Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
Client: U.S. Small BusinessProperty: 50 West 6th Avenue
Oshkosh, WI
Operator: AMY
Estimator: Adam Koch Business: (920) 327-9126E-mail: adam@squareonerestoration.
comBusiness: 2121 Bellevue St
Green Bay, WI 54311
Reference:Company: Self Pay
Type of Estimate: Water DamageDate Entered: 8/11/2014 Date Assigned: 8/11/2014
Price List: WIGR8X_JUL14Labor Efficiency: Restoration/Service/Remodel
Estimate: USSMALLBUSINESS
This is our estimate to complete repairs due to water damage on your property.
2
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 2
USSMALLBUSINESS
Main LevelMain Level
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
1. Neg. air fan/Air scrub.-XLrg (per 24 16.00 DA 0.00 140.00 0.00 2,240.00hr period)-No monit.
8 negative air units for 48 hrs
2. Air mover axial fan (per 24 hour 44.00 EA 0.00 29.78 0.00 1,310.32period) - No monitoring
22 air movers for 48 hrs
3. Scaffold - per section (per week) 10.00 WK 0.00 48.00 0.00 480.00
4. Scaffolding Setup & Take down - 12.00 HR 0.00 30.42 0.00 365.04per hour
6. Cleaning Technician - per hour 12.00 HR 0.00 28.49 0.00 341.88
Needed for leaf blowing of mold spores
229. Content Manipulation charge - 16.00 HR 0.00 30.42 0.00 486.72per hour
needed to throw away remaining contents
Total: Main Level 0.00 5,223.96
Up
Up
Up
Up
Up
Up
UpUp
Up
Hallway 2
Dinning 1Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
7' 1"
12' 1
1"
7' 9
"
12'12' 4"
8' 1
"8'
1"
7' 7" 6' 1"
9' 8
"
9' 6
"
12' 2"11' 10"
4' 9
"4'
11"
38'37' 10"
9' 7
"
14' 5
"
Kitchen Height: 8'
1,027.45 SF Walls1,549.96 SF Walls & Ceiling
58.06 SY Flooring134.75 LF Ceil. Perimeter
522.51 SF Ceiling522.57 SF Floor127.17 LF Floor Perimeter
Missing Wall - Goes to Floor 7' 7" X 6' 8" Opens into WASH_AREA
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
7. Clean the walls and ceiling - Heavy 1,549.96 SF 0.00 0.29 0.00 449.49
9. Clean floor - tile - Heavy clean 522.57 SF 0.00 0.54 0.00 282.19
10. Apply anti-microbial agent 2,072.53 SF 0.00 0.20 0.00 414.51
Totals: Kitchen 0.00 1,146.19
3
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 3
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
6' 3
"
6' 3
"
3' 2
"3'25' 8"
26' 4"
15' 1
1"
17' 4
"1'
7" 7' 7" 6' 1"
8' 1
"8'
1"
12'12' 4"
Wash Area Height: 8'
637.29 SF Walls982.33 SF Walls & Ceiling38.34 SY Flooring85.98 LF Ceil. Perimeter
345.04 SF Ceiling345.04 SF Floor78.40 LF Floor Perimeter
Missing Wall - Goes to Floor 7' 7" X 6' 8" Opens into KITCHEN
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
11. Clean the walls and ceiling - 982.33 SF 0.00 0.29 0.00 284.88Heavy
13. Clean floor - tile - Heavy clean 345.04 SF 0.00 0.54 0.00 186.32
14. Apply anti-microbial agent 1,327.37 SF 0.00 0.20 0.00 265.47
Totals: Wash Area 0.00 736.67
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
12'
1' 7
"9'
8"
11' 1
"
12' 2"
11' 10"
11' 3
"
Office Height: 8'
366.38 SF Walls497.31 SF Walls & Ceiling14.55 SY Flooring45.80 LF Ceil. Perimeter
130.94 SF Ceiling130.94 SF Floor45.80 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
15. Clean the walls and ceiling - 497.31 SF 0.00 0.29 0.00 144.22Heavy
19. Apply anti-microbial agent 628.25 SF 0.00 0.20 0.00 125.65
203. Clean floor - Heavy 130.94 SF 0.00 0.40 0.00 52.38
Totals: Office 0.00 322.25
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 10"
5' 4
"
5' 8
"
5' 6
"
Stairs1 Height: 17'
165.08 SF Walls186.17 SF Walls & Ceiling
4.37 SY Flooring11.17 LF Ceil. Perimeter
21.08 SF Ceiling39.29 SF Floor13.44 LF Floor Perimeter
Missing Wall 3' 10" X 17' Opens into ENTRY
4
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 4
CONTINUED - Stairs1
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 10"9"2'
5"
8'
8' 6"
3' 2
"3' 10"
Subroom: Landing1 (2) Height: 17'
243.67 SF Walls269.00 SF Walls & Ceiling
2.81 SY Flooring14.33 LF Ceil. Perimeter
25.33 SF Ceiling25.33 SF Floor14.33 LF Floor Perimeter
Missing Wall 3' 10" X 17' Opens into STAIRS3
Missing Wall 3' 10" X 17' Opens into STAIRS1
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 10"
5' 6
"
4' 2"
5' 4
"
5' 8
"
Subroom: Stairs3 (1) Height: 17'
205.25 SF Walls225.69 SF Walls & Ceiling
4.29 SY Flooring14.50 LF Ceil. Perimeter
20.44 SF Ceiling38.65 SF Floor17.00 LF Floor Perimeter
Missing Wall 3' 10" X 17' Opens into LANDING1
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
20. Clean the walls and ceiling - 680.86 SF 0.00 0.29 0.00 197.45Heavy
21. Apply anti-microbial agent 784.14 SF 0.00 0.20 0.00 156.83
204. Clean floor - Heavy 103.28 SF 0.00 0.40 0.00 41.31
227. Remove 1/2" drywall - hung, 66.86 SF 0.31 0.00 0.00 20.73taped, heavy texture, ready for paint
228. Remove Batt insulation - 10" - 66.86 SF 0.27 0.00 0.00 18.05R30 - unfaced batt
Totals: Stairs1 0.00 434.37
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 10"3' 10"
4' 2"
1' 5
"
7' 4
"
5' 9
"
3' 4" 4' 8"
8'
4' 9
"2'
5"
7' 6
"
Entry Height: 8'
216.00 SF Walls275.31 SF Walls & Ceiling
6.59 SY Flooring30.83 LF Ceil. Perimeter
59.31 SF Ceiling59.31 SF Floor27.00 LF Floor Perimeter
Missing Wall 3' 10" X 8' Opens into STAIRS1
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
5
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 5
CONTINUED - Entry
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
22. Clean the walls and ceiling - 275.31 SF 0.00 0.29 0.00 79.84Heavy
24. Clean floor - tile - Heavy clean 59.31 SF 0.00 0.54 0.00 32.03
25. Apply anti-microbial agent 334.61 SF 0.00 0.20 0.00 66.92
Totals: Entry 0.00 178.79
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
10' 8"10' 4"
5' 1
1"
5' 9
"
18' 10"18' 8"
13' 9
"
14' 3
"
8'
8' 6"
8'7'
8"
Large Cooler Height: 8'
518.80 SF Walls690.25 SF Walls & Ceiling19.05 SY Flooring64.85 LF Ceil. Perimeter
171.45 SF Ceiling171.45 SF Floor64.85 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
26. Clean the walls and ceiling - 690.25 SF 0.00 0.29 0.00 200.17Heavy
28. Clean floor - tile - Heavy clean 171.45 SF 0.00 0.54 0.00 92.58
29. Apply anti-microbial agent 861.70 SF 0.00 0.20 0.00 172.34
Totals: Large Cooler 0.00 465.09
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
10' 6"
6' 3
"1'
5"
7' 8
"
10' 8"
10' 4"
8'
Freezer Height: 8'
288.00 SF Walls367.22 SF Walls & Ceiling
8.80 SY Flooring36.00 LF Ceil. Perimeter
79.22 SF Ceiling79.22 SF Floor36.00 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
30. Clean the walls and ceiling - 367.22 SF 0.00 0.29 0.00 106.49Heavy
32. Clean floor - tile - Heavy clean 79.22 SF 0.00 0.54 0.00 42.78
33. Apply anti-microbial agent 446.44 SF 0.00 0.20 0.00 89.29
Totals: Freezer 0.00 238.56
6
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 6
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
8'
8' 6"
14' 1
0"
2' 6"4' 3"
4' 5"
15' 2
"
Bathroom Mens Height: 8'
365.33 SF Walls484.00 SF Walls & Ceiling13.19 SY Flooring45.67 LF Ceil. Perimeter
118.67 SF Ceiling118.67 SF Floor45.67 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
38. Clean the walls and ceiling - 484.00 SF 0.00 0.29 0.00 140.36Heavy
39. Clean toilet - Heavy 4.00 EA 0.00 19.23 0.00 76.92
40. Clean toilet seat - Heavy 4.00 EA 0.00 4.03 0.00 16.12
41. Clean urinal - Heavy 4.00 EA 0.00 18.59 0.00 74.36
42. Clean sink - Heavy 4.00 EA 0.00 11.54 0.00 46.16
43. Clean floor - tile - Heavy clean 118.67 SF 0.00 0.54 0.00 64.08
44. Apply anti-microbial agent 602.67 SF 0.00 0.20 0.00 120.53
Totals: Bathroom Mens 0.00 538.53
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
9' 2"
9' 8"
6' 3
"
14' 1
0"8'
10"
2' 6" 5' 10"
6'1' 2"
Bathroom Height: 8'
384.00 SF Walls519.97 SF Walls & Ceiling15.11 SY Flooring48.00 LF Ceil. Perimeter
135.97 SF Ceiling135.97 SF Floor48.00 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
45. Clean the walls and ceiling - 519.97 SF 0.00 0.29 0.00 150.79Heavy
46. Clean toilet - Heavy 4.00 EA 0.00 19.23 0.00 76.92
47. Clean toilet seat - Heavy 4.00 EA 0.00 4.03 0.00 16.12
48. Clean sink - Heavy 4.00 EA 0.00 11.54 0.00 46.16
49. Clean floor - tile - Heavy clean 135.97 SF 0.00 0.54 0.00 73.42
50. Apply anti-microbial agent 655.94 SF 0.00 0.20 0.00 131.19
Totals: Bathroom 0.00 494.60
7
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 7
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
10' 4"
10' 1"12' 6"
12' 9"
23'
23' 4
"
12' 1"11' 8" 8' 11" 3'
6"
8' 6
"8'
10"
Dinning 1 Height: 12'
915.59 SF Walls1,330.29 SF Walls & Ceiling
46.08 SY Flooring75.13 LF Ceil. Perimeter
414.70 SF Ceiling414.70 SF Floor75.13 LF Floor Perimeter
Missing Wall 3' 6" X 12' Opens into HALLWAY_2
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
51. Clean the walls and ceiling - 1,330.29 SF 0.00 0.29 0.00 385.78Heavy
52. Remove Glue down carpet 414.70 SF 0.47 0.00 0.00 194.91
53. Floor prep (scrape rubber back 414.70 SF 0.00 0.52 0.00 215.64residue)
57. Apply anti-microbial agent 1,744.99 SF 0.00 0.20 0.00 349.00
211. Clean floor - Heavy 414.70 SF 0.00 0.40 0.00 165.88
223. Remove 1/2" drywall - hung, 414.70 SF 0.31 0.00 0.00 128.56taped, heavy texture, ready for paint
226. Remove Batt insulation - 10" - 414.70 SF 0.27 0.00 0.00 111.97R30 - unfaced batt
Totals: Dinning 1 0.00 1,551.74
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
2' 6"4' 3"
4' 5"
3' 6
"
3' 8
"
17' 8"
2' 6" 5' 10"
6'1' 2"
Hallway 2 Height: 8'
312.27 SF Walls374.10 SF Walls & Ceiling
6.87 SY Flooring39.03 LF Ceil. Perimeter
61.83 SF Ceiling61.83 SF Floor39.03 LF Floor Perimeter
Missing Wall 3' 6" X 8' Opens into DINNING_1
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
58. Clean the walls and ceiling - 374.10 SF 0.00 0.29 0.00 108.49Heavy
59. Remove Glue down carpet 61.83 SF 0.47 0.00 0.00 29.06
60. Floor prep (scrape rubber back 61.83 SF 0.00 0.52 0.00 32.15residue)
61. Apply anti-microbial agent 435.93 SF 0.00 0.20 0.00 87.19
212. Clean floor - Heavy 61.83 SF 0.00 0.40 0.00 24.73
Totals: Hallway 2 0.00 281.62
8
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 8
Up
Up
Up
Up Up
Up
UpUp
Up
Hallway 2
Dinning 1Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
17' 8"
4' 1
"1' 8
"6'
5"
6' 7
"
37' 10"42' 8"
4' 8"
5' 7
"5'
9"
5' 1"
12' 1"11' 8" 8' 11"
Hallway Height: 8'
749.54 SF Walls1,199.97 SF Walls & Ceiling
50.05 SY Flooring97.10 LF Ceil. Perimeter
450.43 SF Ceiling450.43 SF Floor93.01 LF Floor Perimeter
Missing Wall - Goes to Floor 4' 1" X 6' 8" Opens into DINNING_2
Missing Wall 5' 7 1/16" X 8' Opens into BACK_BAR
Missing Wall 5' 1" X 8' Opens into BACK_BAR
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
62. Clean the walls and ceiling - 1,199.97 SF 0.00 0.29 0.00 347.99Heavy
63. Remove Glue down carpet 450.43 SF 0.47 0.00 0.00 211.70
64. Floor prep (scrape rubber back 450.43 SF 0.00 0.52 0.00 234.22residue)
65. Apply anti-microbial agent 1,650.40 SF 0.00 0.20 0.00 330.08
213. Clean floor - Heavy 450.43 SF 0.00 0.40 0.00 180.17
222. Remove 1/2" drywall - hung, 450.43 SF 0.31 0.00 0.00 139.63taped, heavy texture, ready for paint
224. Remove Batt insulation - 10" - 450.43 SF 0.27 0.00 0.00 121.62R30 - unfaced batt
Totals: Hallway 0.00 1,565.41
Up
Up
Up
Up Up
Up
UpUp
Up
Hallway 2
Dinning 1Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
4' 7
"4'
7"
20' 8"21' 4"
36' 8
"37
' 2"
18' 8"22' 2"
3' 4"
5' 7
"5'
9"
5' 1"
23'
23' 4
"
6' 7"Back Bar Height: 8'
938.62 SF Walls1,862.29 SF Walls & Ceiling
102.63 SY Flooring117.33 LF Ceil. Perimeter
923.68 SF Ceiling923.68 SF Floor117.33 LF Floor Perimeter
Missing Wall 5' 9 1/16" X 8' Opens into HALLWAY
Missing Wall 5' 1" X 8' Opens into HALLWAY
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
66. Clean the walls and ceiling - 1,862.29 SF 0.00 0.29 0.00 540.06Heavy
68. Remove Glue down carpet 461.84 SF 0.47 0.00 0.00 217.06
69. Floor prep (scrape rubber back 461.84 SF 0.00 0.52 0.00 240.16residue)
70. Apply anti-microbial agent 2,785.97 SF 0.00 0.20 0.00 557.19
9
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 9
CONTINUED - Back Bar
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
214. Clean floor - Heavy 923.68 SF 0.00 0.40 0.00 369.47
Totals: Back Bar 0.00 1,923.94
Up
Up
Up
Up Up
Up
UpUp
Up
Hallway 2
Dinning 1Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
4' 1
"
6' 5
"
6' 7
"
3' 6
"
3' 8
"
17' 7"
4' 1
1"
9' 6"
9' 4"
11' 4
"7'
2"
7' 6
"
3' 11"
6' 6
"
4' 5"
9' 1" 1' 6
"45' 10"
Dinning 2 Height: 28'
3,007.61 SF Walls3,482.56 SF Walls & Ceiling
52.77 SY Flooring136.92 LF Ceil. Perimeter
474.95 SF Ceiling474.95 SF Floor76.83 LF Floor Perimeter
Missing Wall - Goes to Floor 4' 1" X 6' 8" Opens into HALLWAY
Missing Wall 4' 11" X 28' Opens into FOYER_ENTRY
Missing Wall 5' 3" X 28' Opens into STAIRS17
Missing Wall 3' 11" X 28' Opens into STAIRS21
Missing Wall 45' 10" X 28' Opens into FRONT_BAR
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
71. Clean the walls and ceiling - 3,482.56 SF 0.00 0.29 0.00 1,009.94Heavy
73. Remove Glue down carpet 474.95 SF 0.47 0.00 0.00 223.23
74. Floor prep (scrape rubber back 474.95 SF 0.00 0.52 0.00 246.97residue)
75. Apply anti-microbial agent 3,957.51 SF 0.00 0.20 0.00 791.50
200. Clean floor - Heavy 474.95 SF 0.00 0.40 0.00 189.98
Totals: Dinning 2 0.00 2,461.62
UpU
p
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
10' 6"
4' 1
1"
10"9' 4"
Foyer/Entry Height: 8'
168.00 SF Walls219.63 SF Walls & Ceiling
5.74 SY Flooring25.92 LF Ceil. Perimeter
51.63 SF Ceiling51.63 SF Floor21.00 LF Floor Perimeter
Missing Wall 4' 11" X 8' Opens into DINNING_2
Missing Wall 4' 11" X 8' Opens into STAIRS4
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
10
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 10
CONTINUED - Foyer/Entry
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
76. Clean the walls and ceiling - 219.63 SF 0.00 0.29 0.00 63.69Heavy
77. Clean floor - tile - Heavy clean 51.63 SF 0.00 0.54 0.00 27.88
78. Apply anti-microbial agent 271.25 SF 0.00 0.20 0.00 54.25
215. Clean floor - Heavy 51.63 SF 0.00 0.40 0.00 20.65
Totals: Foyer/Entry 0.00 166.47
Up
Up
Up
Up
Up
UpUp
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
13' 2"
4' 1
1"
13' 4"
13'
Stairs4 Height: 15' 6"
310.85 SF Walls375.58 SF Walls & Ceiling11.54 SY Flooring26.50 LF Ceil. Perimeter
64.73 SF Ceiling103.86 SF Floor29.89 LF Floor Perimeter
Missing Wall 4' 11" X 15' 6" Opens into FOYER_ENTRY
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
4' 1
1"
4' 5"
5' 1
"
5' 5
"
4' 7"
4' 11"Subroom: Stairs5 (1) Height: 10' 6"
105.92 SF Walls129.21 SF Walls & Ceiling
2.59 SY Flooring9.67 LF Ceil. Perimeter
23.29 SF Ceiling23.30 SF Floor9.67 LF Floor Perimeter
Missing Wall 4' 11" X 10' 6" Opens into STAIRS4
Missing Wall 4' 5" X 10' 6" Opens into STAIRS6
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
79. Clean the walls and ceiling - 504.79 SF 0.00 0.29 0.00 146.39Heavy
80. Apply anti-microbial agent 631.95 SF 0.00 0.20 0.00 126.39
216. Clean floor - Heavy 127.16 SF 0.00 0.40 0.00 50.86
Totals: Stairs4 0.00 323.64
11
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 11
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
4' 5"
10' 1
0"
11'
4' 7"
11'
10' 8
"
Stairs6 Height: 17'
276.24 SF Walls324.09 SF Walls & Ceiling10.16 SY Flooring21.83 LF Ceil. Perimeter
47.85 SF Ceiling91.46 SF Floor27.06 LF Floor Perimeter
Missing Wall 4' 5" X 17' Opens into STAIRS5
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
81. Clean the walls and ceiling - 324.09 SF 0.00 0.29 0.00 93.99Heavy
82. Apply anti-microbial agent 415.55 SF 0.00 0.20 0.00 83.11
217. Clean floor - Heavy 91.46 SF 0.00 0.40 0.00 36.58
Totals: Stairs6 0.00 213.68
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
7' 4
"
5' 3" 4"
7' 2
"
7' 6
"
Stairs17 Height: 11' 9"
143.40 SF Walls181.90 SF Walls & Ceiling
6.73 SY Flooring14.50 LF Ceil. Perimeter
38.50 SF Ceiling60.57 SF Floor15.76 LF Floor Perimeter
Missing Wall 5' 3" X 11' 9" Opens into DINNING_2
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
5' 3"
3' 1
0"
5' 5"
4'
Subroom: Stairs18 (2) Height: 10' 6"
97.13 SF Walls118.13 SF Walls & Ceiling
2.33 SY Flooring9.25 LF Ceil. Perimeter
21.00 SF Ceiling21.00 SF Floor9.25 LF Floor Perimeter
Missing Wall 5' 3" X 10' 6" Opens into STAIRS17
Missing Wall 3' 10" X 10' 6" Opens into STAIRS21
12
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 12
CONTINUED - Stairs17
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
4'
4"
6' 6
"
7' 2
"
4' 6"
6' 8
"
Subroom: Stairs19 (1) Height: 11' 9"
161.81 SF Walls188.48 SF Walls & Ceiling
4.39 SY Flooring17.17 LF Ceil. Perimeter
26.67 SF Ceiling39.50 SF Floor18.54 LF Floor Perimeter
Missing Wall 4' X 11' 9" Opens into STAIRS20
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 1
0"
4'
4' 4
"
4'
4' 4"Subroom: Stairs20 (4) Height: 10' 6"
84.00 SF Walls100.00 SF Walls & Ceiling
1.78 SY Flooring8.00 LF Ceil. Perimeter
16.00 SF Ceiling16.00 SF Floor8.00 LF Floor Perimeter
Missing Wall 3' 10" X 10' 6" Opens into STAIRS21
Missing Wall 4' X 10' 6" Opens into STAIRS19
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
4" 3' 11"
3' 1
0"
4' 7"Subroom: Stairs21 (3) Height: 10' 6"
48.35 SF Walls66.58 SF Walls & Ceiling3.22 SY Flooring5.25 LF Ceil. Perimeter
18.22 SF Ceiling28.98 SF Floor5.67 LF Floor Perimeter
Missing Wall 3' 10" X 10' 6" Opens into STAIRS18
Missing Wall 3' 11" X 10' 6" Opens into DINNING_2
Missing Wall 3' 10" X 10' 6" Opens into STAIRS20
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
83. Clean the walls and ceiling - 655.08 SF 0.00 0.29 0.00 189.97Heavy
84. Apply anti-microbial agent 821.13 SF 0.00 0.20 0.00 164.23
199. Remove Glue down carpet 166.05 SF 0.47 0.00 0.00 78.04
218. Clean floor - Heavy 166.05 SF 0.00 0.40 0.00 66.42
Totals: Stairs17 0.00 498.66
13
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 13
Up
Up
Up
Up Up
Up
UpUp
Up
Hallway 2
Dinning 1Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
8' 2
"8'
4"
11' 7"11' 3"
10' 1
0"14
' 4"
3' 11' 5"
11' 1"
4' 5
"
7' 2"7' 2"
6' 4
"
13' 7"14' 3"
35' 1
0"
36' 2
"
45' 10"
Front Bar Height: 14' 6"
1,703.75 SF Walls2,809.45 SF Walls & Ceiling
122.86 SY Flooring163.33 LF Ceil. Perimeter
1,105.70 SF Ceiling1,105.70 SF Floor
117.50 LF Floor Perimeter
Missing Wall 45' 10" X 14' 6" Opens into DINNING_2
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
85. Clean the walls and ceiling - 2,809.45 SF 0.00 0.29 0.00 814.74Heavy
87. Remove Glue down carpet 1,105.70 SF 0.47 0.00 0.00 519.68
88. Floor prep (scrape rubber back 1,105.70 SF 0.00 0.52 0.00 574.96residue)
89. Apply anti-microbial agent 3,915.15 SF 0.00 0.20 0.00 783.03
219. Clean floor - Heavy 1,105.70 SF 0.00 0.40 0.00 442.28
Totals: Front Bar 0.00 3,134.69Up
Up
UpU
p
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2Stairs17
4' 10"5'
8' 4
"8'
6' 5"
6' 1"
11' 4
"10
' 10"
11' 7"11' 3"
4' 1
0"7'
9"
19' 2
"
6' 3
"
Coat Room Height: 8'
486.67 SF Walls648.82 SF Walls & Ceiling18.02 SY Flooring60.83 LF Ceil. Perimeter
162.15 SF Ceiling162.15 SF Floor60.83 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
90. Clean the walls and ceiling - 648.82 SF 0.00 0.29 0.00 188.16Heavy
92. Remove Glue down carpet 162.15 SF 0.47 0.00 0.00 76.21
93. Floor prep (scrape rubber back 162.15 SF 0.00 0.52 0.00 84.32residue)
94. Apply anti-microbial agent 810.97 SF 0.00 0.20 0.00 162.19
220. Clean floor - Heavy 162.15 SF 0.00 0.40 0.00 64.86
Totals: Coat Room 0.00 575.74
14
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 14
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 1
0"
4' 6"
4' 10"
4' 8"
Stairs Height: 17'
140.50 SF Walls158.39 SF Walls & Ceiling
4.01 SY Flooring9.50 LF Ceil. Perimeter
17.89 SF Ceiling36.10 SF Floor12.11 LF Floor Perimeter
Missing Wall 3' 10" X 17' Opens into Exterior
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 1
0"
4' 6"
3'1'
4' 10"
Subroom: Stairs2 (1) Height: 17'
180.67 SF Walls197.92 SF Walls & Ceiling
3.94 SY Flooring12.83 LF Ceil. Perimeter
17.25 SF Ceiling35.46 SF Floor15.69 LF Floor Perimeter
Missing Wall 3' 10" X 17' Opens into LANDING
Up
Up
Up
Up
Up
Up
Up
Up
Up
Hallway 2
Dinning 1
Bathroom Mens
Hallway
Back Bar
Bathroom
Freezer
Large Cooler
Coat Room
Kitchen
Wash Area
Stairs1
Stairs
Entry
Office
Stairs4Foyer/Entry
Stairs6
Front Bar
Dinning 2
Stairs17
3' 1
0"
1' 11"
8' 4
"
8'
1' 9"
3' 1
0"
Subroom: Landing (2) Height: 17'
189.83 SF Walls202.50 SF Walls & Ceiling
1.41 SY Flooring11.17 LF Ceil. Perimeter
12.67 SF Ceiling12.67 SF Floor11.17 LF Floor Perimeter
Missing Wall 3' 10" X 17' Opens into STAIRS2
Missing Wall 3' 10" X 17' Opens into STAIRS
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
95. Clean the walls and ceiling - 558.81 SF 0.00 0.29 0.00 162.05Heavy
96. Apply anti-microbial agent 643.03 SF 0.00 0.20 0.00 128.61
221. Clean floor - Heavy 84.22 SF 0.00 0.40 0.00 33.69
Totals: Stairs 0.00 324.35
Total: Main Level 0.00 22,800.57
LoftLoft
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
97. Neg. air fan/Air scrub.-XLrg (per 4.00 DA 0.00 140.00 0.00 560.0024 hr period)-No monit.
15
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 15
CONTINUED - Loft
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
2 negative air machines for 48 hrs
98. Air mover axial fan (per 24 hour 16.00 EA 0.00 29.78 0.00 476.48period) - No monitoring
8 air movers for 48 hrs
100. Cleaning Technician - per hour 12.00 HR 0.00 28.49 0.00 341.88
Needed for leaf blowing of mold spores
198. Content Manipulation charge - 5.00 HR 0.00 30.42 0.00 152.10per hour
to throw away any contents affected
Total: Loft 0.00 1,530.46
Up
Up
Up
Up Up
Up
UpUp
Up
UpU
p
Loft
Coat Room 2
Closet
56' 8
"
57' 4
"
9' 1"
9' 7"
8' 5
" 4' 1
1"17' 11"18' 7"
8' 1
1"9'
7"
4' 1"18' 2"
37' 8
"38
' 4"
11'11' 8"
2'
32'31' 4"
21'
21'
3'3' 8"
Loft Height: 8'
1,961.44 SF Walls3,404.10 SF Walls & Ceiling
160.30 SY Flooring242.08 LF Ceil. Perimeter
1,442.66 SF Ceiling1,442.66 SF Floor
242.08 LF Floor Perimeter
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Loft
Coat Room 2
Closet
3'
4"
1' 5
"
1' 1
"
8' 1"
4' 5
"
8' 5"
Subroom: Stairs (2) Height: 13' 8"
182.51 SF Walls219.13 SF Walls & Ceiling
7.05 SY Flooring16.88 LF Ceil. Perimeter
36.63 SF Ceiling63.46 SF Floor19.29 LF Floor Perimeter
Missing Wall 3' X 13' 7 1/2" Opens into LOFT
Missing Wall 4' 4 3/4" X 13' 7 1/2" Opens into STAIRS1
Up
Up
Up
Up
Up
UpUp
Up
Up
Up
Up
Loft
Coat Room 2
Closet
3' 10"
4'
8' 5
"
4' 5
"
Subroom: Stairs1 (3) Height: 10' 3"
164.58 SF Walls196.73 SF Walls & Ceiling
3.57 SY Flooring16.06 LF Ceil. Perimeter
32.14 SF Ceiling32.14 SF Floor16.06 LF Floor Perimeter
Missing Wall 4' 4 3/4" X 10' 3" Opens into STAIRS
Missing Wall 3' 8 1/2" X 10' 3" Opens into STAIRS2
16
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 16
CONTINUED - Loft
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Loft
Coat Room 2
Closet
3' 8
"
8' 1"
8' 5"
4'
Subroom: Stairs2 (1) Height: 13' 8"
204.96 SF Walls235.01 SF Walls & Ceiling
5.81 SY Flooring19.92 LF Ceil. Perimeter
30.06 SF Ceiling52.30 SF Floor22.82 LF Floor Perimeter
Missing Wall 3' 8 1/2" X 13' 7 1/2" Opens into STAIRS1
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
101. Clean the walls and ceiling - 4,054.98 SF 0.00 0.29 0.00 1,175.94Heavy
103. Remove Glue down carpet 1,590.56 SF 0.47 0.00 0.00 747.56
104. Floor prep (scrape rubber back 1,590.56 SF 0.00 0.52 0.00 827.09residue)
105. Apply anti-microbial agent 5,645.54 SF 0.00 0.20 0.00 1,129.11
Totals: Loft 0.00 3,879.70
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Loft
Coat Room 2
Closet
14'
14' 4"
5' 3
"
1' 9" 11' 11"
14' 2"
4' 1
1"
Coat Room 2 Height: 8'
264.34 SF Walls332.60 SF Walls & Ceiling
7.58 SY Flooring33.04 LF Ceil. Perimeter
68.26 SF Ceiling68.26 SF Floor33.04 LF Floor Perimeter
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Loft
Coat Room 2
Closet
8' 1
1"
9' 7
"
3' 11"
4' 3"
4' 1
1"3'
8"
4'
3' 9"
4' 1"
Subroom: Room4 (1) Height: 8'
164.99 SF Walls199.24 SF Walls & Ceiling
3.81 SY Flooring20.62 LF Ceil. Perimeter
34.25 SF Ceiling34.25 SF Floor20.62 LF Floor Perimeter
Missing Wall 4' 10 1/2" X 8' Opens into COAT_ROOM_2
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
106. Clean the walls and ceiling - 531.84 SF 0.00 0.29 0.00 154.23Heavy
107. Remove Glue down carpet 102.51 SF 0.47 0.00 0.00 48.18
17
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 17
CONTINUED - Coat Room 2
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
108. Floor prep (scrape rubber back 102.51 SF 0.00 0.52 0.00 53.31residue)
109. Apply anti-microbial agent 634.35 SF 0.00 0.20 0.00 126.87
Totals: Coat Room 2 0.00 382.59
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Up
Loft
Coat Room 2
Closet
8' 9
"
6' 6"
8' 5
"
1' 9"
6' 2"
4' 7" Closet Height: 8'
233.64 SF Walls285.66 SF Walls & Ceiling
5.78 SY Flooring29.21 LF Ceil. Perimeter
52.02 SF Ceiling52.02 SF Floor29.21 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
110. Clean the walls and ceiling - 285.66 SF 0.00 0.29 0.00 82.84Heavy
111. Remove Glue down carpet 52.02 SF 0.47 0.00 0.00 24.45
112. Floor prep (scrape rubber back 52.02 SF 0.00 0.52 0.00 27.05residue)
113. Apply anti-microbial agent 337.68 SF 0.00 0.20 0.00 67.54
Totals: Closet 0.00 201.88
Total: Loft 0.00 5,994.63
BasementBasement
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
114. Neg. air fan/Air scrub.-XLrg (per 16.00 DA 0.00 140.00 0.00 2,240.0024 hr period)-No monit.
8 neg air machines for 48 hrs
115. Air mover axial fan (per 24 hour 48.00 EA 0.00 29.78 0.00 1,429.44period) - No monitoring
24 fans for 48 hrs
116. Dehumidifier (per 24 hour period) 18.00 EA 0.00 114.72 0.00 2,064.96- XLarge - No monitoring
6 dehus for 3 days
172. Containment 400.00 SF 0.00 0.85 1.76 341.76Barrier/Airlock/Decon. Chamber
18
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 18
CONTINUED - Basement
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
174. Containment Barrier - tension 30.00 DA 0.00 3.30 0.00 99.00post - per day
3 poles for 5 days in 2 stairwells
175. Peel & seal zipper 2.00 EA 0.00 10.85 0.77 22.47
197. General Laborer - per hour 20.00 HR 0.00 30.42 0.00 608.40
needed to leaf blow mold for cleaning
Total: Basement 2.53 6,806.03
Up
Up Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
14' 7
"
15' 3
"
3' 10"4' 4"
9' 1
0"
9' 6
"
5' 5'
16'
5'
4' 9
"
4' 1
1"
19' 10"
20' 4" Room1 Height: 8'
550.87 SF Walls682.82 SF Walls & Ceiling14.66 SY Flooring68.86 LF Ceil. Perimeter
131.95 SF Ceiling131.95 SF Floor68.86 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
117. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour
118. Dry ice blasting 682.82 SF 0.00 2.79 0.00 1,905.07
120. Apply anti-microbial agent 814.77 SF 0.00 0.20 0.00 162.95
176. Remove 1/2" drywall - hung & 682.82 SF 0.31 0.00 0.00 211.67fire taped only
185. Clean floor - Heavy 131.95 SF 0.00 0.40 0.00 52.78
Totals: Room1 0.00 2,362.89
Up
Up
Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
5' 2"
5'
9' 6
"
9' 1
0"
Room2 Height: 8'
232.20 SF Walls279.77 SF Walls & Ceiling
5.28 SY Flooring29.03 LF Ceil. Perimeter
47.56 SF Ceiling47.56 SF Floor29.03 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
121. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour
19
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 19
CONTINUED - Room2
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
122. Dry ice blasting 279.77 SF 0.00 2.79 0.00 780.56
124. Apply anti-microbial agent 327.33 SF 0.00 0.20 0.00 65.47
178. Remove 1/2" drywall - hung & 279.77 SF 0.31 0.00 0.00 86.73fire taped only
186. Clean floor - Heavy 47.56 SF 0.00 0.40 0.00 19.02
Totals: Room2 0.00 982.20
Up
Up
Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
5' 4"
5'
9' 6
"
Room3 Height: 8'
232.20 SF Walls279.77 SF Walls & Ceiling
5.28 SY Flooring29.03 LF Ceil. Perimeter
47.56 SF Ceiling47.56 SF Floor29.03 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
125. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour
126. Dry ice blasting 279.77 SF 0.00 2.79 0.00 780.56
128. Apply anti-microbial agent 327.33 SF 0.00 0.20 0.00 65.47
179. Remove 1/2" drywall - hung & 279.77 SF 0.31 0.00 0.00 86.73fire taped only
187. Clean floor - Heavy 47.56 SF 0.00 0.40 0.00 19.02
Totals: Room3 0.00 982.20
Up
Up
Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
9' 1
0"
5' 6"
5'
9' 6
"
5' 4"
Room4 Height: 8'
232.20 SF Walls279.77 SF Walls & Ceiling
5.28 SY Flooring29.03 LF Ceil. Perimeter
47.56 SF Ceiling47.56 SF Floor29.03 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
129. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour
130. Dry ice blasting 279.77 SF 0.00 2.79 0.00 780.56
20
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 20
CONTINUED - Room4
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
132. Apply anti-microbial agent 327.33 SF 0.00 0.20 0.00 65.47
180. Remove 1/2" drywall - hung & 279.77 SF 0.31 0.00 0.00 86.73fire taped only
188. Clean floor - Heavy 47.56 SF 0.00 0.40 0.00 19.02
Totals: Room4 0.00 982.20
Up
Up
Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
3'
3' 5
"1'
4"
3' 4"
4' 9
"
4' 1
0"
Stairs Height: 11' 2"
81.91 SF Walls96.25 SF Walls & Ceiling2.90 SY Flooring8.40 LF Ceil. Perimeter
14.33 SF Ceiling26.11 SF Floor9.35 LF Floor Perimeter
Missing Wall 3' X 11' 1 1/2" Opens into ROOM5
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
133. Content Manipulation charge - 1.00 HR 0.00 30.42 0.00 30.42per hour
134. Dry ice blasting 96.25 SF 0.00 2.79 0.00 268.54
136. Apply anti-microbial agent 122.35 SF 0.00 0.20 0.00 24.47
182. Remove 1/2" drywall - hung & 96.25 SF 0.31 0.00 0.00 29.84fire taped only
189. Clean floor - Heavy 26.11 SF 0.00 0.40 0.00 10.44
Totals: Stairs 0.00 363.71
Up
Up Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
4' 9
" 8' 6"
8' 8"
16'
5' 2"
5' 8"1"4'
9"
4' 1
0"
3'
6' 1
" 11' 2
"
Room5 Height: 8'
365.37 SF Walls485.18 SF Walls & Ceiling13.31 SY Flooring48.67 LF Ceil. Perimeter
119.81 SF Ceiling119.81 SF Floor45.67 LF Floor Perimeter
Missing Wall 3' X 8' Opens into STAIRS
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
137. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour
138. Dry ice blasting 485.18 SF 0.00 2.79 0.00 1,353.65
21
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 21
CONTINUED - Room5
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
140. Apply anti-microbial agent 604.99 SF 0.00 0.20 0.00 121.00
181. Remove 1/2" drywall - hung & 485.18 SF 0.31 0.00 0.00 150.41fire taped only
190. Clean floor - Heavy 119.81 SF 0.00 0.40 0.00 47.92
Totals: Room5 0.00 1,764.24
Up
Up Up
Room1
Room2Room3Room4
Stairs
Room5
Room6
Room7
Room8
Room10
Room9
16'
16' 2
"
12'12' 2"
12' 2"
Room6 Height: 8'
448.04 SF Walls640.07 SF Walls & Ceiling21.34 SY Flooring56.00 LF Ceil. Perimeter
192.03 SF Ceiling192.03 SF Floor56.00 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
141. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour
142. Dry ice blasting 640.07 SF 0.00 2.79 0.00 1,785.80
144. Apply anti-microbial agent 832.10 SF 0.00 0.20 0.00 166.42
183. Remove 1/2" drywall - hung & 448.04 SF 0.31 0.00 0.00 138.89fire taped only
191. Clean floor - Heavy 192.03 SF 0.00 0.40 0.00 76.81
Totals: Room6 0.00 2,259.18
Up
Up Up
Room1
Room2Room3Room4
Stairs
Room5Room6
Room7
Room8
Room10
Room9
16'
33' 2
"17
'
27' 3"
27' 5"
16'
17' 2
"
27' 9"
Room7 Height: 8'
966.67 SF Walls1,870.46 SF Walls & Ceiling
100.42 SY Flooring120.83 LF Ceil. Perimeter
903.79 SF Ceiling903.79 SF Floor120.83 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
145. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour
146. Dry ice blasting 1,870.46 SF 0.00 2.79 0.00 5,218.58
148. Apply anti-microbial agent 2,774.25 SF 0.00 0.20 0.00 554.85
22
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 22
CONTINUED - Room7
DESCRIPTION QTY REMOVE REPLACE TOTALTAX
192. Clean floor - Heavy 903.79 SF 0.00 0.40 0.00 361.52
Totals: Room7 0.00 6,226.21
Up
Up Up
Room1
Room2Room3Room4
Stairs
Room5Room6
Room7
Room8
Room10
Room9
39' 7"40' 1"
29' 6
"
12' 27' 3"
29' 2
"
29' 4
"
Room8 Height: 8'
1,100.00 SF Walls2,254.51 SF Walls & Ceiling
128.28 SY Flooring137.50 LF Ceil. Perimeter
1,154.51 SF Ceiling1,154.51 SF Floor
137.50 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
149. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour
150. Dry ice blasting 2,254.51 SF 0.00 2.79 0.00 6,290.08
152. Apply anti-microbial agent 3,409.03 SF 0.00 0.20 0.00 681.81
193. Clean floor - Heavy 1,154.51 SF 0.00 0.40 0.00 461.80
Totals: Room8 0.00 7,524.95
Up
Up
Up
Room1
Room2Room3Room4Stairs
Room5Room6
Room7
Room8
Room10
Room9
46' 4
"
46' 1
0"
32' 2"32' 8"
29' 2
"17
'
Room9 Height: 8'
1,256.00 SF Walls2,746.39 SF Walls & Ceiling
165.60 SY Flooring157.00 LF Ceil. Perimeter
1,490.39 SF Ceiling1,490.39 SF Floor
157.00 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
153. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour
154. Dry ice blasting 2,746.39 SF 0.00 2.79 0.00 7,662.43
156. Apply anti-microbial agent 4,236.78 SF 0.00 0.20 0.00 847.36
194. Clean floor - Heavy 1,490.39 SF 0.00 0.40 0.00 596.16
Totals: Room9 0.00 9,197.21
23
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 23
Up
Up Up
Room1
Room2Room3Room4
Stairs
Room5Room6
Room7
Room8
Room10
Room9
32' 8"
16'
16' 6
"32' 2"
16' 2
"
Room10 Height: 8'
770.67 SF Walls1,285.33 SF Walls & Ceiling
57.19 SY Flooring96.33 LF Ceil. Perimeter
514.67 SF Ceiling514.67 SF Floor96.33 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
157. Content Manipulation charge - 3.00 HR 0.00 30.42 0.00 91.26per hour
158. Dry ice blasting 1,285.33 SF 0.00 2.79 0.00 3,586.07
160. Apply anti-microbial agent 1,800.00 SF 0.00 0.20 0.00 360.00
184. Remove 1/2" drywall - hung & 1,285.33 SF 0.31 0.00 0.00 398.45fire taped only
195. Clean floor - Heavy 514.67 SF 0.00 0.40 0.00 205.87
Totals: Room10 0.00 4,641.65
Miscellaneous
DESCRIPTION QTY REMOVE REPLACE TAX TOTAL
161. Dumpster load - Approx. 40 2.00 EA 664.03 0.00 0.00 1,328.06yards, 7-8 tons of debris
162. Equipment setup, take down, and 18.00 HR 0.00 45.51 0.00 819.18monitoring (hourly charge)
163. Add for HEPA filter (for neg. air 18.00 EA 0.00 234.42 0.00 4,219.56machine/vacuum - Large)
164. Add for personal protective 36.00 EA 0.00 7.01 0.00 252.36equipment (hazardous cleanup)
171. Content Manipulation charge - 20.00 HR 0.00 30.42 0.00 608.40per hour
to move contents out of building
196. Equipment decontamination 55.00 EA 0.00 30.33 0.00 1,668.15charge - per piece of equipment
Totals: Miscellaneous 0.00 8,895.71
Total: Basement 2.53 52,988.38
Line Item Totals: USSMALLBUSINESS 2.53 81,783.58
24
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 24
Grand Total Areas:23,850.59 SF Walls 11,939.29 SF Ceiling SF Walls and Ceiling35,789.8812,201.45 SF Floor 1,355.72 SY Flooring 2,442.88 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 2,551.62 LF Ceil. Perimeter
12,201.45 Floor Area 12,506.34 Total Area 19,323.81 Interior Wall Area8,816.58 Exterior Wall Area 866.32 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length0.00 Total Ridge Length 0.00 Total Hip Length
25
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 25
SummaryLine Item Total 81,781.05
Material Sales Tax 2.53
Replacement Cost Value $81,783.58Net Claim $81,783.58
Adam Koch
26
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 26
Recap of Taxes
Material Sales Tax (5.5%)
Line Items 2.53
Total 2.53
27
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 27
Recap by Room
Estimate: USSMALLBUSINESS
Area: Main Level 5,223.96 6.39%Kitchen 1,146.19 1.40%Wash Area 736.67 0.90%Office 322.25 0.39%Stairs1 434.37 0.53%Entry 178.79 0.22%Large Cooler 465.09 0.57%Freezer 238.56 0.29%Bathroom Mens 538.53 0.66%Bathroom 494.60 0.60%Dinning 1 1,551.74 1.90%Hallway 2 281.62 0.34%Hallway 1,565.41 1.91%Back Bar 1,923.94 2.35%Dinning 2 2,461.62 3.01%Foyer/Entry 166.47 0.20%Stairs4 323.64 0.40%Stairs6 213.68 0.26%Stairs17 498.66 0.61%Front Bar 3,134.69 3.83%Coat Room 575.74 0.70%Stairs 324.35 0.40%
Area Subtotal: Main Level 27.88%22,800.57
Area: Loft 1,530.46 1.87%Loft 3,879.70 4.74%Coat Room 2 382.59 0.47%Closet 201.88 0.25%
Area Subtotal: Loft 7.33%5,994.63
Area: Basement 6,803.50 8.32%Room1 2,362.89 2.89%Room2 982.20 1.20%Room3 982.20 1.20%Room4 982.20 1.20%Stairs 363.71 0.44%Room5 1,764.24 2.16%Room6 2,259.18 2.76%Room7 6,226.21 7.61%Room8 7,524.95 9.20%Room9 9,197.21 11.25%
28
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 28
Room10 4,641.65 5.68%Miscellaneous 8,895.71 10.88%
Area Subtotal: Basement 64.79%52,985.85
Subtotal of Areas 100.00%81,781.05
Total 81,781.05 100.00%
29
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 29
Recap by Category
Items Total %
CLEANING 43,077.27 52.67%CONTENT MANIPULATION 1,946.88 2.38%GENERAL DEMOLITION 5,428.15 6.64%FLOOR COVERING - CARPET 2,535.87 3.10%HAZARDOUS MATERIAL REMEDIATION 460.70 0.56%LABOR ONLY 608.40 0.74%SCAFFOLDING 845.04 1.03%WATER EXTRACTION & REMEDIATION 26,878.74 32.87%
Subtotal 81,781.05 100.00%Material Sales Tax 2.53 0.00%
Total 81,783.58 100.00%
30
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 30
1 2014-07-29 14.08.29 Date Taken: 7/29/2014 Taken By: Adam Koch
31
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 31
2 2014-07-29 14.08.34 Date Taken: 7/29/2014 Taken By: Adam Koch
32
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 32
3 2014-07-29 14.08.39 Date Taken: 7/29/2014 Taken By: Adam Koch
33
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 33
4 2014-07-29 14.08.43 Date Taken: 7/29/2014 Taken By: Adam Koch
34
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 34
5 2014-07-29 14.08.58 Date Taken: 7/29/2014 Taken By: Adam Koch
35
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 35
6 2014-07-29 14.09.06 Date Taken: 7/29/2014 Taken By: Adam Koch
36
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 36
7 2014-07-29 14.09.11 Date Taken: 7/29/2014 Taken By: Adam Koch
37
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 37
8 2014-07-29 14.09.15 Date Taken: 7/29/2014 Taken By: Adam Koch
38
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 38
9 2014-07-29 14.09.19 Date Taken: 7/29/2014 Taken By: Adam Koch
39
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 39
10 2014-07-29 14.09.33 Date Taken: 7/29/2014 Taken By: Adam Koch
40
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 40
11 2014-07-29 14.09.38 Date Taken: 7/29/2014 Taken By: Adam Koch
41
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 41
12 2014-07-29 14.09.44 Date Taken: 7/29/2014 Taken By: Adam Koch
42
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 42
13 2014-07-29 14.09.50 Date Taken: 7/29/2014 Taken By: Adam Koch
43
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 43
14 2014-07-29 14.09.57 Date Taken: 7/29/2014 Taken By: Adam Koch
44
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 44
15 2014-07-29 14.10.19 Date Taken: 7/29/2014 Taken By: Adam Koch
45
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 45
16 2014-07-29 14.10.27 Date Taken: 7/29/2014 Taken By: Adam Koch
46
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 46
17 2014-07-29 14.10.39 Date Taken: 7/29/2014 Taken By: Adam Koch
47
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 47
18 2014-07-29 14.10.43 Date Taken: 7/29/2014 Taken By: Adam Koch
48
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 48
19 2014-07-29 14.10.47 Date Taken: 7/29/2014 Taken By: Adam Koch
49
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 49
20 2014-07-29 14.10.58 Date Taken: 7/29/2014 Taken By: Adam Koch
50
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 50
21 2014-07-29 14.11.03 Date Taken: 7/29/2014 Taken By: Adam Koch
51
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 51
22 2014-07-29 14.11.10 Date Taken: 7/29/2014 Taken By: Adam Koch
52
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 52
23 2014-07-29 14.12.31 Date Taken: 7/29/2014 Taken By: Adam Koch
53
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 53
24 2014-07-29 14.12.37 Date Taken: 7/29/2014 Taken By: Adam Koch
54
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 54
25 2014-07-29 14.12.42 Date Taken: 7/29/2014 Taken By: Adam Koch
55
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 55
26 2014-07-29 14.12.47 Date Taken: 7/29/2014 Taken By: Adam Koch
56
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 56
27 2014-07-29 14.12.53 Date Taken: 7/29/2014 Taken By: Adam Koch
57
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 57
28 2014-07-29 14.13.03 Date Taken: 7/29/2014 Taken By: Adam Koch
58
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 58
29 2014-07-29 14.13.09 Date Taken: 7/29/2014 Taken By: Adam Koch
59
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 59
30 2014-07-29 14.13.22 Date Taken: 7/29/2014 Taken By: Adam Koch
60
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 60
31 2014-07-29 14.13.29 Date Taken: 7/29/2014 Taken By: Adam Koch
61
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 61
32 2014-07-29 14.14.01 Date Taken: 7/29/2014 Taken By: Adam Koch
62
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 62
33 2014-07-29 14.14.07 Date Taken: 7/29/2014 Taken By: Adam Koch
63
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 63
34 2014-07-29 14.14.20 Date Taken: 7/29/2014 Taken By: Adam Koch
64
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 64
35 2014-07-29 14.14.37 Date Taken: 7/29/2014 Taken By: Adam Koch
65
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 65
36 2014-07-29 14.21.17 Date Taken: 7/29/2014 Taken By: Adam Koch
66
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 66
37 2014-07-29 14.21.24 Date Taken: 7/29/2014 Taken By: Adam Koch
67
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 67
38 2014-07-29 14.21.30 Date Taken: 7/29/2014 Taken By: Adam Koch
68
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 68
39 2014-07-29 14.21.36 Date Taken: 7/29/2014 Taken By: Adam Koch
69
Square One Restoration, Inc.
2121 Bellevue St.Green Bay, WI 54311Tax ID # 20-0329572
USSMALLBUSINESS 8/18/2014 Page: 69
40 2014-07-29 14.21.40 Date Taken: 7/29/2014 Taken By: Adam Koch