Page 1: Traffic Management Accomplishments and Needs Dec. 08, 2011

Traffic Management Division

Accomplishments and Needs FY 2011

Rob Clayton, P.E., PTOE Traffic Management Engineer

Presentation to the Transportation Commission

December 8, 2011

Page 2: Traffic Management Accomplishments and Needs Dec. 08, 2011

Outline of today’s presentation

• FY 2011 accomplishments

- Selected completed projects

- Performance measures

• FY 2012 priorities

• Funding needs

Page 3: Traffic Management Accomplishments and Needs Dec. 08, 2011

Selected FY 2011 completed projects

• “UDOT Traffic” smartphone application

• Corridor responsive ramp metering

• Adaptive traffic signal control in Heber City

• Numerous fiber optic connections

Page 4: Traffic Management Accomplishments and Needs Dec. 08, 2011

“UDOT Traffic” Smartphone App

Trends for smartphone usage in the United States: - 35% of adults have a smartphone (72 million nationwide) - 40% of mobile phones are smartphones - Ave. data usage per user increased by 89% in the past year - Cost of data dropped 43% in the past year

Page 5: Traffic Management Accomplishments and Needs Dec. 08, 2011

“UDOT Traffic” Smartphone App

Trends for smartphone usage in the United States: - 35% of adults have a smartphone (72 million nationwide) - 40% of mobile phones are smartphones - Ave. data usage per user increased by 89% in the past year - Cost of data dropped 43% in the past year

- Available free for the iPhone and Droid - Contains all data available on CommuterLink and 511 - 20,000 downloads in the first week! - Preliminary feedback is very positive

Page 6: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 7: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 8: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 9: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 10: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 11: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 12: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 13: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 14: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 15: Traffic Management Accomplishments and Needs Dec. 08, 2011

“UDOT Traffic” Smartphone App

Page 16: Traffic Management Accomplishments and Needs Dec. 08, 2011

Corridor Responsive Ramp Metering

What is it?

Page 17: Traffic Management Accomplishments and Needs Dec. 08, 2011

Corridor Responsive Ramp Metering

“Seattle Bottleneck Algorithm” automatically adjusts the metering rate to account for: - Mainline traffic volume at the merge - Level of mainline congestion downstream - Level of backing on the ramp

How does it work?

Page 18: Traffic Management Accomplishments and Needs Dec. 08, 2011

Corridor Responsive Ramp Metering

Current initial deployment on I-15 in Salt Lake County: - 3300 S to 9000 S (SB) - 12300 S to 7200 S (NB)

Broad implementation is in development.

Page 19: Traffic Management Accomplishments and Needs Dec. 08, 2011

Adaptive Traffic Signal System – Heber City

- 5 Signals on Main Street (US-40) - runs 16 hrs/day, 7 days/wk

Page 20: Traffic Management Accomplishments and Needs Dec. 08, 2011

How does adaptive signal control work?

Subsystem 2

Pla

n

16

12

SCATS Traffic Reporter

Cycle Length On Tuesday 18 September 2007 filename:PARKCT_20070918.sm

Septe be 8, 00

Plan 2 - 82 sec

Plan 3 - 86 secPlan 4 - 96 sec Plan 5 - 128 sec

Plan 2 - 82 sec

Plan 4 - 96 sec

Actual data from the SCATS system in Park City:

The system monitors traffic in real-time and dynamically modifies traffic signal timing and coordination plans.

Page 21: Traffic Management Accomplishments and Needs Dec. 08, 2011

Adaptive Traffic Signal System – Heber City

Page 22: Traffic Management Accomplishments and Needs Dec. 08, 2011

Expansion of the UDOT Fiber Optic Network

FY 2011 expansion through state funds and trades:

- Utah State University connection - SR-30, I-15 to Logan - I-15, Perry to Idaho border - I-80, 5600 West to Wendover - SR-36, Tooele to I-80 - SR-248, Park City to US-40 - Heber City interconnect - Vernal City interconnect - US-191, Moab to I-70 - I-70, Cove Fort to Richfield - Cedar City interconnect

Page 23: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 24: Traffic Management Accomplishments and Needs Dec. 08, 2011

Support of Region projects

Technical assistance on:

• 4 Diverging Diamond Interchanges (DDI)

• 12300 S Thru-Turn intersection

• 5400 S Flex Lane project

• 9 Continuous Flow Intersections (CFI)

• I-15 CORE project

Page 25: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 26: Traffic Management Accomplishments and Needs Dec. 08, 2011
Page 27: Traffic Management Accomplishments and Needs Dec. 08, 2011

FY 2012 Priorities

• World Class Signal Operations • Website and smartphone app personalization • Enhanced / automated information feeding 511 • Unifying CommuterLink and “Know Where, Know Why” • Software to improve efficiency in the control room • Continued expansion of the fiber optic network • VMS at the I-70 / US-6 junction • Connecting Utah County and Tooele dispatch centers • Variable speed limit pilot project in Parley’s Canyon

Page 28: Traffic Management Accomplishments and Needs Dec. 08, 2011

John Njord: “What would it take for UDOT’s traffic signal operations to be World Class?”

World Class Traffic Signal Operations

Page 29: Traffic Management Accomplishments and Needs Dec. 08, 2011

John Njord: “What would it take for UDOT’s traffic signal operations to be World Class?”

World Class Traffic Signal Operations

What needs to change? UDOT must become proactive with signal maintenance UDOT must become proactive with signal timing

Page 30: Traffic Management Accomplishments and Needs Dec. 08, 2011

John Njord: “What would it take for UDOT’s traffic signal operations to be World Class?”

World Class Traffic Signal Operations

What needs to change? UDOT must become proactive with signal maintenance UDOT must become proactive with signal timing

How will we accomplish these changes? Increase funding for maintenance and signal timing

Page 31: Traffic Management Accomplishments and Needs Dec. 08, 2011

Adaptive Systems that adjust dynamically to changes in traffic Automation Automated collection and broadcast of travel conditions

Artificial intelligence Software systems that learn and improve efficiency

The Future

Page 32: Traffic Management Accomplishments and Needs Dec. 08, 2011

• Less emphasis on ITS hardware • More emphasis on software systems and

traveler information • “Operational projects” to “Optimize Mobility”

Use of ITS Funding

Page 33: Traffic Management Accomplishments and Needs Dec. 08, 2011

• The state funding of $3 M per year is currently

adequate to address ITS priorities.

• We are shifting our use of ITS funding from infrastructure to software systems projects.

Summary