DAILY WORK REPORT

PROJECT : NESTLE DISTRIBUTION CENTER

 NO.

WORK

CONTENTS WORK ITEMS ILLUSTRATING IMAGES NOTES

1

FOOTING

EXCAVATION

OF THE 1/C->EAXIS

FACTORY

2

POUR LINING

CONCRETE OF

THE 1/C->E

AXIS

FACTORY

8/16/2019 09.04.2016 Daily Work Report Nestle

http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 2/3

 

CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG

127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày

09/04/2016 

Page 2 of 3 

 NO. WORK WORK ITEMS ILLUSTRATING IMAGES NOTES

3

INSTALL

REBAR AND

FORMWORK

FOUNDATION

OF THE 1/C->E

& 7/D->E & D/1-

>7 & E/1->7

AXIS

FACTORY

4

POUR

CONCRETE

FOUNDATION

OF THE E/1->7

AXIS

FACTORY

8/16/2019 09.04.2016 Daily Work Report Nestle

http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 3/3

 

CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG

127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày

09/04/2016 

Page 3 of 3 

 NO. WORK WORK ITEMS ILLUSTRATING IMAGES NOTES

5

FOOTING

EXCAVATION

OF THE

FENCING WAY

OF THE A25 ->

A36AXIS

FENCING

WAY

4

FABRICATE

STEEL &

FORMWORK

FACTORY &

FENCING WAY