22
5 TH ANNUAL GLOBAL INFRASTRUCTURE LEADERSHIP FORUM

Khalifa Port

  • Upload
    cgla

  • View
    1.055

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Khalifa Port

5TH ANNUAL GLOBAL INFRASTRUCTURE LEADERSHIP FORUM

Page 2: Khalifa Port

-­‐4   -­‐3   -­‐2   -­‐1   0   +1   +2   +3   +4  

Abu Dhabi UAE

Abu Dhabi’s Strategic Position in the World

www.ADPC.com  

Abu  Dhabi-­‐  Strategic  Loca8on  

Page 3: Khalifa Port

2030 Economic Vision Abu Dhabi

www.ADPC.com  

Page 4: Khalifa Port

Stable and Sustainable growth

2008:    $104  billion  

2030:    $416  billion  

Page 5: Khalifa Port

ADPC  Movie  

www.ADPC.com  

Page 6: Khalifa Port

Abu Dhabi Island

Kizad Area A

Kizad Area B

Khalifa Port

Dubai

E11 Sheikh Khalifa Road

6 Khalifa  Port  &  Kizad  Loca8on  

Page 7: Khalifa Port

Key Areas

7

Key Areas Off-Shore Port Area (Phase 1A) 2.7 Km2

On-Shore Port Area 3.5 Km2

Industrial Zone Area A 51 Km2

Industrial Zone Area B (Future) 366 Km2

Total 423 Km2

Singapore 693 Km2

Industrial Zone Area B Phase 2

Industrial Zone Area B Phase 1

Industrial Zone Area A

On-Shore Port Area

Off- shore Port Area

Khalifa  Port  and  Kizad    

Page 8: Khalifa Port

Project  Magnitude  

www.ADPC.com  

Abu  Dhabi  Island  

Khalifa  Port  &  Kizad  

Singapore  

Page 9: Khalifa Port

Dubai  

Abu  Dhabi  

To AlAin

Connec8vity-­‐  Access  to  global  Markets  

Sea Road Rail Air

Page 10: Khalifa Port

Khalifa Industrial Zone Abu Dhabi

Area A is 51 sq kms Divided into specific area clusters for industrial activities such as: •  Aluminium •  Steel •  Petrochemicals and Chemicals •  Paper, Print and Packaging •  Pharmaceuticals and Healthcare

Equipment •  Food •  Trade and Logistics •  Engineered Metal Products •  Mixed Use and Others

Area B is 366 sq kms

In total, 417 sq kms

Kizad  

Page 11: Khalifa Port

11

•  Dredging / Reclamation 45M m3 •  Main & EMAL Quay Walls (16m draft) 4 Km •  Revetments 18 Km •  EMAL Trestle Bridge 1.6 Km •  Utility and Causeway Bridges (each) 1.0 Km

(ea) •  Environmental & Wave Attenuation Breakwaters 8 Km

Khalifa  Port  

www.ADPC.com  

Page 12: Khalifa Port

Khalifa  Port  Layout-­‐    Dredging  and  Reclama@on  Phase  (2007-­‐2010)  

•  1 km quay- Container Terminal

•  1.2 km quay- general cargo

•  800 m quay- multipurpose berth

•  800 m dedicated berth for Emirates Aluminum (Emal)

•  Flexible Master plan

for development in stages

Page 13: Khalifa Port

Khalifa Port and Kizad Capex $7.2 Billion

13

Total: $ 4.3B

Design: Scott Wilson/URS, Moffat & Nichol, Mouchel ME, Atkins $ 64M

Construction: KPMC – Marine Structures, Dredging & Reclamation $ 1.6B

Al Jaber/Ghantoot – Earthworks $ 273M

Al Jaber/GIS – Port Special Systems $ 100M

Larsen & Toubro, Ltd. – MV Power System $ 84M

Al Habtoor Leighton Group – Onshore Civil and Buildings $ 308M – Industrial Zone Primary Infrastructure Central & South $ 327M

Ed Zublin/Al Jaber – Offshore Civil and Buildings $ 276M

Hyundai Engineering & Consortium Co. – Offshore Terminal Area $ 329M

CCC – Industrial Zone Area Infrastructure North $ 141M

Total: $ 4.3B

Khalifa  Port  and  Kizad  Major  Contracts  

www.ADPC.com  

Page 14: Khalifa Port

KPIZ Project Overview 14

Page 15: Khalifa Port

Planned Khalifa Port Capacity:

Key  Figures  

www.ADPC.com  

Traffic  Type   Stage  1A  (2012)  

Full  Development  (2030)  

Comments  

Containers   2  MT/Yr   15  M  TEU/Yr   Twenty-­‐foot  Equivalent  Units  (TEU)  

General  Cargo  (Incl.  Bulk)  

15  MT/Yr   35M  TEU/Yr   Machine  Parts,  Cable,  Drums,  Iron  Ore,  Cement  Clinker,  etc.  

Page 16: Khalifa Port

KHALIFA PORT 95% COMPLETE Overall megaproject completion: 90%

www.ADPC.com  

Page 17: Khalifa Port

Ship  to  Shore  Crane,  ZPMC/TMEIC      o   65  m  outreach,  22  wide  vessel  

o   44  m  height  under  spreader  o   110  ton  rated  load,  ready  for  2  x  40’  

o   single  hoist  twin  li]  o   38  m  back  reach  for  future  full  automa@on  

o   Max-­‐view  semi-­‐automa@on    

www.ADPC.com  

Ship  to  Shore  Cranes  

Page 18: Khalifa Port

Port Operation Q4 2012

Page 19: Khalifa Port

Coral  Reef  Protec@on  

www.ADPC.com  

Page 20: Khalifa Port

FLYOVER FILM (2.30)

www.ADPC.com  

Page 21: Khalifa Port

www.portsandtrade.com    

www.ADPC.com  

Page 22: Khalifa Port

Thank  You