Utility Case Studies
Florian Brandi-Dohrn, AED-SICAD
EUC 2011: Oct. 26 – 28, 2011
Util
ity C
ase
Stu
dies
AED-SICAD: Who Are We?
� One of the biggest GIS-Software Application Companies in Europe
� German Company
� > 200 employees / 330 in the group
� Employees with > 20 years of experience
� Applications
Util
ity C
ase
Stu
dies
� Utilities: ArcFM UT
� Land Management: LM on ArcGIS
� ArcGIS Server Applications
� ESRI Platinum Partner
� Only Platinum Partner outsideof North America
Util
ity C
ase
Stu
dies
Web
CODIWMPS
URM
Process
Templates
UT Web
Silverlight/
JavaScript
Light Clients
ArcFM UT Product Suite
Full Desktop
ArcFM UT
View
ArcFM UT
Editor
ArcEditor ArcView
DesktopClients
Smart Desktop
ArcGIS Engine
ArcFM UT Asset Manager
MobilePlanner
Mobile Clients
Util
ity C
ase
Stu
dies
UT Server
AGS Extensions
Ser
ver
Ser
ver
Enterprise GDB
Local GDB
FileGDB
ArcGIS
Server
Integration
SOAP
ArcFM UT
Integrator NCS
ArcFM UT
Integrator EAI
SAP
SCADA
SOAP
Integration ERP, SAP (SOAP)
Util
ity C
ase
Stu
dies
Successes 2008 / 2011: Overview ArcFM UT Customers
� Approx. 130 small,
medium and large
international utilities
have decided for
ArcFM UT since first
release
Case Studies:
• Brabant Water, Netherlands
• VSE, Slovak Republic (Electricity)
Util
ity C
ase
Stu
dies
� From the top 5
German Utilities, 3
are using ArcFM UT
� Most customers full
Enterprise
Implementations
Util
ity C
ase
Stu
dies
Brabant Water, Netherlands
� Main pipeline system 17.000 km
� House connections 1.100.000
� Inhabitants 2.4 million
� GIS ArcFM UT users
� 20 data editors
� 115 field employees: mobile users
Util
ity C
ase
Stu
dies
� 115 field employees: mobile users
� 175 geo data viewers in office
� 10 spatial analysts
� IT Staff
� 5 application developers
� 6 application operational management & service
Util
ity C
ase
Stu
dies
Brabant Water: Software Architecture
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
Brabant Water: Screenshot
Brabant Water: Editing
• Data conversion done by
ATOS Origin
Util
ity C
ase
Stu
dies
ATOS Origin
• Customizable data model /
alpha masks
Util
ity C
ase
Stu
dies
Brabant Water: Tracing
Brabant Water: Tracing
• Isolate network
• Find affected customers
Util
ity C
ase
Stu
dies
• Find affected customers
Util
ity C
ase
Stu
dies
Brabant Water: Tracing
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
Brabant Water: Tracing
Brabant Water: Tracing
• Customer addresses:
Integrated with ArcFM UT
Util
ity C
ase
Stu
dies
Integrated with ArcFM UT
Integrator EAI with the
CRM
Util
ity C
ase
Stu
dies
Brabant Water: Importing DXF
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
Brabant Water: Importing DXF
Brabant Water: DXF
• Cut & paste
• Adapt alpha-numerical
Util
ity C
ase
Stu
dies
• Adapt alpha-numerical
data
Util
ity C
ase
Stu
dies
Brabant Water: ArcFM UT Web
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
� Objectives
� Migration : All data migrated
� System open and adaptable
� IT integration (CRM) big success
� Standard COTS application software
(ArcFM UT – no specific developments):
First System update cycle without problems passed
Conclusions
Util
ity C
ase
Stu
dies First System update cycle without problems passed
� Experiences
� Extensive user training reflects in excellent data quality
� Inclusion of users in design decisions
� Keep „time boxes“ for unforseen tasks
� Involve and benefit from AED-SICAD and ESRI experts
Util
ity C
ase
Stu
dies
Východoslovenská Energetika a.s. (VSE)
Company Profile
� Energy utility company
� Member of the RWE Group since 2003
� More than 605.000 points of delivery
� Mission = provide reliable and complex services which correspond to the needs of customers
Util
ity C
ase
Stu
dies services which correspond to the needs
of customers
� Sold more than 3,2 TWh in 2010
� Average number of employees = 1.575
Shareholders
National Property Fund: 51 %
RWE: 49 %
� Distribution area16 221 km2
� HV Lines: 1 274 km� MV Lines: 8 276 km� LV Lines:11 160 km� MV / LV Distribution
stations: 5 108
Util
ity C
ase
Stu
dies
1. Technical architecture (HW,SW)
2. Data Model (ArcFM UT+VSE) configuration
3. Migration tools MV, HV = ArcGEO
� Specific tool for each data source
� DGN+DB � UT MDB � UT SDE
4. Data migration = VSE
� Preparing data
Project Phase I: GIS and Data
Util
ity C
ase
Stu
dies
� Preparing data
� Using / extending migration tools
� Correcting / post-processing data
MV migration = 04/2009 – 09/2009
HV migration = 02/2010 – 05/2010
Util
ity C
ase
Stu
dies
Data Migration – Example MV
SAP ESM
web application
El.vedenia (EV)
Automatic
SAP-EV
data merging
SAP+EV+list of SAPIDs
+Substation info
Data sources
Link with SAP
DGN -> ESRI
conversion
conversion from DGN,
attribute linking (MDB,tag),
transformations,
data checks
object text ID formating,
appending attributes from
specific tool for each
data source
External MV
overhead lines
External MV
cables
Internal MV
overhead lines
External MV
cables (pilot)
Internal MV
cables (new)
SAP: Source of organizational
data
Source of technical data
9 sources of geographic data
Util
ity C
ase
Stu
dies
Automatic
generation of
Substation ISP
Substation
Inside Plant
Link with SAP
Object
transformation
restructuring, mapping to
station models,
attribute linking,
assignment creation,
offsets, data checks, etc.
ESRI Personal GDB(VSE schema)
appending attributes from
SAP+EV (by text ID)
Merging,
data cleaning
data checks
Substation ISP
linking
ArcFM UT GDB(check out)
Migration to
ArcFM UT
OCL mapping
FCL mapping
(bulk)
Based on SAP object
relations, incl. the
assignment of SAP+EV
attributes
rotation and snapping
ArcFM UT GDB (SDE)
SDE migration
MV construction
plans
MV aerial
imaging
Internal MV
cables (old)
station
ground plans
Automated tool for Generating Station ISP (using tabular data only)
Util
ity C
ase
Stu
dies
Data Migration – Result - MV
Util
ity C
ase
Stu
dies
MV + elevation MV + aerial imaging basemap
MV + 1:10 000
basemap
Util
ity C
ase
Stu
dies
Low Voltage (0.4 kV): Digitalization / Data Collection
� Overview:
� Start = 07/2009
� Duration = 5 years
� Accuracy = submetric 3rd class
� Internal and external sources
� First results:
Util
ity C
ase
Stu
dies
Estimation:
� 3 500 km cables
� 10 500 km overhead lines
� First results:
Util
ity C
ase
Stu
dies
Project Phase II: GIS Integration
Util
ity C
ase
Stu
dies
GIS became a master source of the distribution network of VSE:
� Geographic data
� Detailed technical records of electricity distribution devices (HV, MV, LV)
� Data update process (distribution network) = managed by the GIS
department
Util
ity C
ase
Stu
dies
GIS – SCADA (offline export)
> Initial & Incremental scheduled export
> Input = MV data (divided into tiles)
> Output = DXF+CSV files (SCADA FTP upload)
Util
ity C
ase
Stu
dies
> In operation since 9/2008
Util
ity C
ase
Stu
dies
GIS – SAP PM, ETRA, Maximo (online integration)
> All HV and MV objects
> Data handling in GIS („image“ to SAP PM)
> SAP ID back to GIS
> In operation since 3/2010
Util
ity C
ase
Stu
dies
> TR (Transformer) – MV/LV
> Create TR in GIS
> Update TR in ETRA
> In operation since 3/2010
> In operation since 3/2010
> All HV and MV objects
> Data handling in GIS („image“ to Maximo)
> State of equipment back to GIS
> 6/2010 (pilot), since 6/2011 (sequential roll-out)
Util
ity C
ase
Stu
dies
GIS – SAP IS-U (Online Integration + Scheduled „Pull“ Export)
� Customer data(source SAP IS-U)
� Service point (based on the current grid configuration) + coordinates of customer (source GIS)
Util
ity C
ase
Stu
dies
� Consumption data mirrored to the GIS
� In operation since 9/2009
Util
ity C
ase
Stu
dies
� Ownership information of equipment (source SAP FI-AA)
� Asset accounting number mirrored to GIS
� All MV objects
GIS – SAP FI-AA (Online Integration)
Util
ity C
ase
Stu
dies
� All MV objects
� Much faster report generation for Regulatory Authority
� In operation since 3/2010
Util
ity C
ase
Stu
dies
GIS – SAP Integration: Project Benefits
� Storing data in a single „primary“ system (GIS)
� Reducing data management workload
� Removing old isolated legacy applications for technical data
management
� Reducing number of SAP clients in VSE
Util
ity C
ase
Stu
dies
Prepared environment for implementation of a very important project = HIFFI (MAXIMO - grid maintenance management)
� Solving online communication of SAP IS-U with GIS
� Much faster reports for regulatory authority
Util
ity C
ase
Stu
dies
GIS – Network Calculation System (Offline Export)
Util
ity C
ase
Stu
dies
� All HV, MV, LV objects
� Off-line export directly from GIS
� In progress, go operation in 11/2011 (plan)
Util
ity C
ase
Stu
dies
GIS Integration at VSE - Evolution
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
GIS / IT Landscape
Util
ity C
ase
Stu
dies
Util
ity C
ase
Stu
dies
� External systems require new attributes / objects / relations
� VSE DM changes drive the process – make projects sequential
� VSE data model: DM v1 � v22d
� Large coordination effort
� Stringent deployment plan & coordination of projects is essential
Project Aspects
Util
ity C
ase
Stu
dies
� Up to six projects running simultaneously at VSE
� Dev AG � Dev VSE � Test � Prod � Bugfix (Test)
� Align activities with 3rd parties – impl., testing, deployment
Util
ity C
ase
Stu
dies
� Enhance monitoring capabilities of APIs
� Extended GUI for integration
� Extended logging, error handling & mail notifications
� Optimize performance and robustness
� Include high-availability (on DB and integration server level)
VSE – Future Plans
Util
ity C
ase
Stu
dies
� Include high-availability (on DB and integration server level)
� Optimize integration processes
� Upgrade to ArcFM UT V10
� Extend current integrations
� New objects/voltage levels, functions & processes
Util
ity C
ase
Stu
dies
Thank you for your attention
Util
ity C
ase
Stu
dies
Florian Brandi-Dohrn
AED-SICAD AG
Lilienthalstraße 7
D - 85579 Neubiberg / Germany
Tel.: +49-89-45 026 - 217