Page 2: ThoCon Thorium Power Plant Project

Indonesia Electricity capacity is the lowest in ASEAN

Page 3: ThoCon Thorium Power Plant Project

Indonesia need an Energy Miracle

CLEAN ENERGY that is AFFORDABLE that can be used as BASE LOAD that can be DEPLOY FAST with SMALL FOOTPRINT and SCALE UP very quickly

Lets put those criteria in a energy matrix..

Page 4: ThoCon Thorium Power Plant Project

ENERGY MIRACLE MATRIX

Page 5: ThoCon Thorium Power Plant Project

The next generation

of Nuclear is GEN

IV Reactor.

ALL feature a

passive safety

system and more

economical.

MSR has the most

simplest design

thus has the

highest safety, the

most economic and

efficient of all

Page 6: ThoCon Thorium Power Plant Project

Why Molten Salt as fuel | The best fuel for Nuclear reactor

• Shanghai Institute of Applied Physic (SINAP) have study all 3 type of nuclear fuel.

• Molten Salt give better economic and performance than other.

Page 7: ThoCon Thorium Power Plant Project

THE INDONESIA THORIUM CONSORTIUM

MOU sign in Washington DC in 26 October 2015

Page 8: ThoCon Thorium Power Plant Project

Inherent Safety SystemTotal passive system without requiring any power or human intervention

Generation IV Reactor

ThorCon TMSR

Page 9: ThoCon Thorium Power Plant Project

The Original MSR Design (1965 – 1969)

Molten Salt Reactor Pilot Plant Runs successfully for 13,000 hour in Oak Ridge National Lab

Page 10: ThoCon Thorium Power Plant Project

ThorCon Reactor

• Inherently Safety

• 72 days – 6 months passive decay heat removal system

• 4 layer of Physical containment + 1 Chemical

• Can replaced every 4 years

• Automatic Continuous safety check

• Emergency Drain Tank (EDT)

• 250 MWe duplex module

• Earthquake resistant up to 0.8 PGA

• Anti Fukushima Design

16.5

mete

r

7.2 meter

ANTI

FUKUSHIMA

DESIGN

Page 11: ThoCon Thorium Power Plant Project

● Nuclear plant divided into 250

MWe/557 MWt underground power

modules.

● Each module is made up of two Cans

housed in silos.

● Each Can contains a 250 MWe

reactor, primary loop pump, and

primary heat exchanger.

● Cans are duplexed. To accommodate

4 year moderator life, Can operates

for four years, then cools down for

four years, and then is changed out.

Nuclear Island Modularity is 250 MWe

Page 12: ThoCon Thorium Power Plant Project

ThorCon is a Four Barrier Design

1. Primary Loop

2. Can/EDT3. Silo Cavity

3. Silo Hall

1. Primary Loop Piping, Pump,

Pot, HX

2. Can/Drain Tank, 5 bar over-

pressure.

3. Silo Cavity. Inerted.

Duplex/triplex barrier.

4. Silo Hall, 1 bar over-pressure.

Triplex barrier.

The 5th Barrier is The Fuel Salt

Most reactor has only 2

radiation barrier, EPR

has 3, Thorcon has 5

barrier.

Page 13: ThoCon Thorium Power Plant Project

● Continuously tested by absorbing

<1MW of heat from primary loop.

Monitor temperature and flow.

● In full power, old salt drain, decay

heat power to membrane wall peaks

at about 5 MWt 3 hours after drain.

● Fuelsalt temp peaks at 960℃. 470℃below boiling point.

● Membrane wall can handle 30 MWt.

● Pond contains 72 days worth of

water.

● With wet towers, goes to > 6 months.

● Cooling rate reduces drastically as

salt temperature comes down. Over

100 days before salt freezes.

● Passive cooling for several

months

Membrane Wall Decay Heat Loop

ste

am

Cold water

Page 14: ThoCon Thorium Power Plant Project

Convert energy in 4 loop : 45% efficiency

Tritium is

Catch here.

reactor

Page 15: ThoCon Thorium Power Plant Project

Thorcon 2 optionOn-shore (land based) & Off-Shore (Sea based)

Page 16: ThoCon Thorium Power Plant Project

ThorCon Nuclear Island (inside)

1000 MW ThorCon Nuclear

Island (Land based version)

Page 17: ThoCon Thorium Power Plant Project

Reactor TurbineCooling

pond

Hatch

Area for

switches

ThorCon Isle 500 MW

Page 18: ThoCon Thorium Power Plant Project

KRI Banjarmasin, the

largest warship build in

Indonesia by PT PAL

Page 19: ThoCon Thorium Power Plant Project

414 meter

195 meterDepth 10 - 15 meter

Page 20: ThoCon Thorium Power Plant Project

ThorCon 1000 MW land based version

Can being put into silo cavity by crane

Service Ship arriving with NEW can

Page 21: ThoCon Thorium Power Plant Project

Delivery SystemFast Deployment and Mass Production System

Page 22: ThoCon Thorium Power Plant Project
Page 23: ThoCon Thorium Power Plant Project

New Approach to ContructionConventional Nuclear Plant ThorCon Plant

Build on site with different supply chain

every time. Does not get economic of

scale

Build on yard with block module. Every

time the same exact supply chain. Get

economic of scale

Page 24: ThoCon Thorium Power Plant Project

• ULCC Cost USD 89,000. Build time 12 Months – I

GWe ThorCon nuclear island would fit in the center

tanks

• 67,000 toms of complex steel vs 18,000 simple

ThorCon nuclear island

• Direct labor : 700,000 man-hour, 350 man-year,

about 40% hull, 60% outfitting

• 4 to 5 man-hours per ton of hull steel

A. PANEL LINES

B. ROBOTIC WELDING

C. BLOCK CONSTRUCTION

D. SHORT TIME FOR COMPLETION

E. MASS PRODUCTION

What makes ThorCon reactor cheap

Yard Technology = Cost Savings and Better Quality

“Build reactor they way large

ship is build”

Page 25: ThoCon Thorium Power Plant Project

Uses less steel than other reactor

Page 26: ThoCon Thorium Power Plant Project

Energy Miracle Matrix

Page 27: ThoCon Thorium Power Plant Project

The PlanThe Next 20 years

Page 28: ThoCon Thorium Power Plant Project

No Year Cost Activity

1 2016 - 2017 $ 10,000,000 Final Design Work; Contract

Negotiations with Shipyards and

Vendors; Site Selection; Feasibility

Study; Permissions

2 2018 $ 85,000,000 Construction of Pre-Fission Prototype.

3 2019 $ 35,000,000 Testing Pre-Fission Prototype

4 2020 $ 520,000,000 Construction of Pre-Fission Prototype

5 & 6 2021 - 2022 $ 130,000,000 Testing of Fission Prototype

ThorCon 500 MW Prototype Development Cost

Page 29: ThoCon Thorium Power Plant Project

2016 - 2022

500 MW

Prototype

2022- 2025

6 x 500 MW Power

Units

2.4 Billion USD

2018 : Build Pre-

Fission

2019 : Cold Test

2020 : Build Fission

2021 : Hot Test

2022 : Commissioning

The PLAN : Phase 1

Phase 1: 3.5 GW of Power

1. $3.18 BILLION INVESTMENT FOR 4

PLANT

2. 1,000 JOBS AT THE PLANTS

3. 1,000 JOBS FROM SUPPORT

INDUSTRY

780 Million

USD

Page 30: ThoCon Thorium Power Plant Project

Phase 2: Place Reactor Yard in Indonesia

A. $16.5 Billion over 20 years

160 Billion if 20 Plants per Year for 10

Years (Includes export and domestic

market)

B. 5,000 Jobs at the

C. 5,000 Jobs in Support Industries

D. 6000 Operator Jobs each year.

2025

10 – 20 GW per year

Build in Indonesia

The PLAN : Phase 2

Page 31: ThoCon Thorium Power Plant Project

Benefit for Indonesia

• All the CHEAP electricity NEEDED to grow up to 20 GW/ year

• $160 Billion Investment in 20 years (for 20 plant /per year)

• 5000 Jobs created in the Reactor Yard

• 5000 job in supporting Industries

• 6000 plant operator Jobs/year (300 operator per plant)

• Indonesia will become the World Center of Excellence for Advance Nuclear

• Indonesia shipyard industries will become world class at par with Korea and Japan.

Page 32: ThoCon Thorium Power Plant Project

Who are we?

Jack Devanney

David Devanney Chris Uhlik

Lars JorgensenRalph Moir

Bob Hargraves

and a few

others...

Bob Effendi

Page 33: ThoCon Thorium Power Plant Project

Other MSR Development in the World

Page 34: ThoCon Thorium Power Plant Project

MSR is the most popular of the Gen IV Reactor

Page 35: ThoCon Thorium Power Plant Project

Among the other is : China & Bill gates

Page 36: ThoCon Thorium Power Plant Project

Resources

• Thorcon Power : www.thorconpower.com

• Presentation (video) by Lars Jorgensen (CEO Thorcon) at Thorium Energy Alliance Conference https://www.youtube.com/watch?v=VfsOYzOpYRw

• Thorium Energy Report, produce by Thorium Energy World , which host Thorium Energy Conferences since 2010. http://www.thoriumenergyworld.com/

• MSR Review by EPD, an independent review of MSR by UK energy consultant http://www.energyprocessdevelopments.com/uploads/EPD%20MSR%20Review%20Feasibility%20Study%20July%202015%201.02.pdf

• The Weinberg Foundation : http://www.the-weinberg-foundation.org/learn/next-gen/thorium/

• Thorium Energy Alliance : http://www.thoriumenergyalliance.com/

Page 37: ThoCon Thorium Power Plant Project

Thank YouBob S. Effendi | Chief Representative Thorcon Power

[email protected] | 62-811-939-013