perimeter

135.97 SF Ceiling135.97 SF Floor48.00 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

45. Clean the walls and ceiling - 519.97 SF 0.00 0.29 0.00 150.79Heavy

46. Clean toilet - Heavy 4.00 EA 0.00 19.23 0.00 76.92

47. Clean toilet seat - Heavy 4.00 EA 0.00 4.03 0.00 16.12

48. Clean sink - Heavy 4.00 EA 0.00 11.54 0.00 46.16

49. Clean floor - tile - Heavy clean 135.97 SF 0.00 0.54 0.00 73.42

50. Apply anti-microbial agent 655.94 SF 0.00 0.20 0.00 131.19

Totals: Bathroom 0.00 494.60

7

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 7

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

10' 4"

10' 1"12' 6"

12' 9"

23'

23' 4

"

12' 1"11' 8" 8' 11" 3'

6"

8' 6

"8'

10"

Dinning 1 Height: 12'

915.59 SF Walls1,330.29 SF Walls & Ceiling

46.08 SY Flooring75.13 LF Ceil. Perimeter

414.70 SF Ceiling414.70 SF Floor75.13 LF Floor Perimeter

Missing Wall 3' 6" X 12' Opens into HALLWAY_2

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

51. Clean the walls and ceiling - 1,330.29 SF 0.00 0.29 0.00 385.78Heavy

52. Remove Glue down carpet 414.70 SF 0.47 0.00 0.00 194.91

53. Floor prep (scrape rubber back 414.70 SF 0.00 0.52 0.00 215.64residue)

57. Apply anti-microbial agent 1,744.99 SF 0.00 0.20 0.00 349.00

211. Clean floor - Heavy 414.70 SF 0.00 0.40 0.00 165.88

223. Remove 1/2" drywall - hung, 414.70 SF 0.31 0.00 0.00 128.56taped, heavy texture, ready for paint

226. Remove Batt insulation - 10" - 414.70 SF 0.27 0.00 0.00 111.97R30 - unfaced batt

Totals: Dinning 1 0.00 1,551.74

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

2' 6"4' 3"

4' 5"

3' 6

"

3' 8

"

17' 8"

2' 6" 5' 10"

6'1' 2"

Hallway 2 Height: 8'

312.27 SF Walls374.10 SF Walls & Ceiling

6.87 SY Flooring39.03 LF Ceil. Perimeter

61.83 SF Ceiling61.83 SF Floor39.03 LF Floor Perimeter

Missing Wall 3' 6" X 8' Opens into DINNING_1

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

58. Clean the walls and ceiling - 374.10 SF 0.00 0.29 0.00 108.49Heavy

59. Remove Glue down carpet 61.83 SF 0.47 0.00 0.00 29.06

60. Floor prep (scrape rubber back 61.83 SF 0.00 0.52 0.00 32.15residue)

61. Apply anti-microbial agent 435.93 SF 0.00 0.20 0.00 87.19

212. Clean floor - Heavy 61.83 SF 0.00 0.40 0.00 24.73

Totals: Hallway 2 0.00 281.62

8

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 8

Up

Up

Up

Up Up

Up

UpUp

Up

Hallway 2

Dinning 1Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

17' 8"

4' 1

"1' 8

"6'

5"

6' 7

"

37' 10"42' 8"

4' 8"

5' 7

"5'

9"

5' 1"

12' 1"11' 8" 8' 11"

Hallway Height: 8'

749.54 SF Walls1,199.97 SF Walls & Ceiling

50.05 SY Flooring97.10 LF Ceil. Perimeter

450.43 SF Ceiling450.43 SF Floor93.01 LF Floor Perimeter

Missing Wall - Goes to Floor 4' 1" X 6' 8" Opens into DINNING_2

Missing Wall 5' 7 1/16" X 8' Opens into BACK_BAR

Missing Wall 5' 1" X 8' Opens into BACK_BAR

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

62. Clean the walls and ceiling - 1,199.97 SF 0.00 0.29 0.00 347.99Heavy

63. Remove Glue down carpet 450.43 SF 0.47 0.00 0.00 211.70

64. Floor prep (scrape rubber back 450.43 SF 0.00 0.52 0.00 234.22residue)

65. Apply anti-microbial agent 1,650.40 SF 0.00 0.20 0.00 330.08

213. Clean floor - Heavy 450.43 SF 0.00 0.40 0.00 180.17

222. Remove 1/2" drywall - hung, 450.43 SF 0.31 0.00 0.00 139.63taped, heavy texture, ready for paint

224. Remove Batt insulation - 10" - 450.43 SF 0.27 0.00 0.00 121.62R30 - unfaced batt

Totals: Hallway 0.00 1,565.41

Up

Up

Up

Up Up

Up

UpUp

Up

Hallway 2

Dinning 1Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

4' 7

"4'

7"

20' 8"21' 4"

36' 8

"37

' 2"

18' 8"22' 2"

3' 4"

5' 7

"5'

9"

5' 1"

23'

23' 4

"

6' 7"Back Bar Height: 8'

938.62 SF Walls1,862.29 SF Walls & Ceiling

102.63 SY Flooring117.33 LF Ceil. Perimeter

923.68 SF Ceiling923.68 SF Floor117.33 LF Floor Perimeter

Missing Wall 5' 9 1/16" X 8' Opens into HALLWAY

Missing Wall 5' 1" X 8' Opens into HALLWAY

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

66. Clean the walls and ceiling - 1,862.29 SF 0.00 0.29 0.00 540.06Heavy

68. Remove Glue down carpet 461.84 SF 0.47 0.00 0.00 217.06

69. Floor prep (scrape rubber back 461.84 SF 0.00 0.52 0.00 240.16residue)

70. Apply anti-microbial agent 2,785.97 SF 0.00 0.20 0.00 557.19

9

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 9

CONTINUED - Back Bar

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

214. Clean floor - Heavy 923.68 SF 0.00 0.40 0.00 369.47

Totals: Back Bar 0.00 1,923.94

Up

Up

Up

Up Up

Up

UpUp

Up

Hallway 2

Dinning 1Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

4' 1

"

6' 5

"

6' 7

"

3' 6

"

3' 8

"

17' 7"

4' 1

1"

9' 6"

9' 4"

11' 4

"7'

2"

7' 6

"

3' 11"

6' 6

"

4' 5"

9' 1" 1' 6

"45' 10"

Dinning 2 Height: 28'

3,007.61 SF Walls3,482.56 SF Walls & Ceiling

52.77 SY Flooring136.92 LF Ceil. Perimeter

474.95 SF Ceiling474.95 SF Floor76.83 LF Floor Perimeter

Missing Wall - Goes to Floor 4' 1" X 6' 8" Opens into HALLWAY

Missing Wall 4' 11" X 28' Opens into FOYER_ENTRY

Missing Wall 5' 3" X 28' Opens into STAIRS17

Missing Wall 3' 11" X 28' Opens into STAIRS21

Missing Wall 45' 10" X 28' Opens into FRONT_BAR

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

71. Clean the walls and ceiling - 3,482.56 SF 0.00 0.29 0.00 1,009.94Heavy

73. Remove Glue down carpet 474.95 SF 0.47 0.00 0.00 223.23

74. Floor prep (scrape rubber back 474.95 SF 0.00 0.52 0.00 246.97residue)

75. Apply anti-microbial agent 3,957.51 SF 0.00 0.20 0.00 791.50

200. Clean floor - Heavy 474.95 SF 0.00 0.40 0.00 189.98

Totals: Dinning 2 0.00 2,461.62

UpU

p

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

10' 6"

4' 1

1"

10"9' 4"

Foyer/Entry Height: 8'

168.00 SF Walls219.63 SF Walls & Ceiling

5.74 SY Flooring25.92 LF Ceil. Perimeter

51.63 SF Ceiling51.63 SF Floor21.00 LF Floor Perimeter

Missing Wall 4' 11" X 8' Opens into DINNING_2

Missing Wall 4' 11" X 8' Opens into STAIRS4

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

10

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 10

CONTINUED - Foyer/Entry

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

76. Clean the walls and ceiling - 219.63 SF 0.00 0.29 0.00 63.69Heavy

77. Clean floor - tile - Heavy clean 51.63 SF 0.00 0.54 0.00 27.88

78. Apply anti-microbial agent 271.25 SF 0.00 0.20 0.00 54.25

215. Clean floor - Heavy 51.63 SF 0.00 0.40 0.00 20.65

Totals: Foyer/Entry 0.00 166.47

Up

Up

Up

Up

Up

UpUp

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

13' 2"

4' 1

1"

13' 4"

13'

Stairs4 Height: 15' 6"

310.85 SF Walls375.58 SF Walls & Ceiling11.54 SY Flooring26.50 LF Ceil. Perimeter

64.73 SF Ceiling103.86 SF Floor29.89 LF Floor Perimeter

Missing Wall 4' 11" X 15' 6" Opens into FOYER_ENTRY

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

4' 1

1"

4' 5"

5' 1

"

5' 5

"

4' 7"

4' 11"Subroom: Stairs5 (1) Height: 10' 6"

105.92 SF Walls129.21 SF Walls & Ceiling

2.59 SY Flooring9.67 LF Ceil. Perimeter

23.29 SF Ceiling23.30 SF Floor9.67 LF Floor Perimeter

Missing Wall 4' 11" X 10' 6" Opens into STAIRS4

Missing Wall 4' 5" X 10' 6" Opens into STAIRS6

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

79. Clean the walls and ceiling - 504.79 SF 0.00 0.29 0.00 146.39Heavy

80. Apply anti-microbial agent 631.95 SF 0.00 0.20 0.00 126.39

216. Clean floor - Heavy 127.16 SF 0.00 0.40 0.00 50.86

Totals: Stairs4 0.00 323.64

11

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 11

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

4' 5"

10' 1

0"

11'

4' 7"

11'

10' 8

"

Stairs6 Height: 17'

276.24 SF Walls324.09 SF Walls & Ceiling10.16 SY Flooring21.83 LF Ceil. Perimeter

47.85 SF Ceiling91.46 SF Floor27.06 LF Floor Perimeter

Missing Wall 4' 5" X 17' Opens into STAIRS5

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

81. Clean the walls and ceiling - 324.09 SF 0.00 0.29 0.00 93.99Heavy

82. Apply anti-microbial agent 415.55 SF 0.00 0.20 0.00 83.11

217. Clean floor - Heavy 91.46 SF 0.00 0.40 0.00 36.58

Totals: Stairs6 0.00 213.68

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

7' 4

"

5' 3" 4"

7' 2

"

7' 6

"

Stairs17 Height: 11' 9"

143.40 SF Walls181.90 SF Walls & Ceiling

6.73 SY Flooring14.50 LF Ceil. Perimeter

38.50 SF Ceiling60.57 SF Floor15.76 LF Floor Perimeter

Missing Wall 5' 3" X 11' 9" Opens into DINNING_2

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

5' 3"

3' 1

0"

5' 5"

4'

Subroom: Stairs18 (2) Height: 10' 6"

97.13 SF Walls118.13 SF Walls & Ceiling

2.33 SY Flooring9.25 LF Ceil. Perimeter

21.00 SF Ceiling21.00 SF Floor9.25 LF Floor Perimeter

Missing Wall 5' 3" X 10' 6" Opens into STAIRS17

Missing Wall 3' 10" X 10' 6" Opens into STAIRS21

12

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 12

CONTINUED - Stairs17

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

4'

4"

6' 6

"

7' 2

"

4' 6"

6' 8

"

Subroom: Stairs19 (1) Height: 11' 9"

161.81 SF Walls188.48 SF Walls & Ceiling

4.39 SY Flooring17.17 LF Ceil. Perimeter

26.67 SF Ceiling39.50 SF Floor18.54 LF Floor Perimeter

Missing Wall 4' X 11' 9" Opens into STAIRS20

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 1

0"

4'

4' 4

"

4'

4' 4"Subroom: Stairs20 (4) Height: 10' 6"

84.00 SF Walls100.00 SF Walls & Ceiling

1.78 SY Flooring8.00 LF Ceil. Perimeter

16.00 SF Ceiling16.00 SF Floor8.00 LF Floor Perimeter

Missing Wall 3' 10" X 10' 6" Opens into STAIRS21

Missing Wall 4' X 10' 6" Opens into STAIRS19

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

4" 3' 11"

3' 1

0"

4' 7"Subroom: Stairs21 (3) Height: 10' 6"

48.35 SF Walls66.58 SF Walls & Ceiling3.22 SY Flooring5.25 LF Ceil. Perimeter

18.22 SF Ceiling28.98 SF Floor5.67 LF Floor Perimeter

Missing Wall 3' 10" X 10' 6" Opens into STAIRS18

Missing Wall 3' 11" X 10' 6" Opens into DINNING_2

Missing Wall 3' 10" X 10' 6" Opens into STAIRS20

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

83. Clean the walls and ceiling - 655.08 SF 0.00 0.29 0.00 189.97Heavy

84. Apply anti-microbial agent 821.13 SF 0.00 0.20 0.00 164.23

199. Remove Glue down carpet 166.05 SF 0.47 0.00 0.00 78.04

218. Clean floor - Heavy 166.05 SF 0.00 0.40 0.00 66.42

Totals: Stairs17 0.00 498.66

13

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 13

Up

Up

Up

Up Up

Up

UpUp

Up

Hallway 2

Dinning 1Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

8' 2

"8'

4"

11' 7"11' 3"

10' 1

0"14

' 4"

3' 11' 5"

11' 1"

4' 5

"

7' 2"7' 2"

6' 4

"

13' 7"14' 3"

35' 1

0"

36' 2

"

45' 10"

Front Bar Height: 14' 6"

1,703.75 SF Walls2,809.45 SF Walls & Ceiling

122.86 SY Flooring163.33 LF Ceil. Perimeter

1,105.70 SF Ceiling1,105.70 SF Floor

117.50 LF Floor Perimeter

Missing Wall 45' 10" X 14' 6" Opens into DINNING_2

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

85. Clean the walls and ceiling - 2,809.45 SF 0.00 0.29 0.00 814.74Heavy

87. Remove Glue down carpet 1,105.70 SF 0.47 0.00 0.00 519.68

88. Floor prep (scrape rubber back 1,105.70 SF 0.00 0.52 0.00 574.96residue)

89. Apply anti-microbial agent 3,915.15 SF 0.00 0.20 0.00 783.03

219. Clean floor - Heavy 1,105.70 SF 0.00 0.40 0.00 442.28

Totals: Front Bar 0.00 3,134.69Up

Up

UpU

p

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2Stairs17

4' 10"5'

8' 4

"8'

6' 5"

6' 1"

11' 4

"10

' 10"

11' 7"11' 3"

4' 1

0"7'

9"

19' 2

"

6' 3

"

Coat Room Height: 8'

486.67 SF Walls648.82 SF Walls & Ceiling18.02 SY Flooring60.83 LF Ceil. Perimeter

162.15 SF Ceiling162.15 SF Floor60.83 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

90. Clean the walls and ceiling - 648.82 SF 0.00 0.29 0.00 188.16Heavy

92. Remove Glue down carpet 162.15 SF 0.47 0.00 0.00 76.21

93. Floor prep (scrape rubber back 162.15 SF 0.00 0.52 0.00 84.32residue)

94. Apply anti-microbial agent 810.97 SF 0.00 0.20 0.00 162.19

220. Clean floor - Heavy 162.15 SF 0.00 0.40 0.00 64.86

Totals: Coat Room 0.00 575.74

14

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 14

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 1

0"

4' 6"

4' 10"

4' 8"

Stairs Height: 17'

140.50 SF Walls158.39 SF Walls & Ceiling

4.01 SY Flooring9.50 LF Ceil. Perimeter

17.89 SF Ceiling36.10 SF Floor12.11 LF Floor Perimeter

Missing Wall 3' 10" X 17' Opens into Exterior

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 1

0"

4' 6"

3'1'

4' 10"

Subroom: Stairs2 (1) Height: 17'

180.67 SF Walls197.92 SF Walls & Ceiling

3.94 SY Flooring12.83 LF Ceil. Perimeter

17.25 SF Ceiling35.46 SF Floor15.69 LF Floor Perimeter

Missing Wall 3' 10" X 17' Opens into LANDING

Up

Up

Up

Up

Up

Up

Up

Up

Up

Hallway 2

Dinning 1

Bathroom Mens

Hallway

Back Bar

Bathroom

Freezer

Large Cooler

Coat Room

Kitchen

Wash Area

Stairs1

Stairs

Entry

Office

Stairs4Foyer/Entry

Stairs6

Front Bar

Dinning 2

Stairs17

3' 1

0"

1' 11"

8' 4

"

8'

1' 9"

3' 1

0"

Subroom: Landing (2) Height: 17'

189.83 SF Walls202.50 SF Walls & Ceiling

1.41 SY Flooring11.17 LF Ceil. Perimeter

12.67 SF Ceiling12.67 SF Floor11.17 LF Floor Perimeter

Missing Wall 3' 10" X 17' Opens into STAIRS2

Missing Wall 3' 10" X 17' Opens into STAIRS

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

95. Clean the walls and ceiling - 558.81 SF 0.00 0.29 0.00 162.05Heavy

96. Apply anti-microbial agent 643.03 SF 0.00 0.20 0.00 128.61

221. Clean floor - Heavy 84.22 SF 0.00 0.40 0.00 33.69

Totals: Stairs 0.00 324.35

Total: Main Level 0.00 22,800.57

LoftLoft

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

97. Neg. air fan/Air scrub.-XLrg (per 4.00 DA 0.00 140.00 0.00 560.0024 hr period)-No monit.

15

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 15

CONTINUED - Loft

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

2 negative air machines for 48 hrs

98. Air mover axial fan (per 24 hour 16.00 EA 0.00 29.78 0.00 476.48period) - No monitoring

8 air movers for 48 hrs

100. Cleaning Technician - per hour 12.00 HR 0.00 28.49 0.00 341.88

Needed for leaf blowing of mold spores

198. Content Manipulation charge - 5.00 HR 0.00 30.42 0.00 152.10per hour

to throw away any contents affected

Total: Loft 0.00 1,530.46

Up

Up

Up

Up Up

Up

UpUp

Up

UpU

p

Loft

Coat Room 2

Closet

56' 8

"

57' 4

"

9' 1"

9' 7"

8' 5

" 4' 1

1"17' 11"18' 7"

8' 1

1"9'

7"

4' 1"18' 2"

37' 8

"38

' 4"

11'11' 8"

2'

32'31' 4"

21'

21'

3'3' 8"

Loft Height: 8'

1,961.44 SF Walls3,404.10 SF Walls & Ceiling

160.30 SY Flooring242.08 LF Ceil. Perimeter

1,442.66 SF Ceiling1,442.66 SF Floor

242.08 LF Floor Perimeter

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Loft

Coat Room 2

Closet

3'

4"

1' 5

"

1' 1

"

8' 1"

4' 5

"

8' 5"

Subroom: Stairs (2) Height: 13' 8"

182.51 SF Walls219.13 SF Walls & Ceiling

7.05 SY Flooring16.88 LF Ceil. Perimeter

36.63 SF Ceiling63.46 SF Floor19.29 LF Floor Perimeter

Missing Wall 3' X 13' 7 1/2" Opens into LOFT

Missing Wall 4' 4 3/4" X 13' 7 1/2" Opens into STAIRS1

Up

Up

Up

Up

Up

UpUp

Up

Up

Up

Up

Loft

Coat Room 2

Closet

3' 10"

4'

8' 5

"

4' 5

"

Subroom: Stairs1 (3) Height: 10' 3"

164.58 SF Walls196.73 SF Walls & Ceiling

3.57 SY Flooring16.06 LF Ceil. Perimeter

32.14 SF Ceiling32.14 SF Floor16.06 LF Floor Perimeter

Missing Wall 4' 4 3/4" X 10' 3" Opens into STAIRS

Missing Wall 3' 8 1/2" X 10' 3" Opens into STAIRS2

16

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 16

CONTINUED - Loft

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Loft

Coat Room 2

Closet

3' 8

"

8' 1"

8' 5"

4'

Subroom: Stairs2 (1) Height: 13' 8"

204.96 SF Walls235.01 SF Walls & Ceiling

5.81 SY Flooring19.92 LF Ceil. Perimeter

30.06 SF Ceiling52.30 SF Floor22.82 LF Floor Perimeter

Missing Wall 3' 8 1/2" X 13' 7 1/2" Opens into STAIRS1

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

101. Clean the walls and ceiling - 4,054.98 SF 0.00 0.29 0.00 1,175.94Heavy

103. Remove Glue down carpet 1,590.56 SF 0.47 0.00 0.00 747.56

104. Floor prep (scrape rubber back 1,590.56 SF 0.00 0.52 0.00 827.09residue)

105. Apply anti-microbial agent 5,645.54 SF 0.00 0.20 0.00 1,129.11

Totals: Loft 0.00 3,879.70

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Loft

Coat Room 2

Closet

14'

14' 4"

5' 3

"

1' 9" 11' 11"

14' 2"

4' 1

1"

Coat Room 2 Height: 8'

264.34 SF Walls332.60 SF Walls & Ceiling

7.58 SY Flooring33.04 LF Ceil. Perimeter

68.26 SF Ceiling68.26 SF Floor33.04 LF Floor Perimeter

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Loft

Coat Room 2

Closet

8' 1

1"

9' 7

"

3' 11"

4' 3"

4' 1

1"3'

8"

4'

3' 9"

4' 1"

Subroom: Room4 (1) Height: 8'

164.99 SF Walls199.24 SF Walls & Ceiling

3.81 SY Flooring20.62 LF Ceil. Perimeter

34.25 SF Ceiling34.25 SF Floor20.62 LF Floor Perimeter

Missing Wall 4' 10 1/2" X 8' Opens into COAT_ROOM_2

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

106. Clean the walls and ceiling - 531.84 SF 0.00 0.29 0.00 154.23Heavy

107. Remove Glue down carpet 102.51 SF 0.47 0.00 0.00 48.18

17

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 17

CONTINUED - Coat Room 2

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

108. Floor prep (scrape rubber back 102.51 SF 0.00 0.52 0.00 53.31residue)

109. Apply anti-microbial agent 634.35 SF 0.00 0.20 0.00 126.87

Totals: Coat Room 2 0.00 382.59

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Up

Loft

Coat Room 2

Closet

8' 9

"

6' 6"

8' 5

"

1' 9"

6' 2"

4' 7" Closet Height: 8'

233.64 SF Walls285.66 SF Walls & Ceiling

5.78 SY Flooring29.21 LF Ceil. Perimeter

52.02 SF Ceiling52.02 SF Floor29.21 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

110. Clean the walls and ceiling - 285.66 SF 0.00 0.29 0.00 82.84Heavy

111. Remove Glue down carpet 52.02 SF 0.47 0.00 0.00 24.45

112. Floor prep (scrape rubber back 52.02 SF 0.00 0.52 0.00 27.05residue)

113. Apply anti-microbial agent 337.68 SF 0.00 0.20 0.00 67.54

Totals: Closet 0.00 201.88

Total: Loft 0.00 5,994.63

BasementBasement

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

114. Neg. air fan/Air scrub.-XLrg (per 16.00 DA 0.00 140.00 0.00 2,240.0024 hr period)-No monit.

8 neg air machines for 48 hrs

115. Air mover axial fan (per 24 hour 48.00 EA 0.00 29.78 0.00 1,429.44period) - No monitoring

24 fans for 48 hrs

116. Dehumidifier (per 24 hour period) 18.00 EA 0.00 114.72 0.00 2,064.96- XLarge - No monitoring

6 dehus for 3 days

172. Containment 400.00 SF 0.00 0.85 1.76 341.76Barrier/Airlock/Decon. Chamber

18

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 18

CONTINUED - Basement

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

174. Containment Barrier - tension 30.00 DA 0.00 3.30 0.00 99.00post - per day

3 poles for 5 days in 2 stairwells

175. Peel & seal zipper 2.00 EA 0.00 10.85 0.77 22.47

197. General Laborer - per hour 20.00 HR 0.00 30.42 0.00 608.40

needed to leaf blow mold for cleaning

Total: Basement 2.53 6,806.03

Up

Up Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

14' 7

"

15' 3

"

3' 10"4' 4"

9' 1

0"

9' 6

"

5' 5'

16'

5'

4' 9

"

4' 1

1"

19' 10"

20' 4" Room1 Height: 8'

550.87 SF Walls682.82 SF Walls & Ceiling14.66 SY Flooring68.86 LF Ceil. Perimeter

131.95 SF Ceiling131.95 SF Floor68.86 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

117. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour

118. Dry ice blasting 682.82 SF 0.00 2.79 0.00 1,905.07

120. Apply anti-microbial agent 814.77 SF 0.00 0.20 0.00 162.95

176. Remove 1/2" drywall - hung & 682.82 SF 0.31 0.00 0.00 211.67fire taped only

185. Clean floor - Heavy 131.95 SF 0.00 0.40 0.00 52.78

Totals: Room1 0.00 2,362.89

Up

Up

Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

5' 2"

5'

9' 6

"

9' 1

0"

Room2 Height: 8'

232.20 SF Walls279.77 SF Walls & Ceiling

5.28 SY Flooring29.03 LF Ceil. Perimeter

47.56 SF Ceiling47.56 SF Floor29.03 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

121. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour

19

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 19

CONTINUED - Room2

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

122. Dry ice blasting 279.77 SF 0.00 2.79 0.00 780.56

124. Apply anti-microbial agent 327.33 SF 0.00 0.20 0.00 65.47

178. Remove 1/2" drywall - hung & 279.77 SF 0.31 0.00 0.00 86.73fire taped only

186. Clean floor - Heavy 47.56 SF 0.00 0.40 0.00 19.02

Totals: Room2 0.00 982.20

Up

Up

Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

5' 4"

5'

9' 6

"

Room3 Height: 8'

232.20 SF Walls279.77 SF Walls & Ceiling

5.28 SY Flooring29.03 LF Ceil. Perimeter

47.56 SF Ceiling47.56 SF Floor29.03 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

125. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour

126. Dry ice blasting 279.77 SF 0.00 2.79 0.00 780.56

128. Apply anti-microbial agent 327.33 SF 0.00 0.20 0.00 65.47

179. Remove 1/2" drywall - hung & 279.77 SF 0.31 0.00 0.00 86.73fire taped only

187. Clean floor - Heavy 47.56 SF 0.00 0.40 0.00 19.02

Totals: Room3 0.00 982.20

Up

Up

Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

9' 1

0"

5' 6"

5'

9' 6

"

5' 4"

Room4 Height: 8'

232.20 SF Walls279.77 SF Walls & Ceiling

5.28 SY Flooring29.03 LF Ceil. Perimeter

47.56 SF Ceiling47.56 SF Floor29.03 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

129. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour

130. Dry ice blasting 279.77 SF 0.00 2.79 0.00 780.56

20

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 20

CONTINUED - Room4

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

132. Apply anti-microbial agent 327.33 SF 0.00 0.20 0.00 65.47

180. Remove 1/2" drywall - hung & 279.77 SF 0.31 0.00 0.00 86.73fire taped only

188. Clean floor - Heavy 47.56 SF 0.00 0.40 0.00 19.02

Totals: Room4 0.00 982.20

Up

Up

Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

3'

3' 5

"1'

4"

3' 4"

4' 9

"

4' 1

0"

Stairs Height: 11' 2"

81.91 SF Walls96.25 SF Walls & Ceiling2.90 SY Flooring8.40 LF Ceil. Perimeter

14.33 SF Ceiling26.11 SF Floor9.35 LF Floor Perimeter

Missing Wall 3' X 11' 1 1/2" Opens into ROOM5

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

133. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour

134. Dry ice blasting 96.25 SF 0.00 2.79 0.00 268.54

136. Apply anti-microbial agent 122.35 SF 0.00 0.20 0.00 24.47

182. Remove 1/2" drywall - hung & 96.25 SF 0.31 0.00 0.00 29.84fire taped only

189. Clean floor - Heavy 26.11 SF 0.00 0.40 0.00 10.44

Totals: Stairs 0.00 363.71

Up

Up Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

4' 9

" 8' 6"

8' 8"

16'

5' 2"

5' 8"1"4'

9"

4' 1

0"

3'

6' 1

" 11' 2

"

Room5 Height: 8'

365.37 SF Walls485.18 SF Walls & Ceiling13.31 SY Flooring48.67 LF Ceil. Perimeter

119.81 SF Ceiling119.81 SF Floor45.67 LF Floor Perimeter

Missing Wall 3' X 8' Opens into STAIRS

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

137. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour

138. Dry ice blasting 485.18 SF 0.00 2.79 0.00 1,353.65

21

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 21

CONTINUED - Room5

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

140. Apply anti-microbial agent 604.99 SF 0.00 0.20 0.00 121.00

181. Remove 1/2" drywall - hung & 485.18 SF 0.31 0.00 0.00 150.41fire taped only

190. Clean floor - Heavy 119.81 SF 0.00 0.40 0.00 47.92

Totals: Room5 0.00 1,764.24

Up

Up Up

Room1

Room2Room3Room4

Stairs

Room5

Room6

Room7

Room8

Room10

Room9

16'

16' 2

"

12'12' 2"

12' 2"

Room6 Height: 8'

448.04 SF Walls640.07 SF Walls & Ceiling21.34 SY Flooring56.00 LF Ceil. Perimeter

192.03 SF Ceiling192.03 SF Floor56.00 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

141. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour

142. Dry ice blasting 640.07 SF 0.00 2.79 0.00 1,785.80

144. Apply anti-microbial agent 832.10 SF 0.00 0.20 0.00 166.42

183. Remove 1/2" drywall - hung & 448.04 SF 0.31 0.00 0.00 138.89fire taped only

191. Clean floor - Heavy 192.03 SF 0.00 0.40 0.00 76.81

Totals: Room6 0.00 2,259.18

Up

Up Up

Room1

Room2Room3Room4

Stairs

Room5Room6

Room7

Room8

Room10

Room9

16'

33' 2

"17

'

27' 3"

27' 5"

16'

17' 2

"

27' 9"

Room7 Height: 8'

966.67 SF Walls1,870.46 SF Walls & Ceiling

100.42 SY Flooring120.83 LF Ceil. Perimeter

903.79 SF Ceiling903.79 SF Floor120.83 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

145. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour

146. Dry ice blasting 1,870.46 SF 0.00 2.79 0.00 5,218.58

148. Apply anti-microbial agent 2,774.25 SF 0.00 0.20 0.00 554.85

22

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 22

CONTINUED - Room7

DESCRIPTION QTY REMOVE REPLACE TOTALTAX

192. Clean floor - Heavy 903.79 SF 0.00 0.40 0.00 361.52

Totals: Room7 0.00 6,226.21

Up

Up Up

Room1

Room2Room3Room4

Stairs

Room5Room6

Room7

Room8

Room10

Room9

39' 7"40' 1"

29' 6

"

12' 27' 3"

29' 2

"

29' 4

"

Room8 Height: 8'

1,100.00 SF Walls2,254.51 SF Walls & Ceiling

128.28 SY Flooring137.50 LF Ceil. Perimeter

1,154.51 SF Ceiling1,154.51 SF Floor

137.50 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

149. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour

150. Dry ice blasting 2,254.51 SF 0.00 2.79 0.00 6,290.08

152. Apply anti-microbial agent 3,409.03 SF 0.00 0.20 0.00 681.81

193. Clean floor - Heavy 1,154.51 SF 0.00 0.40 0.00 461.80

Totals: Room8 0.00 7,524.95

Up

Up

Up

Room1

Room2Room3Room4Stairs

Room5Room6

Room7

Room8

Room10

Room9

46' 4

"

46' 1

0"

32' 2"32' 8"

29' 2

"17

'

Room9 Height: 8'

1,256.00 SF Walls2,746.39 SF Walls & Ceiling

165.60 SY Flooring157.00 LF Ceil. Perimeter

1,490.39 SF Ceiling1,490.39 SF Floor

157.00 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

153. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour

154. Dry ice blasting 2,746.39 SF 0.00 2.79 0.00 7,662.43

156. Apply anti-microbial agent 4,236.78 SF 0.00 0.20 0.00 847.36

194. Clean floor - Heavy 1,490.39 SF 0.00 0.40 0.00 596.16

Totals: Room9 0.00 9,197.21

23

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 23

Up

Up Up

Room1

Room2Room3Room4

Stairs

Room5Room6

Room7

Room8

Room10

Room9

32' 8"

16'

16' 6

"32' 2"

16' 2

"

Room10 Height: 8'

770.67 SF Walls1,285.33 SF Walls & Ceiling

57.19 SY Flooring96.33 LF Ceil. Perimeter

514.67 SF Ceiling514.67 SF Floor96.33 LF Floor Perimeter

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

157. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour

158. Dry ice blasting 1,285.33 SF 0.00 2.79 0.00 3,586.07

160. Apply anti-microbial agent 1,800.00 SF 0.00 0.20 0.00 360.00

184. Remove 1/2" drywall - hung & 1,285.33 SF 0.31 0.00 0.00 398.45fire taped only

195. Clean floor - Heavy 514.67 SF 0.00 0.40 0.00 205.87

Totals: Room10 0.00 4,641.65

Miscellaneous

DESCRIPTION QTY REMOVE REPLACE TAX TOTAL

161. Dumpster load - Approx. 40 2.00 EA 664.03 0.00 0.00 1,328.06yards, 7-8 tons of debris

162. Equipment setup, take down, and 18.00 HR 0.00 45.51 0.00 819.18monitoring (hourly charge)

163. Add for HEPA filter (for neg. air 18.00 EA 0.00 234.42 0.00 4,219.56machine/vacuum - Large)

164. Add for personal protective 36.00 EA 0.00 7.01 0.00 252.36equipment (hazardous cleanup)

171. Content Manipulation charge - 20.00 HR 0.00 30.42 0.00 608.40per hour

to move contents out of building

196. Equipment decontamination 55.00 EA 0.00 30.33 0.00 1,668.15charge - per piece of equipment

Totals: Miscellaneous 0.00 8,895.71

Total: Basement 2.53 52,988.38

Line Item Totals: USSMALLBUSINESS 2.53 81,783.58

24

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 24

Grand Total Areas:23,850.59 SF Walls 11,939.29 SF Ceiling SF Walls and Ceiling35,789.8812,201.45 SF Floor 1,355.72 SY Flooring 2,442.88 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 2,551.62 LF Ceil. Perimeter

12,201.45 Floor Area 12,506.34 Total Area 19,323.81 Interior Wall Area8,816.58 Exterior Wall Area 866.32 Exterior Perimeter of

Walls

0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length0.00 Total Ridge Length 0.00 Total Hip Length

25

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 25

SummaryLine Item Total 81,781.05

Material Sales Tax 2.53

Replacement Cost Value $81,783.58Net Claim $81,783.58

Adam Koch

26

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 26

Recap of Taxes

Material Sales Tax (5.5%)

Line Items 2.53

Total 2.53

27

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 27

Recap by Room

Estimate: USSMALLBUSINESS

Area: Main Level 5,223.96 6.39%Kitchen 1,146.19 1.40%Wash Area 736.67 0.90%Office 322.25 0.39%Stairs1 434.37 0.53%Entry 178.79 0.22%Large Cooler 465.09 0.57%Freezer 238.56 0.29%Bathroom Mens 538.53 0.66%Bathroom 494.60 0.60%Dinning 1 1,551.74 1.90%Hallway 2 281.62 0.34%Hallway 1,565.41 1.91%Back Bar 1,923.94 2.35%Dinning 2 2,461.62 3.01%Foyer/Entry 166.47 0.20%Stairs4 323.64 0.40%Stairs6 213.68 0.26%Stairs17 498.66 0.61%Front Bar 3,134.69 3.83%Coat Room 575.74 0.70%Stairs 324.35 0.40%

Area Subtotal: Main Level 27.88%22,800.57

Area: Loft 1,530.46 1.87%Loft 3,879.70 4.74%Coat Room 2 382.59 0.47%Closet 201.88 0.25%

Area Subtotal: Loft 7.33%5,994.63

Area: Basement 6,803.50 8.32%Room1 2,362.89 2.89%Room2 982.20 1.20%Room3 982.20 1.20%Room4 982.20 1.20%Stairs 363.71 0.44%Room5 1,764.24 2.16%Room6 2,259.18 2.76%Room7 6,226.21 7.61%Room8 7,524.95 9.20%Room9 9,197.21 11.25%

28

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 28

Room10 4,641.65 5.68%Miscellaneous 8,895.71 10.88%

Area Subtotal: Basement 64.79%52,985.85

Subtotal of Areas 100.00%81,781.05

Total 81,781.05 100.00%

29

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 29

Recap by Category

Items Total %

CLEANING 43,077.27 52.67%CONTENT MANIPULATION 1,946.88 2.38%GENERAL DEMOLITION 5,428.15 6.64%FLOOR COVERING - CARPET 2,535.87 3.10%HAZARDOUS MATERIAL REMEDIATION 460.70 0.56%LABOR ONLY 608.40 0.74%SCAFFOLDING 845.04 1.03%WATER EXTRACTION & REMEDIATION 26,878.74 32.87%

Subtotal 81,781.05 100.00%Material Sales Tax 2.53 0.00%

Total 81,783.58 100.00%

30

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 30

1 2014-07-29 14.08.29 Date Taken: 7/29/2014 Taken By: Adam Koch

31

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 31

2 2014-07-29 14.08.34 Date Taken: 7/29/2014 Taken By: Adam Koch

32

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 32

3 2014-07-29 14.08.39 Date Taken: 7/29/2014 Taken By: Adam Koch

33

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 33

4 2014-07-29 14.08.43 Date Taken: 7/29/2014 Taken By: Adam Koch

34

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 34

5 2014-07-29 14.08.58 Date Taken: 7/29/2014 Taken By: Adam Koch

35

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 35

6 2014-07-29 14.09.06 Date Taken: 7/29/2014 Taken By: Adam Koch

36

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 36

7 2014-07-29 14.09.11 Date Taken: 7/29/2014 Taken By: Adam Koch

37

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 37

8 2014-07-29 14.09.15 Date Taken: 7/29/2014 Taken By: Adam Koch

38

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 38

9 2014-07-29 14.09.19 Date Taken: 7/29/2014 Taken By: Adam Koch

39

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 39

10 2014-07-29 14.09.33 Date Taken: 7/29/2014 Taken By: Adam Koch

40

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 40

11 2014-07-29 14.09.38 Date Taken: 7/29/2014 Taken By: Adam Koch

41

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 41

12 2014-07-29 14.09.44 Date Taken: 7/29/2014 Taken By: Adam Koch

42

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 42

13 2014-07-29 14.09.50 Date Taken: 7/29/2014 Taken By: Adam Koch

43

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 43

14 2014-07-29 14.09.57 Date Taken: 7/29/2014 Taken By: Adam Koch

44

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 44

15 2014-07-29 14.10.19 Date Taken: 7/29/2014 Taken By: Adam Koch

45

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 45

16 2014-07-29 14.10.27 Date Taken: 7/29/2014 Taken By: Adam Koch

46

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 46

17 2014-07-29 14.10.39 Date Taken: 7/29/2014 Taken By: Adam Koch

47

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 47

18 2014-07-29 14.10.43 Date Taken: 7/29/2014 Taken By: Adam Koch

48

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 48

19 2014-07-29 14.10.47 Date Taken: 7/29/2014 Taken By: Adam Koch

49

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 49

20 2014-07-29 14.10.58 Date Taken: 7/29/2014 Taken By: Adam Koch

50

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 50

21 2014-07-29 14.11.03 Date Taken: 7/29/2014 Taken By: Adam Koch

51

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 51

22 2014-07-29 14.11.10 Date Taken: 7/29/2014 Taken By: Adam Koch

52

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 52

23 2014-07-29 14.12.31 Date Taken: 7/29/2014 Taken By: Adam Koch

53

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 53

24 2014-07-29 14.12.37 Date Taken: 7/29/2014 Taken By: Adam Koch

54

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 54

25 2014-07-29 14.12.42 Date Taken: 7/29/2014 Taken By: Adam Koch

55

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 55

26 2014-07-29 14.12.47 Date Taken: 7/29/2014 Taken By: Adam Koch

56

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 56

27 2014-07-29 14.12.53 Date Taken: 7/29/2014 Taken By: Adam Koch

57

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 57

28 2014-07-29 14.13.03 Date Taken: 7/29/2014 Taken By: Adam Koch

58

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 58

29 2014-07-29 14.13.09 Date Taken: 7/29/2014 Taken By: Adam Koch

59

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 59

30 2014-07-29 14.13.22 Date Taken: 7/29/2014 Taken By: Adam Koch

60

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 60

31 2014-07-29 14.13.29 Date Taken: 7/29/2014 Taken By: Adam Koch

61

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 61

32 2014-07-29 14.14.01 Date Taken: 7/29/2014 Taken By: Adam Koch

62

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 62

33 2014-07-29 14.14.07 Date Taken: 7/29/2014 Taken By: Adam Koch

63

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 63

34 2014-07-29 14.14.20 Date Taken: 7/29/2014 Taken By: Adam Koch

64

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 64

35 2014-07-29 14.14.37 Date Taken: 7/29/2014 Taken By: Adam Koch

65

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 65

36 2014-07-29 14.21.17 Date Taken: 7/29/2014 Taken By: Adam Koch

66

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 66

37 2014-07-29 14.21.24 Date Taken: 7/29/2014 Taken By: Adam Koch

67

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 67

38 2014-07-29 14.21.30 Date Taken: 7/29/2014 Taken By: Adam Koch

68

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 68

39 2014-07-29 14.21.36 Date Taken: 7/29/2014 Taken By: Adam Koch

69

Square One Restoration, Inc.

2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572

USSMALLBUSINESS 8/18/2014 Page: 69

40 2014-07-29 14.21.40 Date Taken: 7/29/2014 Taken By: Adam Koch