ESCO ATLANTIC - Epoxy Cool Roof System

Preview:

Citation preview

www.ESCOAtlantic.com (443) 553-5888

Epoxy Cool Roof Systems

This is the beginning of the job laying out the roof so that it can be scrubbed with harsh detergents and scrub brushes….the only way to eliminate all of the oils and dirt which get in

between the encapsulation process and the roof. s

Safety First

Bad areas can be replaced before ECRS installation

Repairing leaks

Preparation is the most important part of the job. All of the dirt and wales need to be removed so that the primer coat can fuse with the roof. The only way this can be done is by two hand

washings with harsh detergents and re-scrub again s

The roof is thoroughly washed and rinsed s

This is the roof before it is primer coated. This particular roof was about 26 thousand square feet and we started with the interior perimeter first and then build out from there

After prep....all coatings that may have been applied previously, are sanded

Beginning the process

Primer with polymesh fabric mat rolled in and then back rolled with 2nd coat of primer

Fiber and fabric on seams with 2 primer coats

Primer and fabric application

This is a picture of the primer coat with fiberglass strand embedded in it… there are 2 coats of this gray with fiberglass trends in it as well as a coat of reflective white epoxy as the finish

Epoxy with fiberglass strand as a primer coat

Close to finishing a large section

Closing out a large section

Closing out a large section

Further finishing up a section

Close up

Finished

Finished

www.ESCOAtlantic.com

(443) 553-5888

Epoxy Cool Roof Systems