When Waterfall and Agile Collide- Managing the Balance

Embed Size (px)

DESCRIPTION

Presentation to IIBA South Florida Chapter Members, Courtesy of Borland's Mark Kulak and Bryan Fangman.

Citation preview

Page 1: When Waterfall and Agile Collide- Managing the Balance

When Agile & Waterfall Collide – Managing the Balance!

Mark Kulak

Bryan Fangman

Page 2: When Waterfall and Agile Collide- Managing the Balance

MARK KULAK

Borland Caliber – Requirements Definition & Management

Director of Product Development

Page 3: When Waterfall and Agile Collide- Managing the Balance

• The current state of software project success and industry trends

• What’s wrong with traditional requirements management methods

• Latest innovation and concepts in Requirements Definition & Management with Agile delivery

3

Overview

© 2013 Borland

Page 4: When Waterfall and Agile Collide- Managing the Balance

The Standish Group International, Inc. CHAOS Manifesto

4

Trends - Software project success

© 2013 Borland

Page 5: When Waterfall and Agile Collide- Managing the Balance

5 © 2013 Borland

Page 6: When Waterfall and Agile Collide- Managing the Balance

6

What does Agile really mean for requirements?

© 2013 Borland

Page 7: When Waterfall and Agile Collide- Managing the Balance

7

Waterfall lifecycle

7

Requirements Definition & Management

© 2013 Borland

Page 8: When Waterfall and Agile Collide- Managing the Balance

8

Requirements Definition & Management

Definition Elicitation Management Approval

Requirements

Requirements

© 2013 Borland

Page 9: When Waterfall and Agile Collide- Managing the Balance

Waterfall Project Management

Strengths 1. Clear understanding of expected scope

2. Produces complete design and

documentation

3. Clearly visible project history and evolution

4. Progress through stages is clearly visible

5. Definition up front allows understanding of what is fully expected

6. Enforces discipline by requiring completion of one stage before moving to the next

7. Staged approach is relatively easy to implement and understand

Weaknesses 1. Mistakes in requirements lead to

significant wasted effort

2. Business needs change as defined requirements wait for implementation

3. Great difficulty in adapting to change across phases

4. Defining full features up front is difficult

5. Estimating up front is often inaccurate

6. Visibility of detail across stages is limited (isolated by project roles)

7. Work occurs in cycles creating peaks and valleys of activity

8. Monumental review process

9 © 2013 Borland

Page 10: When Waterfall and Agile Collide- Managing the Balance

10

Agile Software Development

© 2013 Borland

Page 11: When Waterfall and Agile Collide- Managing the Balance

Our highest priority is to satisfy the customer through early and continuous delivery of valuable software. Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale. Business people and developers must work together daily throughout the project. Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.

Working software is the primary measure of progress.

Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.

Continuous attention to technical excellence and good design enhances agility.

Simplicity--the art of maximizing the amount of work not done--is essential.

The best architectures, requirements, and designs emerge from self-organizing teams.

At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly.

Agile Manifesto

• Individuals and interactions… over process and tools

• Working software… over comprehensive documentation

• Customer collaboration… over contract negotiation

• Respond to change… over following a plan

11 © 2013 Borland

Page 12: When Waterfall and Agile Collide- Managing the Balance

12

Agile / Iterative / Scrum…

© 2013 Borland

Developed Tested

Documented

Page 13: When Waterfall and Agile Collide- Managing the Balance

Weaknesses 1. "Agile" often implemented as un-

governed methodology

2. Limited requirements change management / visibility

3. Non-functional requirements are difficult to capture as user stories

4. Project scope not clearly understood

5. "Fail fast" approach knowingly introduces regular rework

6. Lack of structure and necessary documentation

7. Delivery focused

Agile Project Management – Requirements

Strengths 1. Adapts to changing business needs

in short cycles

2. Allows progress with limited information

3. Mistakes in requirements lead to limited wasted effort

4. Inclusive of all stakeholders across project

5. Provides clear status in the form of working software

6. Work occurs in a sustainable manner

13 © 2013 Borland

Page 14: When Waterfall and Agile Collide- Managing the Balance

• Agile was a pullback from very tightly managed and highly governed waterfall lifecycle

• Manifesto was required

– A radical change required a radical action

– Agilista

• Agile needs to fit for the enterprise…

– Visibility

– History

– Traceability

– Governance

• Time to adapt… “be agile”, don’t “do agile”

14

Agile is now widely recognized as a software lifecycle

© 2013 Borland

Page 15: When Waterfall and Agile Collide- Managing the Balance

Agile / Iterative / Scrum…

Requirements Definition

Requirements…

Elicitation? Definition? Collaboration? Review? Versioning? Change Management?

15 © 2013 Borland

Page 16: When Waterfall and Agile Collide- Managing the Balance

Requirements Definition & Management

Elicitation Management Approval

Requirements

Requirements

Definition

16 © 2013 Borland

Page 17: When Waterfall and Agile Collide- Managing the Balance

Iterative Development

Two Life Cycles… Working as One

Iterative Definition

Add structure and management to the backlog

User Feedback

17 © 2013 Borland

Page 18: When Waterfall and Agile Collide- Managing the Balance

• Requirements backlog – Managed / groomed to enable consensus, visibility and

governance

• Incremental definition – Detail defined according to relative priority

– Definition work spent on low priority requirements is waste

– Definition work beyond that required for communication is waste

• Iteratively turn over "well formed" requirements / user stories – Defined, reviewed and approved… Manage the backlog

• Success measured against “business need” not against “development unit” – When is a product releasable?... Minimally marketable features

18

Agile requirements definition

© 2013 Borland

Page 19: When Waterfall and Agile Collide- Managing the Balance

19

Aren’t requirements and user stories the same thing?

© 2013 Borland

Page 20: When Waterfall and Agile Collide- Managing the Balance

20

Defining Business Need - Requirement

Idea

Increasing Detail

Fully formed Requirement

High level goals

Basic visualization

Use cases

Functional requirements

Non-functional requirements

Business Need Driven

© 2013 Borland

Page 21: When Waterfall and Agile Collide- Managing the Balance

21

Defining Development Unit – User story

Task

User story

Feature

Breakdown for work

User story

Development Need Driven

© 2013 Borland

Page 22: When Waterfall and Agile Collide- Managing the Balance

22

Agile Requirements Bell Curve

Defining Development Detail

Defining . Business Features

What is the status of what was asked for?

Idea Task

Does what was created, satisfy what was asked for?

Page 23: When Waterfall and Agile Collide- Managing the Balance

23

Do I still need to define it all up front?

© 2013 Borland

Page 24: When Waterfall and Agile Collide- Managing the Balance

Practical Fidelity (Incremental Definition)

Definition beyond what is required for communication is waste

24 © 2013 Borland

Page 25: When Waterfall and Agile Collide- Managing the Balance

25

Pragmatic definition

Defining Development Detail

Detail required for business clarity

WASTE

© 2013 Borland

Defining . Business Features

Page 26: When Waterfall and Agile Collide- Managing the Balance

26

Different for every organization, project, requirement

Light weight requirements Detailed requirements

Regardless of level of rigor in the organizational process, requirements must be managed

© 2013 Borland

Page 27: When Waterfall and Agile Collide- Managing the Balance

Upfront Requirements Definition… a Contrast

Traditional Requirements Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Agile Requirements Requirement 1

Feature 1.3

Requirement 3

• Full upfront definition including low priority features

• Rigid expectations • Commitment to detailed

scope

• “Must Have” payload and critical features defined upfront

• High level definition only, detailed where details are needed

• Incremental detail added JIT to match delivery team need (iterations)

• Commitment to high level scope

© 2013 Borland

Page 28: When Waterfall and Agile Collide- Managing the Balance

© 2013 Borland

Approved

Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Delivery Using Traditional Requirements

Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Delivered

• What is delivered seldom matches what is initially requested

• Implementation uncovers limitations and opportunities

• Usage and market needs shift over time

Approved

Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Approved

Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Overly managed change control process impedes responsiveness

Feature 3.3

Page 29: When Waterfall and Agile Collide- Managing the Balance

Requirement 1

Feature 1.1

Requirement 3

Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Delivery Using Agile Requirements

Initial Approval Delivered

Requirement 1

Feature 1.1

Requirement 3 Feature 3.1

Requirement 1

Feature 1.1

Requirement 3 Feature 3.1

Requirement 2

Feature 2.1

Feature 2.2

Feature 1.2

Iteration 2 Iteration 4

Requirement 1

Feature 1.1

Requirement 3 Feature 3.1

Feature 1.2

Iteration 6

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Feature 2.4

Feature 2.5

• Usage and market needs shift over time • Flexible requirements definition process encourages

responsiveness

• Priority requirements are delivered early, removing risk • Implementation / demos uncover

limitations and opportunities

Requirement 1

Feature 1.1

Requirement 3

Iterative delivery… what about the iterative REQUIREMENTS delivery?

© 2013 Borland

Page 30: When Waterfall and Agile Collide- Managing the Balance

Deliv

ery

Require

ments

Requirement 1

Feature 1.1

Requirement 3

Requirement 1

Feature 1.1

Feature 1.2

Feature 1.3

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Requirement 3

Feature 3.1

Feature 3.2

Feature 2.4

Feature 2.5

Iterative Requirements Definition Iteration 8

Requirement 1

Feature 1.1

Requirement 3 Feature 3.1

Requirement 1

Feature 1.1

Requirement 3 Feature 3.1

Requirement 2

Feature 2.1

Feature 2.2

Feature 1.2

Requirement 1

Feature 1.1

Requirement 3 Feature 3.1

Feature 1.2

Requirement 2

Feature 2.1

Feature 2.2

Feature 2.3

Feature 2.4

Feature 2.5

Requirement 1 Feature 1.1 Requirement 3 Feature 3.1 Requirement 2

Feature 1.2 Feature 2.1 Feature 2.2 Feature 2.3

Feature 2.4 Feature 2.5 Feature 1.3

Feature 3.2 Feature #.#

© 2013 Borland

Iteration 0&1 Iteration 2 Iteration 4 Iteration 6

• Incremental requirements detail and adjustment

• Focus on defining & approving the next most important / risky features

• Incorporates changes driven by demo feedback and implementation

Page 31: When Waterfall and Agile Collide- Managing the Balance

31

Agile Requirements Definition and Delivery

© 2013 Borland

Make agile two lifecycles working as one Iterative requirements definition Iterative requirements delivery

Less waste by assuring business and delivery are in alignment. Fail fast… and less frequently

Pragmatic definition - only define enough detail to satisfy organizational needs and

delivery clarity… Anything beyond is waste

Page 32: When Waterfall and Agile Collide- Managing the Balance

BRYAN FANGMAN

Borland Caliber – Requirements Definition & Management

Senior Product Manager

Page 33: When Waterfall and Agile Collide- Managing the Balance

• Testing will cover requirements at the time of definition as well as the incremental deliverables in each supporting story

• As Agile practices become more managed, Agile requirements/stories will trace to an increasing number of related elements

• More stakeholders will become actively involved in the elicitation and approval process as tools improve efficiency

• Visualizations will become increasingly important for requirements elicitation and validation

• The majority of individuals participating in the requirements management process will use web-based and mobile solutions

• Organizations will become more efficient in centralizing, standardizing and reusing requirements

• The accuracy of the initial and ongoing time/cost estimations will improve and occur earlier in the lifecycle

33

The Future of RDM and Agile Tools

© 2013 Borland

Page 34: When Waterfall and Agile Collide- Managing the Balance

• Testing occurs at multiple levels

– Requirements – validates the business capability is delivered

– User stories – validates the completeness of the individual incremental capabilities

• User stories should be tested every sprint

• Requirements are tested after a appreciable amount of business capability has been delivered

• Visual scenarios become the foundation for test cases

34

Testing

© 2013 Borland

Page 35: When Waterfall and Agile Collide- Managing the Balance

• Requirements must be linked to user stories to provide visibility into what has been delivered against the business needs

• By understanding how much activity has transpired in delivering the requirement, impact analysis is more complete

• Better decisions can be made in real-time to avoid costly rework

• Decisions can be made to postpone changes to allow critical functionality to be delivered sooner

35

Impact Analysis with Agile Stories

© 2013 Borland

Page 36: When Waterfall and Agile Collide- Managing the Balance

36

Impact Analysis with Traceability

© 2013 Borland

- Trace to Visualizations - Scenarios

- Simulations

- Trace design elements

- Trace regulatory requirements

- Trace dependencies

Page 37: When Waterfall and Agile Collide- Managing the Balance

• Tradition non-Agile roles will become more involved

• Increased visibility allows for real-time feedback

• Reaching greater number of stakeholders ensures the right functionality is delivered the first time

• Tools and technology advancements such as web-based and mobile technologies promote real-time participation

37

Increased Stakeholder Participation

© 2013 Borland

Page 38: When Waterfall and Agile Collide- Managing the Balance

38

Increased Stakeholder Participation

© 2013 Borland

- Web and mobile access

- View related artifacts and attributes

- Centralized feedback

- Approvals

Page 39: When Waterfall and Agile Collide- Managing the Balance

Scenarios

Validate the process flow and identify requirements/business rules:

– What is the sequence?

– Who is involved at each step?

– What are the alternate paths and decisions being made?

Simulations

Validate the flow, behavior and usability of the user interface by role:

– Wireframes and layout

– Interactive demonstration of key capabilities

– Ensure agreement on UI before development starts

39

Visualizations Promote Agile

© 2013 Borland

Page 40: When Waterfall and Agile Collide- Managing the Balance

40

Visualizations: Storyboards (Scenarios)

© 2013 Borland

Validate the process flow and identify requirements /business rules:

• What is the sequence?

• Who is involved at each step?

• What are the alternate paths and decisions being made?

Page 41: When Waterfall and Agile Collide- Managing the Balance

41

Requirements Validation

© 2013 Borland

- Scenarios can be validated and are foundation for UAT

- Requirements acceptance criteria defined up front

Page 42: When Waterfall and Agile Collide- Managing the Balance

42

Visualizations: Simulations

© 2013 Borland

Validate the flow, behavior and usability of the user interface by role: • Wireframes and layout

• Interactive demonstration of

key capabilities

• Ensure agreement on UI before development starts

Page 43: When Waterfall and Agile Collide- Managing the Balance

• Reusable repository of key requirements

– Non functional requirements

• Security requirements

• Performance requirements

• Usability requirements

• Requirements are aligned with supporting user stories

• Requirements are traced to shared compliance requirements (dependency)

• Updates to compliance requirements triggers suspect trace with requirements and subsequent user stories

43

Regulatory Compliance

© 2013 Borland

Page 44: When Waterfall and Agile Collide- Managing the Balance

• Requirements define the business capability

• User stories in aggregate should satisfy the business need

• Real-time integration of requirements with user stories is critical for sufficient impact analysis

• Integration ensures that what gets delivered aligns with the business needs

• Can be done whether moving from structured to Agile or vice-versa

44

Aligning Business Needs and Delivery

© 2013 Borland

Page 45: When Waterfall and Agile Collide- Managing the Balance

45

Requirements and Agile Stories

© 2013 Borland

Create a new story or trace to existing

stories

Page 46: When Waterfall and Agile Collide- Managing the Balance

46

Creating a New Story

© 2013 Borland

Create a new story

Page 47: When Waterfall and Agile Collide- Managing the Balance

47

Alignment of Stories with Business Needs

© 2013 Borland

Visibility of delivery status

Page 48: When Waterfall and Agile Collide- Managing the Balance

• Adopt a process that conforms to your preferred methodology – Ensure the framework does not constrict productivity – Respect roles that are not traditionally Agile

• Find a tool that fits within your methodology – Allow each role to work with the tools they want – Avoid restrictive workflows and rules

• Centralize best practices from successful projects • Expand visibility between Agile assets and related artifacts for

real-time impact analysis

• Start with Agile delivery; the rest will follow an Agile tempo in time

• Ensure what is delivered aligns to business needs 48

Enabling a Managed Approach to Agile

© 2013 Borland

Page 49: When Waterfall and Agile Collide- Managing the Balance

QUESTIONS?

49 © 2013 Borland

Page 50: When Waterfall and Agile Collide- Managing the Balance

For additional information regarding:

• Presentation content

• Scheduling a demonstration

• Integrating requirements and agile delivery

• Products and services

• Speaking engagements

Please contact:

50

Contact Information

© 2013 Borland

http://www.borland.com

Bryan Fangman Senior Product Manager [email protected] (301) 838-5170

Mark Kulak Director of Development [email protected] (248) 824-1743

Page 51: When Waterfall and Agile Collide- Managing the Balance

BORLAND SOLUTIONS

Waterfall, Agile, others… we can help!

Page 52: When Waterfall and Agile Collide- Managing the Balance

Borland’s Approach

We are Open... to the way you want to work and to the investments you have already made in your ALM tooling

We are Agile... in how we work with you, responding quickly to your changing requirements, bringing the benefits of Agile to existing processes

We are Enterprise... in our scale and understanding, satisfying even the largest of organizations

52

Page 53: When Waterfall and Agile Collide- Managing the Balance

The award recognizes Borland’s Agile Transformation as an IT project that exemplifies intelligent, creative use of technology to meet business and technical objectives. Like most organizations considering a large-scale Agile shift, Borland faced a major process renovation while still needing to execute on an aggressive product roadmap. As Borland began to scale its Agile efforts across an organization with more than 350 developers in five geographic locations, teams needed a better way to collaborate, share information and manage their work. At the same time, management needed visibility in order to establish a baseline for performance and be able to measure the progress and benefits of the transition to Agile.

Our Own Award-winning Agile Transformation Borland received an Info World Top 100 Innovation Award for transitioning its own development organization to agile

53

Page 55: When Waterfall and Agile Collide- Managing the Balance

Caliber

Requirements Elicitation

Storyboards

Prototyping

Performance Metrics

Automated Functional Testing

Regression Testing

StarTeam

SilkCentral

Test Management

Test Execution

Defect Tracking

Test Reporting

Borland Solutions

Execute Tests and Collect Results

Create Test Case Scenarios

Synchronize Requirements

and Create Test Cases

Synchronize and Trace

Requirements

Synchronize Issues

Continuous Build and Test

Development Metrics

Source Control

Issue and Task Management

Agile Project Management

Glossaries

Baselines

Approvals

Traceability

Test Case Generation

Automated Load Testing

SilkPerformer

SilkTest

SilkMobile

On Device test automation

iOS, Android, BlackBerry

Cloud Execution

55 © 2013 Borland

Page 56: When Waterfall and Agile Collide- Managing the Balance

56

Requirements Management and Traceability Caliber Author

• Reuse requirements across projects

• Integrate with code development and testing tools for verification and validation

• Understand the impacts of change and alignment to business objectives through traced relationships

© 2013 Borland

Page 57: When Waterfall and Agile Collide- Managing the Balance

• Visual clarity reduces process ambiguity

• Identifies missing or wrong underlying assumptions

• Stakeholder feedback improves quality of requirements

• Establishes a common vision and shared responsibility

Scenarios and Simulations Caliber Visualize

Visualization brings activities, actors and requirements together within their context

57 © 2013 Borland

Page 58: When Waterfall and Agile Collide- Managing the Balance

• License free model assures maximum participation of stakeholders

- Online discussions tied to requirements

- Same discussions available from Author, Visualize and Review

58

Collaborate, Review and Discuss Caliber Review

© 2013 Borland

• Additional functionality - Baselines - Filters - Search

• View requirements, attributes, traces via web

Page 59: When Waterfall and Agile Collide- Managing the Balance

• Silk Central provides a unified framework for the integration of requirements, test automation tools – Unit – Functional – Performance

59

Test Integration and Management Silk Central Test Management

• Dashboard Reporting

• Manual execution planning

• Highlight risk mitigation and quality goals

• Configuration testing

• Video and image capture

• SAP Testing

© 2013 Borland

Page 60: When Waterfall and Agile Collide- Managing the Balance

Powerful, easy, cost-effective

• Open - offering leading Web 2.0 and broad enterprise application support

• Agile - easiest to use load testing solution with a short learning curve for rapid releases

• Enterprise - gain confidence in the performance and stability of your mission-critical applications

60

Application Performance Testing Silk Performer

• Leading Web 2.0 support

• Mobile testing

• Cloud integration

• Rich reporting and analysis

• Server monitoring

• Enterprise application support

• Workflows & wizards

• Accurate real-life user simulations

© 2013 Borland

Page 61: When Waterfall and Agile Collide- Managing the Balance

Mobile app testing – simple, visual, powerful

• Easiest mobile testing tool ensures your mobile apps get to market in half the time

• Robust combination of native, image and text based recognition technology increases the usability of your apps

• Complete solution handling functional and performance testing makes your mobile apps perform better

61

Mobile Application Testing Silk Mobile

© 2013 Borland

• The way your users use it – gestures support

• Broad mobile OS platform support • No hacking required

• Native object recognition

• Optical character recognition

• Easy to use because it’s visual

• Easy to read execution reports