3
 CÔNG TY C PHN XÂY DỰ NG BÔNG SEN VÀNG 127 Nguyn Du , P . Bến Thành , Q 1 . TPHCM Ngày 09/04/2016 Page 1 of 3 DAILY WORK REPORT PROJECT : NESTLE DISTRIBUTION CENTER  NO. WORK CONTENTS WORK ITEMS ILLUSTRATING IMAGES NOTES 1 FOOTING EXCAVATION OF THE 1/C->E AXIS FACTORY 2 POUR LINING CONCRETE OF THE 1/C->E AXIS FACTORY

09.04.2016 Daily Work Report Nestle

  • Upload
    baldman

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 09.04.2016 Daily Work Report Nestle

8/16/2019 09.04.2016 Daily Work Report Nestle

http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 1/3

 

CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG

127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày

09/04/2016 

Page 1 of 3 

DAILY WORK REPORT

PROJECT : NESTLE DISTRIBUTION CENTER

 NO.

WORK

CONTENTS WORK ITEMS ILLUSTRATING IMAGES NOTES

1

FOOTING

EXCAVATION

OF THE 1/C->EAXIS

FACTORY

2

POUR LINING

CONCRETE OF

THE 1/C->E

AXIS

FACTORY

Page 2: 09.04.2016 Daily Work Report Nestle

8/16/2019 09.04.2016 Daily Work Report Nestle

http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 2/3

 

CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG

127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày

09/04/2016 

Page 2 of 3 

 NO. WORK WORK ITEMS ILLUSTRATING IMAGES NOTES

3

INSTALL

REBAR AND

FORMWORK

FOUNDATION

OF THE 1/C->E

& 7/D->E & D/1-

>7 & E/1->7

AXIS

FACTORY

4

POUR

CONCRETE

FOUNDATION

OF THE E/1->7

AXIS

FACTORY

Page 3: 09.04.2016 Daily Work Report Nestle

8/16/2019 09.04.2016 Daily Work Report Nestle

http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 3/3

 

CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG

127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày

09/04/2016 

Page 3 of 3 

 NO. WORK WORK ITEMS ILLUSTRATING IMAGES NOTES

5

FOOTING

EXCAVATION

OF THE

FENCING WAY

OF THE A25 ->

A36AXIS

FENCING

WAY

4

FABRICATE

STEEL &

FORMWORK

FACTORY &

FENCING WAY