Port management

Preview:

Citation preview

SLEEPING DOG PRODUCTIONSPRESENTS

PORT MACHINERY

PORT MACHINERY

MULTI-PURPOSE CRANES

CRANE ATTACHMENTS

CRANE ATTACHMENTS

RAIL MOUNTED GANTRY CRANESFOR CONTAINERS

RAIL MOUNTED GANTRY CRANES FOR BULK

COMMON PROBLEM: TRACK REPAIR

ESTIMATING GUIDES FOR CALCULATING SHOVEL OUTPUT

What is the production capacity of a 1 cy bucket working in moist loam for one 8 hour shift with a 75° angle of swing.

Table 2__ Hourly Shovel Output in Cubic Yards.

205 cy per hour * 8 hours = 1,640 cy per 8 hour shift* 1.05 = 1,722.00 *.97 = 1,670

Table 2.__ Hourly Short Boom Dragline Output in Cubic Yards.

160 cy per hour * 8 hours = 1,280 cy per 8 hour shift * 1.05 = 1,344.00 * .97 =1,304

There are other options the exam testers might use, such as 90° angle and an 80% optimum capacity.

40' = 80%60' = 91%80' = 98%100' = 100%120' = 97%140' = 91%160' = 85%

RTG AND RAIL GANTRY CRANES

SHIP BUILDING AND SHIP REPAIR

MOBILE HARBOR CRANES

MOBILE HARBOR CRANES

EMPTY CONTAINER MOVERS

COMMON FORK LIFT REACH HAULER

STANDARD HAULER

TYPES OF CONTAINERS

TYPES OF CONTAINERS

INTERMODAL CONNECTIONSPIPELINES, HIGHWAYS, RAILS

CONVEYORS AND RECLAIMERS

SELF LOADING AND UNLOADING BULK SHIPS

FRONT END LOADERVACUUM SPOUTS

SILO’S

SILOS FOR CONSTRUCTION MATERIALS

TANK FARMS

HUB TERMINAL

SINGLE POINT MOORINGS

LNG

FUEL AND LPG TERMINALS

REEFER CONTAINERS

GENERAL STORAGE WAREHOUSESAND REEFER STORAGE

PASSENGER TERMINALS

RO-RO DOCKING FACILITY

RO-RO STORAGE TERMINAL

RO-RO TRACTORS

PRESENTED BY:CAPTAIN JOHN BEASLEY,

SPECIAL THANKS TO MATE BULLY BEASLEY