Upload
john-beasley
View
14
Download
1
Embed Size (px)
Citation preview
SLEEPING DOG PRODUCTIONSPRESENTS
PORT MACHINERY
PORT MACHINERY
MULTI-PURPOSE CRANES
CRANE ATTACHMENTS
CRANE ATTACHMENTS
RAIL MOUNTED GANTRY CRANESFOR CONTAINERS
RAIL MOUNTED GANTRY CRANES FOR BULK
COMMON PROBLEM: TRACK REPAIR
ESTIMATING GUIDES FOR CALCULATING SHOVEL OUTPUT
What is the production capacity of a 1 cy bucket working in moist loam for one 8 hour shift with a 75° angle of swing.
Table 2__ Hourly Shovel Output in Cubic Yards.
205 cy per hour * 8 hours = 1,640 cy per 8 hour shift* 1.05 = 1,722.00 *.97 = 1,670
Table 2.__ Hourly Short Boom Dragline Output in Cubic Yards.
160 cy per hour * 8 hours = 1,280 cy per 8 hour shift * 1.05 = 1,344.00 * .97 =1,304
There are other options the exam testers might use, such as 90° angle and an 80% optimum capacity.
40' = 80%60' = 91%80' = 98%100' = 100%120' = 97%140' = 91%160' = 85%
RTG AND RAIL GANTRY CRANES
SHIP BUILDING AND SHIP REPAIR
MOBILE HARBOR CRANES
MOBILE HARBOR CRANES
EMPTY CONTAINER MOVERS
STRADDLE HAULERSIDE HAULERS
COMMON FORK LIFT REACH HAULER
STANDARD HAULER
TYPES OF CONTAINERS
TYPES OF CONTAINERS
INTERMODAL CONNECTIONSPIPELINES, HIGHWAYS, RAILS
CONVEYORS AND RECLAIMERS
SELF LOADING AND UNLOADING BULK SHIPS
FRONT END LOADERVACUUM SPOUTS
SILO’S
SILOS FOR CONSTRUCTION MATERIALS
TANK FARMS
HUB TERMINAL
SINGLE POINT MOORINGS
LNG
LNG
FUEL AND LPG TERMINALS
REEFER CONTAINERS
GENERAL STORAGE WAREHOUSESAND REEFER STORAGE
PASSENGER TERMINALS
RO-RO DOCKING FACILITY
RO-RO STORAGE TERMINAL
RO-RO TRACTORS
PRESENTED BY:CAPTAIN JOHN BEASLEY,
SPECIAL THANKS TO MATE BULLY BEASLEY