User Centered Agile Dev at NASA - One Groups Path to Better Software

Jay Trimble NASA Ames Research Center

!For Balanced Team

11-3-13

Page 2: User centered agile dev balanced team 2013
Page 3: User centered agile dev balanced team 2013

My Background• Missions

• NASA Johnson Space Center, Houston

• Shuttle Mission Control, Payloads

• Jet Propulsion Lab

• Robotic - Voyager Neptune

• Shuttle - Space Radar Lab, Lead Ops Director

• Current

• Mission Operations & Ground Data System Manager, Resource Prospector Lunar Rover

Space Radar Lab-1 Ops Director

Internship in Mission Control (A long time ago)

Page 4: User centered agile dev balanced team 2013

My Background

• Software Technology

• Human Centered Computing for Mars Rovers

• Founded User Centered Technology Group

• User centered technologies for mission control

Page 5: User centered agile dev balanced team 2013

One Story of Agile at NASA

• This is a bottom up story of how a group at NASA applied agile methods to software development for mission control

• This was approved, but not initiated by, management

Page 6: User centered agile dev balanced team 2013

The Project

• Our task was to build an architecture for mission control user applications, the primary focus being on developing interaction paradigms and technology for user-composable software

!

• See the results at https://github.com/nasa/mct

Page 7: User centered agile dev balanced team 2013

The Collaboration

• Design and Development Team at NASA Ames

• The Customer

• Mission Control Users at NASA

• Using Participatory Design, we created an integrated team that included customer representation

Page 8: User centered agile dev balanced team 2013

Issues and Mandates

• Some customers want a new product, others do not

• The product must have new capability, but must also not be disruptive within the organization

• Functional and visual connection to legacy product

Page 9: User centered agile dev balanced team 2013

The Journey

• We began with a six month software delivery cycle

• By iteratively fixing issues, we got the delivery cycle down to three weeks

• It took close to two years to complete the transition

Page 10: User centered agile dev balanced team 2013

Where we started

• Four six-month deliverables

• One User Experience Spec

Subsystem1 Subsystem2 Subsystem3 Subsystem

6 Months 6 Months 6 Months 6 Months

Module 1

Page 11: User centered agile dev balanced team 2013

Issues we faced• Long delivery cycle

• Difficult to manage feature prioritization and development, integration and testing

• Progress invisible to customer, lack of meaningful ongoing customer interaction to drive design

• Mismatch in expectations between design/dev team and customer

• Difficult for the development team to know state of progress relative to goals

• Deliveries focus on subsystems rather than meaningful end user functionality

• Two-year final deliverable created a tendency to defer key issues

Page 12: User centered agile dev balanced team 2013

[email protected]

Initiating Internal Change

• Fix the problems iteratively, without a broad proclamation of methodology, i.e. “we are going to be agile” or “we are going to be “lean”

• Just fix the problems

Page 13: User centered agile dev balanced team 2013

First Step - Six Week Cycle

• We took the six month cycle and divided it into smaller pieces

• This was a start, but still left many issues

It 1 It 2 It 3 It 4 It x6

Weeks6

Weeks6

Weeks6

Weeks

Page 14: User centered agile dev balanced team 2013

[email protected]

Incremental Improvements• Six week delivery cycle

• Prioritization of work at the start of each six-week iteration

• User Experience spec for every iteration due one week before iteration start

• UE testing and design session during coding period of each iteration

Page 15: User centered agile dev balanced team 2013

Six Week Cycle

Code (3.5 weeks)

UE Specification

UE Spec

Stack Rank

Pre-Stack

Rank 1

Pre-Stack

Rank 2

JIRA Updates/Priorities

Iteration n-1 Iteration n

Kickoff

Eng design & spec (3 days)

Coding/UE Spec Revisions/Daily Acceptance Test

UE Testing Iteration n-1 (delivered s/w)

UE Design/Testing Iteration n+1 (paper)

Develop Test Plan

RlsDocs

Demo

Demo new featuresfor QA

Test (2 weeks) PS Review

Pre-Ship Review, exit critera, customer demo

Deliver De-Brief

Iteration n+1

Page 16: User centered agile dev balanced team 2013

[email protected]

Almost There

• Better, but still not where we need to be

• Six week iterations are focused on subsystem capabilities, they lack user-focus

• Customers see progress every six-weeks, this is not often enough

Page 17: User centered agile dev balanced team 2013

Next Steps• Identify the issues

• After each iteration we had a team de-brief where we identified issues and discussed fixes

• Fixing the issues, one step at a time

• Some issues we fixed with policy changes based on team de-briefs

• Many of the changes were bottom up within the team, such as

• Daily communication between user experience designers and the customer as new features rolled out and QA testing of features on rollout,

• Some changes were top down, such as the length of an iteration (or sprint) and the release cycle

Page 18: User centered agile dev balanced team 2013

Agile

• We shortened the cycle to three weeks

• Replaced discrete events, with integrated interactions

• Integrated strategic and tactical into our ranking process

• Each iteration had clear purpose, goals, ranked priorities

• Daily Build, Iterations, Release

• Strategic road map

Page 19: User centered agile dev balanced team 2013

Designing with the Users• Participatory Design &

Analysis

• Customers are part of the design team

• Designers facilitate, customers are the domain experts

• Shared ownership

Page 20: User centered agile dev balanced team 2013

Design Artifacts• Triggers/Results

• Really big picture

• Big Picture

• Task Flows

• Blue sky

• Real world

Page 21: User centered agile dev balanced team 2013

Design Artifacts

• Task Objects

• User Objects

• Windows

Page 22: User centered agile dev balanced team 2013

[email protected]

Agile Cycle• Nightly Build

• Iteration delivered every 3 weeks

• Release every 3 months

Release n

Iteration 1 Iteration 2 Iteration 3 Iteration 4

Release to Mission Control User Test Community

Release to Mission Control User Test Community

Release to Mission Control User Test Community

Release to Mission Control Ops

3 Weeks 6 Weeks 9 Weeks 12 Weeks

[email protected]

Page 23: User centered agile dev balanced team 2013

The Three-Week Cycle

User Feedback

3 Weeks Iteration n

Daily iteration nBuild to Customer

TestFeature mods/additions,bug fixes

Optional Mid-Iteration Hackathon tests bigfeatures

Pre-ShipHackathon

Priorities/JIRARankings

Nightly Build/Internal testing as features roll out

Coding

Issue Tracking Updates/Priorities/RankingsUE & Tech Spec dates driven by coding dependencies

Deliver to customer

Agile Development Iteration

Code Freeze (-3 days)

Feature Freeze(-7 days)

Customer triages issues it discovered

Customer acceptance test

Customer verification of closed JIRA issues

Customer installsiteration n-1

Optionally, hot patch

Iteration n+1

Start 24 hour test (-2 day)

Page 24: User centered agile dev balanced team 2013

The Release Cycle

Release

3 Weeks

Iteration 1 Iteration 2 Iteration 3 Iteration 4 Bugs/Usability/More Testing

6 Weeks 9 Weeks 12 Weeks

Release to Customerfor Mission Control Certification

Release to Mission Control User testCommunity

Coding/UE Specs

Issue Tracking Updates/Priorities/Rankings

Build/Internal testing as features roll out

Customer FeatureVerification

Release to Mission Control User testCommunity

Customer FeatureVerification

Release to Mission Control User testCommunity

Customer FeatureVerification

Agile Release Into Operations

Page 25: User centered agile dev balanced team 2013

Strategic Road Map

Page 26: User centered agile dev balanced team 2013

The TeamTraditional Agile 1 Agile 2*

Developers 5-9 Developers 7 Developers 4

User Experience Design (2)

User Experience Design (2)

User Experience Design (1)

QA/Process Engineers (2)

QA/Process Engineers (2) QA (.5)

Project Manager (1) Project Manager (1)Developers rotate

PM role

Principle Investigator (Part Time)

Principle Investigator (Part Time)

Principle Investigator (Part Time)

Interns Interns Interns

*Reduced Budget

Page 27: User centered agile dev balanced team 2013

Focus• Work on issues in order of priority

• Easier said than done

• JIRA/Greenhopper for issue tracking and ranking

• Developers should know what their priorities are

• Priorities should be achievable

• Don’t over-manage ranking, or over-assign

Page 28: User centered agile dev balanced team 2013

Where are we?• There is one, and only one measurement of

progress and that is working code

• Replace presentations, code line counts and other management metrics with the nightly build

• For progress relative to strategic and tactical situation see issue tracking system (we use JIRA)

Page 29: User centered agile dev balanced team 2013

Testing• Internal QA tests features as they roll out

• Our customer tested features daily to provide feedback

• Our customer used iteration deliveries and releases for final feature verification

• “Hackathons” tested scaleability in a lab environment

Page 30: User centered agile dev balanced team 2013

Some Lessons Learned• The train leaves the station on time

• A feature that misses one train just gets on the next one

• This requires frequent departures

• Do not ever delay a shipment unless the software does not work

Page 31: User centered agile dev balanced team 2013

It Takes Time

• Our journey was driven by need, i.e. we addressed issues as they came up, rather than being driven by a formal methodology

• We iteratively refined our methods over two years

Page 32: User centered agile dev balanced team 2013

Lessons Summary

• The measure of progress is working code

• Work on highest priorities first, avoid the temptation to do the easier things first

• Demonstrations, not presentations

• Customer interaction over extensive documentation

• Progress always visible, nightly build available

• The train leaves the station on time, only working features ship

• Do not delay shipment for features - if a feature is not ready it goes into the next iteration

Page 33: User centered agile dev balanced team 2013

!

Conclusion

• There is no one right way to do agile

• Fit and evolve the solution to your context of work