21
Ye Phone Kyaw (Tino) 3 years exp. Senior Localization Engineer at SDL PLC. Thailand.

Ye phonek resume

  • View
    453

  • Download
    1

Embed Size (px)

DESCRIPTION

Ye Phone Kyaw's Resume Year 2013 SDL PLC Senior Localization Engineer

Citation preview

Page 1: Ye phonek resume

Ye Phone Kyaw (Tino)3 years exp.Senior Localization Engineer at SDL PLC. Thailand.

Page 2: Ye phonek resume

2010 2011 2012-2013

The

Fresh GraduateThe

QA EngineerThe

Specialist

Assumption University(Computer Science)

SDL PLC. Thailand(Adobe Products)

SDL PLC. Thailand(Dassault Systèmes)

Page 3: Ye phonek resume

The Fresh Graduate(2010)

Page 4: Ye phonek resume

Along with my university education, I have had a few experiences working for teachers as their assistant.

The Fresh Graduate(2010)

Page 5: Ye phonek resume

The Fresh Graduate(2010)

I was involved in …

Process of Registration

Managing Paperworks

Organizing the Records.

Page 6: Ye phonek resume

Not only that… I developed an alumni students record management web-application for the Assumption University Alumni association. It was a simple data retrieval application using the Student IDs.

The Fresh Graduate(2010)

Page 7: Ye phonek resume

The Fresh Graduate(2010)

I have also developed a few applications for university projects.

Stock market simulator

Music storeHotel Booking services

Page 8: Ye phonek resume

The Fresh Graduate(2010)

I have achieved an overall score of 7 in IELTS and for my own sake, I can fluently speak Thai too.

Bilingual Team Player

Page 9: Ye phonek resume

The QA Engineer(2011)

Page 10: Ye phonek resume

The QA Engineer(2011)

In July 2010, I joined the SDL PLC. Thailand

I was assigned as a part of Adobe Product Localization and Quality Assurance team

This is the starting point which gave me the idea of professional Project Management Life Cycle and particular Business Requirements

Page 11: Ye phonek resume

The QA Engineer(2011)

I was responsible for managing the localization bugs… The task mainly consists of…

- Investigating issues technically and provide proper explanations / reports to related parties such as Project Management team or our Client (ADOBE).

Page 12: Ye phonek resume

I was responsible for managing the localization bugs… The task mainly consists of…

- Fix the localization bugs as reported by SDL Linguists or Other Vendors and test compile. We use both Windows and Mac Platforms and Perforce as main version control system.

The QA Engineer(2011)

Page 13: Ye phonek resume

The QA Engineer(2011)

Finally, I was given the main lead of bug-fixing / management of these products….

Page 14: Ye phonek resume

The Specialist(2012-2013)

Page 15: Ye phonek resume

The Specialist(2012-2013)

In January 2012, I moved to far more challenging part of SDL PLC. which provides localization services to Dassault Systèmes.

A world leader in the production of 3D design software, 3D digital mock-up and product lifecycle management solutions

Page 16: Ye phonek resume

The Specialist(2012-2013)

According to my communication and leadership skills, I was immediately assigned as main contact point for all projects related to Dassault Systèmes.

A world leader in the production of 3D design software, 3D digital mock-up and product lifecycle management solutions

Page 17: Ye phonek resume

The Specialist(2012-2013)

In general, SolidWorks projects are very demanding in nature as they have fixed 5 days turn-around for one project cycle.

It is very important to -define the scope of requirements for each project, -provide accurate quotation, -plan resources and -raise precise concerns

Fast-Learner Workaholic

Page 18: Ye phonek resume

The Specialist(2012-2013)

In 2013 April, according to our consistent and professional support, I was sent to Waltham, USA for Client meeting as a part of SDL PLC. Representatives, together with the Project Management Team from Leuven.

Our client was extremely satisfied with our support and we built a strong relationship between two companies.

New Ideas Foreign Exposure

Page 19: Ye phonek resume

The Specialist(2012-2013)

Currently, I am managing 3 engineers who are dedicated to all Dassault Systèmes projects together with 6 Project Managers.

Budget-wise, I am taking care of engineering hours which totals approximately from 300 – 600 hours monthly.

Resource Planning

Budget Management

Page 20: Ye phonek resume

Lets [email protected]

+660803026226

Page 21: Ye phonek resume

Slide Ideas Inspired by EmilandDCemiland.mehttp://www.slideshare.net/EmilandDC