View
2.675
Download
0
Category
Preview:
DESCRIPTION
Brief snapshot of Atkins BIM Capability in the Middle East
Citation preview
Atki M t Di i i (ME&I)Atkins Metro Division (ME&I)Building Information Modeling (BIM)g g ( )
Benefits of BIM• Better visualisation of the design, providing earlier, more
accurate and more easily understood designs;accurate and more easily understood designs;
• Provides better quality design, which is integrated and ti i doptimised;
• Improves communication and collaboration across multipleImproves communication and collaboration across multiple design disciplines;
R d i k th h d t ti f l h d• Reduces risk through detection of clashes and errors ;
• Reduces rework resulting in reduced abortive material andReduces rework resulting in reduced abortive material and time, thus reducing cost;
R d d i i i t ti d t• Reduces errors and omissions in construction documents;
• Reduces cycle time of specific workflows;Reduces cycle time of specific workflows;
Benefits of BIM• Brings forward clash detection within the design cycle,
thereby introducing cost efficiencies to the project –thereby introducing cost efficiencies to the project earlier/faster design decisions/problem resolution;
P id t t i t th t th d i i f ll di t d• Provides greater certainty that the design is fully coordinated and design documentation is consistent;
• Improved project process outcomes, such as fewer RFIs and site coordination problems;
• Better multi-party communication and understanding from 3D visualisation;3D visualisation;
• Reduced construction cost through reduced changes during t ticonstruction;
• Fewer claims/litigation/disputes/conflicts;Fewer claims/litigation/disputes/conflicts;
BIM Projectsj• Dubai Metro
G L Al Qusais 2 Station– G.L. Al Qusais 2 Station– G.L. Metro Entrance pods (27 No.)
• Mekkah Metro, KSAMekkah Metro, KSA– Arafat 1 station– Muzadlifah 1 station (WIP)
J t St ti (WIP)– Jamarat Station (WIP)– Operation and Control Centre (OCC)
• Kolkata Metro India• Kolkata Metro, India– Howrah Maidan Station UG 2 Line
• Abu Dhabi Pumping Stationp g• Lusail Metro, Qatar
Design Co-ordination and BIMg
BIM (R it) Ab d t ti D b i M tExternal Façade view
BIM (Revit) – Above ground station, Dubai Metro
Design Co-ordination and BIMg
BIM (R it) Ab d t ti D b i M tStructures and E&M Services view
BIM (Revit) – Above ground station, Dubai Metro
Design Coordination and BIMg
Metro Station Ground Floor Level 3D MEP View
Design Coordination and BIMg
Design Coordination and BIMg
Better Co-ordination of all disciplines:Dubai Metro Entrance Pods
Station Entrance Pod showing MEP Services with Architectural EnvelopeBetter Co ordination of all disciplines:
Design Coordination and BIMg
Mecca Metro – Arafat 1 Station
Design Coordination and BIMg
Mecca Metro – Arafat 1 Station
Design Coordination and BIMg
Mecca Metro –Mecca Metro
Arafat 1 Station MEP/Rail Systems Back-of-House area
M&E Combined Services DrawingBIM generated 2D Co-ordinated Layout and SectionsBIM generated 2D Co ordinated Layout and Sections
M&E Combined Services DrawingBIM generated 2D Co-ordinated Layout and SectionsBIM generated 2D Co ordinated Layout and Sections
Summaryy
Atkins BIM/Design Coordination capabilityAtkins BIM/Design Coordination capability
– 3 years experience using Revit BIM3 years experience using Revit BIM technology;
– Used on complex, fast-track rail projects;Used on complex, fast track rail projects;– Proven design coordination capability;– Delivered projects using p j g
– Revit Architecture, – Revit Structures and – Revit MEP;
– Adopted BS1192:2007 project collaboration protocol;
Recommended