13
The Emerson Cup 2011 The Emerson Cup 2011 Asia & Middle East Asia & Middle East

The Emerson Cup 2011 Winners

Embed Size (px)

DESCRIPTION

The Emerson Cup 2011 Asia & Middle East

Citation preview

Page 1: The Emerson Cup 2011 Winners

The Emerson Cup 2011 The Emerson Cup 2011 Asia & Middle EastAsia & Middle East

Page 2: The Emerson Cup 2011 Winners

Architecture Students AwardArchitecture Students AwardArchitecture Students AwardArchitecture Students AwardProject: The Hub Transformable

Multi Function House

Institute: College of Engineering, Trivandrum, India,

Winners: Mabin Mathew

Recycling Container As A Potential Home Envelope

Primary Resources Used In Its Form Making As Well As Environmental Management

Effective Documentation, Analysis And Presentation

Addressed Limitations/ Concerns Of The Project Along With Solution

Page 3: The Emerson Cup 2011 Winners

Engineering Students AwardEngineering Students AwardEngineering Students AwardEngineering Students AwardProject: UP Concept Energy House

Institute: University of Philippines Diliman,

Winners: Paul Jeremiah C. De Leon, Jaur A. Francisco, Greg Angelo L. Hernando, Michael S. Mayuyu

Unique Suggestion Of Using Container As A Recycled Element To Deliver An Affordable And Sustainable Housing

Studies From Secondary Sources Have Been Effectively Applied To The Proposed Design Solutions

Diverse Dimensions Of Energy-efficiency From Insulation And Conservation To Regeneration Has Been Applied

Page 4: The Emerson Cup 2011 Winners

Commercial Refrigeration Commercial Refrigeration Honorary AwardHonorary AwardCommercial Refrigeration Commercial Refrigeration Honorary AwardHonorary Award

Project: Cascaded Energy Plant

Applicant: Dr. R. Saravanan and C. Narendran

Application: Pharmaceutical Plant

Total Size: 119 RT Cooling / 1108 Kw Heating

Innovation In Technology

Uses Natural Refrigerant –Ammonia - Vapor Absorption System)

Optimization Of Energy Usage Through Integration Of Appropriate Technologies

No Heat Rejection To The Environment.

Boiler Heat To Ammonia Absorption Chiller & Usage Of Residual Heat

Page 5: The Emerson Cup 2011 Winners

Commercial Refrigeration Commercial Refrigeration Excellence AwardExcellence AwardCommercial Refrigeration Commercial Refrigeration Excellence AwardExcellence Award

Applicant: Ek-Chai Distribution (TESCO Thailand)

Project: Lamlukka Fresh DistributionCentre, Pathumthani, Thailand

Application: Four temperature controlled chambers 20°C, 12°C, 1°C and -21°C

Total Size: 1,500HP

Large Scale & high Complexity

Consistency Of The System's Design Across Different Stages Of Operations Translated In High Efficiency

Excellent Documentation

Reduce Carbon Emission By 32% Per Sqm.

Usage Of The Most Advanced Technology And Equipment In Asia

Page 6: The Emerson Cup 2011 Winners

Retrofit BuildingRetrofit BuildingHonorary AwardHonorary AwardRetrofit BuildingRetrofit BuildingHonorary AwardHonorary Award

Project: Radisson Blu, Cebu, Philippines

Applicant: Guevara and Partners, Inc.

Application: Hotel

Total Size: 178 RT

Significant Energy Savings Through The Application Of Heat Pump Technology

Traditional Oil Fired Boilers Replaced

Simultaneous Use For Pre-cooling Chilled Water

60% Reduction In Operating Energy Costs

Page 7: The Emerson Cup 2011 Winners

Retrofit Building Retrofit Building Excellence AwardExcellence AwardRetrofit Building Retrofit Building Excellence AwardExcellence Award

Project: Fateh Prakash Palace Heritage Hotel, Udaipur, India

Applicant: Pankaj Dharkar & Associates

Application: Heritage Hotel

Total Size: 256 HP

Heritage Building Needs Of Keeping Architectural Features Intact

Resolutions Are Sympathetic To The Character Of This Place While Retaining Its Technical Efficiencies And Performances

Retrofitting Enhanced The Economic And Aesthetic Value Of The Property

Page 8: The Emerson Cup 2011 Winners

New BuildingNew BuildingHonorary AwardHonorary AwardNew BuildingNew BuildingHonorary AwardHonorary Award

Project: Campus for Research Excellence and Technological Enterprise (CREATE), Singapore

Applicant: ARUP Singapore

Application:Campus for a multidisciplinary and multicultural research community

Total Size: 4000 RT

Integrated Approach To Service Design & Concern For Energy-demand Reduction

Innovative Design - Breaking The Masses And Zoning The Functional Areas

Applying The Appropriate Ventilation Systems For The Wet-&-dry Areas Of The Laboratory

Well Documented Savings

First Laboratory Complex In Singapore To Attain Green Mark Platinum Certification.

Page 9: The Emerson Cup 2011 Winners

New BuildingNew BuildingExcellence AwardExcellence AwardNew BuildingNew BuildingExcellence AwardExcellence Award

Project: New Bangkok Government Mega Center, Bangkok, Thailand

Applicant: EEC Engineering Network

Application: Office

Total Size: 6000 RT

Large Scale & Complex: Efficient from its space planning and architectural design to detailing

Use of non-conventional systems like Geothermal Heat Sink

Holistic approach to building design by combining architecture with practicality of energy savings

Clean fresh air supply through 85% efficiency air filter

Condensate water collection system that collect over 300 m3/day of “Free” and cool water

Page 10: The Emerson Cup 2011 Winners

New Building With Emerson TechnologiesNew Building With Emerson TechnologiesSpecial MentionSpecial MentionNew Building With Emerson TechnologiesNew Building With Emerson TechnologiesSpecial MentionSpecial Mention

Project: ``` Jawarharlal Nehru Bhavan, New Delhi

Applicant: V.S. KUKREJA & ASSOCIATES PVT. LTD

Application:Office

Total Size: 2112 HP

India Government’s first Green Building – designed as LEED Gold as per USGBC

Innovative Approach To Address Cooling / Heating Needs

High Efficiency VRF system

Demonstrated 30% savings compared To Conventional Technologies

Page 11: The Emerson Cup 2011 Winners

New Building With Emerson TechnologiesNew Building With Emerson TechnologiesHonorary AwardHonorary AwardNew Building With Emerson TechnologiesNew Building With Emerson TechnologiesHonorary AwardHonorary Award

Project: ``` Tata Consultancy Services ``````````(Powai), Mumbai, India

Applicant: Vijay Punjabi Consultants Pvt. Ltd.

Application:Software / BPO Offices

Total Size: 3161 RT

Optimized Air-conditioning Systems Within The Prevailing Constraints

Appropriate Selection Of Digital Scroll Technology For The Given Site Condition And Project Size

Caters To Individualistic Air-conditioning Needs And Usage, With Minimal Life Cycle Cost

Ease of Installation, Maintenance And Operation

Inspite Of Being Decentralized Has All The Benefits Of Central Air-conditioning

Page 12: The Emerson Cup 2011 Winners

New Building With Emerson TechnologiesNew Building With Emerson TechnologiesExcellence AwardExcellence AwardNew Building With Emerson TechnologiesNew Building With Emerson TechnologiesExcellence AwardExcellence Award

Project: Assumption University Bangna Campus, Bangkok

Applicant: InterBrand Trader Co., Ltd

Application: University Building

Total Size: 305 KW

Widely Varying Cooling Demand

Innovative Approach In Design

Introduction Of Corridor As The Buffer Zone, Has Helped Create Favorable Conditions For The Project

Intelligent Introduction Of Air-conditioning Technology To Achieve Efficient And Effective Cooling

Page 13: The Emerson Cup 2011 Winners