36
Cost Savings for Freeway Teardowns Replace, Prevent, Remove Prepared by: Edward W. Erfurt IV Urban Designer Town Planning and Design www.ErfurtDesign.com

Erfurt C N U2009

Embed Size (px)

Citation preview

Page 1: Erfurt  C N U2009

Cost Savings for Freeway Teardowns

Replace, Prevent, Remove

Prepared by:

Edward W. Erfurt IVUrban DesignerTown Planning and Design

www.ErfurtDesign.com

June 13, 2009

Page 2: Erfurt  C N U2009
Page 3: Erfurt  C N U2009

FrameworkUnderstanding

Page 4: Erfurt  C N U2009
Page 5: Erfurt  C N U2009

…The idea of systemic, long lasting,

transformative change.

…The idea of systemic, long lasting,

transformative change.

Suburban Retrofits reintroduce the components of urbanism that were either illegal, undesired, or

missing from much of suburbia.

Suburban Retrofits reintroduce the components of urbanism that were either illegal, undesired, or

missing from much of suburbia.

Page 6: Erfurt  C N U2009

Three Types of Freeway RemovalsThree Types of Freeway Removals

2. Remove

3. Prevent

1. Replace

Page 7: Erfurt  C N U2009

ReplacementTear Down Types

Page 8: Erfurt  C N U2009

• Fundamental Change in Design

• Change in Classification

• Maintenance or Ownership

• Functional Class

• Change in Priority

• Introduction of Transit

• New Community Vision

• Catastrophic Change

• Structural Failure

•Natural Disaster

Replacement

Page 9: Erfurt  C N U2009

South Military Highway

Chesapeake, Virginia

Page 10: Erfurt  C N U2009

Grade Separation without a Grade ChangeGrade Separation without a Grade Change

Page 11: Erfurt  C N U2009
Page 12: Erfurt  C N U2009
Page 13: Erfurt  C N U2009

13

Existing Street Network

Division

Powell

I - 2

05

82nd

Ave

.

92nd

Ave

.

Station Area Planning: Division Street Station, Powell Street Station:

Portland, OR

Page 14: Erfurt  C N U2009

Division

I-205

92nd

Ave

nue

Page 15: Erfurt  C N U2009

Division

I-205

92nd

Ave

nue

Page 16: Erfurt  C N U2009

16

Division Station

Page 17: Erfurt  C N U2009

17

Division Station

Page 18: Erfurt  C N U2009

River Front Parkway

Chattanooga, Tennessee

Page 19: Erfurt  C N U2009
Page 20: Erfurt  C N U2009
Page 21: Erfurt  C N U2009
Page 22: Erfurt  C N U2009

Removal Tear Down Types

Page 23: Erfurt  C N U2009

• Completely Removing a Structure

• Evaporates the Traffic

• Removal or Consolidation of Ramps

• Abandonment of Right of Way

• Untangling a Confluence

• Increasing Access

Removal

Page 24: Erfurt  C N U2009
Page 25: Erfurt  C N U2009
Page 26: Erfurt  C N U2009
Page 27: Erfurt  C N U2009
Page 28: Erfurt  C N U2009
Page 29: Erfurt  C N U2009

Cheonggyecheon

, Seoul, South Korea

Page 30: Erfurt  C N U2009

Same corridor after CSS

Page 31: Erfurt  C N U2009

PreventionTear Down Types

Page 32: Erfurt  C N U2009

• Paper Plans

• Waiting for Funding

• Need for Immediate Change

• Current Traffic Problems

• Safety Issues

• Required Maintenance

Prevention

Page 33: Erfurt  C N U2009

Prevention

Montrose Parkway

White Flint, Maryland

Page 34: Erfurt  C N U2009
Page 35: Erfurt  C N U2009

Cost Savings for Freeway Teardowns

Replace, Prevent, Remove

Prepared by:

Edward W. Erfurt IVUrban DesignerTown Planning and Design

www.ErfurtDesign.com

June 13, 2009

Page 36: Erfurt  C N U2009