66
The Barangay Disaster Risk Reduction Management Plan ( 2013-2016 ) Barangay 465 Zone 46 City of Manila Submitted by : Alexander T. Tasarra Punong Barangay

The Barangay Disaster Risk Reduction Management Plan

Embed Size (px)

Citation preview

Page 1: The Barangay Disaster Risk Reduction Management Plan

The Barangay Disaster Risk Reduction Management Plan

( 2013-2016 )

Barangay 465Zone 46City of Manila

Submitted by :

Alexander T. Tasarra

Punong Barangay

Page 2: The Barangay Disaster Risk Reduction Management Plan

MESSAGE FROM PUNONG

BARANGAY

Page 3: The Barangay Disaster Risk Reduction Management Plan

MESSAGE FROM THE PUNONG BARANGAY

Nature have it own fury and no force of man can stop the devastating effect of it, to caution the effect of it we must study and make necessary preventive action to reduce or even eliminate the risk that may arise.

The importance of BDRRM for us is to be prepared of any disaster that may occur and by doing so, we minimize the impact of disaster. Ultimately to educate the people and be aware of any impending natural calamities that may occur.

ALEXANDER T. TASARRA

Barangay Chairman

Barangay 465, Zone 46, District IV

Page 4: The Barangay Disaster Risk Reduction Management Plan

Vision :

To be able to uplift the current standard of living, peace and order and cleanliness of the barangay.

Mission :

Foster cooperation of all Barangay Council together with all the members of the community to attain the vision.

Goals :

Have improve standard of livingMaintain Peace and Order

Maintain Cleanliness of the Barangay

Page 5: The Barangay Disaster Risk Reduction Management Plan

EXECUTIVE SUMMARY

As per inventory of the BDRRM facilities, the barangay can accommodate people who’s been affected by disaster, we have barangay hall.

The barangay is actively participate in an on-going seminars and skill that conducted by the city. The barangay council are always aware of emergency that may occur in the barangay. The barangay tanod always visible within the barangay jurisdiction to assist for any problem that may occurred.

The barangay also have a First Aid Kit, Fire Extinguisher, CCTV to promote readiness in disaster that may occurred in barangay.

Page 6: The Barangay Disaster Risk Reduction Management Plan

HISTORY OF CALAMITIES

AND DISASTERS IN BRGY. 465

Page 7: The Barangay Disaster Risk Reduction Management Plan

History of CalamitiesThere where calamities before and during the 1st term of Punong

Barangay Alexander T. Tasarra. It was 2009, tropical storm ONDOY and Typhoon Pedring, out down the country’s economic growth in the past years, according to the Vice Chair of the climate change Commission ( CCC ).

There is need to address the vulnerability of natural resources to climate change to ensure sustainable economic growth. We lost an average of our GDP due to damage cause by extreme events ( Ondoy, Pedring, Quiel, Sendong, etc. ) during the last 3 years. Government estimated damage from Ondoy wich drowned most in Metro Manila 2009, hit a 11 billion.

During the typhoon of course the barangay officials especially the Punong Barangay Alexander T. Tasarra, always roving together with all the barangay tanods.

Page 8: The Barangay Disaster Risk Reduction Management Plan
Page 9: The Barangay Disaster Risk Reduction Management Plan
Page 10: The Barangay Disaster Risk Reduction Management Plan

BARANGAY PROFILE

Page 11: The Barangay Disaster Risk Reduction Management Plan

Barangay ProfileBarangay 465, Zone 46 is located at east zone of Sampaloc

area under District IV legislative jurisdiction of Manila City. It is composed of 400 estimated families with an estimated population of 3,000. Barangay 465 is bounded on the East by Padre Noval St. (U.S.T), West by G. Tolentino (Brgy.467) , North by J. Barlin St. (brgy. 466) and South by I. Delos Reyes St. ( Brgy. 469)

Barangay 465 is proud to have within our territorial area of jurisdiction the oldest university in Asia and the home of the Dominican priests, the University of Santo Tomas and UST Parish Church respectively.

This small barangay community is proud to be the sanctuary of students that are studying in different universities and of middle class families generating most of their income from varied public and private employments, small scale business enterprises, professional practices and skills.

Among the various projects offered to our constituents are declogging, beautification, clean and green, solid waste management, sports activities and fitness programs, medical, distribution of school supplies, disaster preparedness, livelihood and poverty alleviation trainings, gift-giving, feeding programs, preservation of peace and order, anti-drug campaign programs and more.

Page 12: The Barangay Disaster Risk Reduction Management Plan

BARANGAY PROFILE

On 1972, the late President Ferdinand Marcos declares the creation of barangays in Manila through the Presidential Decree. Barangay 465 is one of the barangay that has beed ratified on the aforesaid year. Barangay belongs to an urbanized city and falls in lowland category. It has a land area of 2 hectares.

Based on the fiscal year 2012-2013, Barangay 465 has an approved budget of Php 1,220,054.00 whereas it came from the following shares:

Internal Revenue Allotment – P872,245.00

Real Property Tax – P347,809.00

Page 13: The Barangay Disaster Risk Reduction Management Plan

There are 400 families living in the Barangay and divided into 200 households. Therefore, it can be stated that in one house stucture there maybe 2 families living.

Barangay 465 has a total of 313 number of registered voters in which it is clustered into two precincts.

Based from our estimated number of population, Barangay 465 has a total estimated population of three thousand ( 3000 ) people wherein 1800 are female and 1200 are male.

Page 14: The Barangay Disaster Risk Reduction Management Plan

BARANGAY PROFILETOTAL POPULATION : 3000

Male : 1200Female : 1800Persons w/ Disability : 0Children : 50Señior Citizens : 18Pregnant Women : 0

Schools present near the Barangay :

University of Santo ThomasP.Gomez Elementary SchoolJuan Luna Elementary SchoolCentral Institute of Technology

Number of Business Establishment : 26

Hospital and others Establishmentnear the Barangay:

UST HospitalRaha Fire Volunteer

Page 15: The Barangay Disaster Risk Reduction Management Plan

RISK / HAZARD / VULNERABILITY

MAP

Page 16: The Barangay Disaster Risk Reduction Management Plan

BARANGAY 465 MAP

Page 17: The Barangay Disaster Risk Reduction Management Plan

HAZARD MAPLEGENDS :

- FIRE PRONE AREA- FLOOD PRONE AREA

Page 18: The Barangay Disaster Risk Reduction Management Plan

CONTINGENCY AND

EVACUATION PLAN

Page 19: The Barangay Disaster Risk Reduction Management Plan

BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT COMMITTEE

( BDRRMC )2013-2016 DISASTER CONTINGENCY PLAN

Disaster Situation Population Target # of Families Evacuation Centers Budgetary Sources Inventory of Available Disaster Equipments

Super Typhoon 3000 400 BARANGAY HALL

RAHA FIRE VOLUNTEER STATION

BDRRM MegaphoneTwo-Way Radio

Floods 3000 400BARANGAY HALL

RAHA FIRE VOLUNTEER STATION

Declogging Materials

Fire 3000 400 BARANGAY HALL

RAHA FIRE VOLUNTEER STATION

Fire Extinguishers

First Aid Kit, BP Apparatus

Earthquake

Page 20: The Barangay Disaster Risk Reduction Management Plan

SEMINARS ATTENDED

Page 21: The Barangay Disaster Risk Reduction Management Plan

2011 SEMINAR ( BAGUIO )

Page 22: The Barangay Disaster Risk Reduction Management Plan
Page 23: The Barangay Disaster Risk Reduction Management Plan
Page 24: The Barangay Disaster Risk Reduction Management Plan

2012 SEMINAR ( SUBIC )

Page 25: The Barangay Disaster Risk Reduction Management Plan
Page 26: The Barangay Disaster Risk Reduction Management Plan
Page 27: The Barangay Disaster Risk Reduction Management Plan

Early Warning System

Equipment and Materials for

Disaster

Page 28: The Barangay Disaster Risk Reduction Management Plan

EARLY WARNING SYSTEM

In this time, we are not sure of how strong the disaster may

occur in our barangay. Everyone now is vulnerable in any disaster.

Typhoons and are became stronger unlike before and the Fire has

grown rapidly and spread primarily wooden houses. We are not sure

how safe we are right now.

As one of the Barangay in Sampaloc, we ensure to have early

warning system in areas that are prone in disaster.

Page 29: The Barangay Disaster Risk Reduction Management Plan

FLOOD

With the presence of MEGAPHONE and TWO-WAY

RADIO we can inform all our constituent if the flood is too

high and they can evacuate to evacuation center if ever.

Page 30: The Barangay Disaster Risk Reduction Management Plan
Page 31: The Barangay Disaster Risk Reduction Management Plan
Page 32: The Barangay Disaster Risk Reduction Management Plan
Page 33: The Barangay Disaster Risk Reduction Management Plan
Page 34: The Barangay Disaster Risk Reduction Management Plan
Page 35: The Barangay Disaster Risk Reduction Management Plan

FIREWith the presence of Megaphone, Two-Way Radio

and presence of RAHA FIRE VOLUNTEER, we can inform

all the people in barangay and fire volunteer as early as

the fire occurred and to response as quick as they can.

Information are properly announce by means of

MEGAPHONE to all the people that within the jurisdiction

of our Barangay.

Page 36: The Barangay Disaster Risk Reduction Management Plan
Page 37: The Barangay Disaster Risk Reduction Management Plan
Page 38: The Barangay Disaster Risk Reduction Management Plan

BDRRM PRIORITY PROJECT

Page 39: The Barangay Disaster Risk Reduction Management Plan

BARANGAY PROJECTS

The Barangay Budget has its own Calamity Fund. The

Calamity Fund is divided into 70% and 30% for the Quick

Response Fund during Calamity.

The Calamity Fund should be allocated into equipment

and materials to be used if hazard is occurred.

Page 40: The Barangay Disaster Risk Reduction Management Plan

BARANGAY PROJECTS FOR 2013

NAME OF PROJECTS HAZARD INVOLVED NO. OF BENEFICIARIES BUDGETARY REQUIREMENTS

DECLOGGING FLOOD 100% of the constituent PHP 18,918.00

DECLOGGING MATERIALS FLOOD 200 FAMILIES PHP 39,964.00

Page 41: The Barangay Disaster Risk Reduction Management Plan

GENERATOR

Page 42: The Barangay Disaster Risk Reduction Management Plan

BP APPARATUS

Page 43: The Barangay Disaster Risk Reduction Management Plan

FIRE EXTINGUISHER

Page 44: The Barangay Disaster Risk Reduction Management Plan

OMRON NEBULIZER

Page 45: The Barangay Disaster Risk Reduction Management Plan

FIRST AID KIT

Page 46: The Barangay Disaster Risk Reduction Management Plan

MEGAPHONE

Page 47: The Barangay Disaster Risk Reduction Management Plan

DECLOGGING MATERIALS

Page 48: The Barangay Disaster Risk Reduction Management Plan

TWO-WAY RADIO

Page 49: The Barangay Disaster Risk Reduction Management Plan

FLASHLIGHT

Page 50: The Barangay Disaster Risk Reduction Management Plan

PROCUREMENT PLAN

Page 51: The Barangay Disaster Risk Reduction Management Plan

PROCUREMENT PLAN

Nobody knows when the disaster may happen or occur

in our barangay. One of the many functions of the Barangay

Disaster Risk Reduction Management Council is to have a

procurement plan. During the disaster, the Barangay Disaster

Risk Reduction Management members should know the number

of beneficiaries and also the number of supply for the needs of

the victims.

The 30% quick response fund can be used if there is a

state of calamity that announce by the government officials.

This will help the BDRRM members to decide on what to buy

and what are the needs of the victims.

Page 52: The Barangay Disaster Risk Reduction Management Plan

DESCRIPTION SIGNIFICANCE BUDGETARY AMOUNT

Sack of Rice Serves as food supply of victims

Quick Response Fund

Canned Goods Serves as food supply of victims

Quick Response Fund

PROCUREMENT PLAN

Page 53: The Barangay Disaster Risk Reduction Management Plan

PROCUREMENT PLAN FOR 2013

Programs / Project Activities Budgetary Requirements EXPECTED OUTPUT Budgetary Sources

Training & Capability Building

BDRRM Planning and Assessment ( 2013 ) Php 5,000.00

To enhance and capacitate the skills and knowledge of

Barangay Officials and volunteers

BDRRM

Declogging ( 2013 ) Php 27,934.00To prevent flooding in the barangay & to contribute

in the cleanliness of Manila Bay

BDRRM

Equipment Declogging Materials ( 2013) Php 39,964.00 Used to unclog water in drainage BDRRM

Page 54: The Barangay Disaster Risk Reduction Management Plan

POLITICAL, ECONOMIC, SOCIAL AND

ENVIRONMENTAL DIMENSION

Page 55: The Barangay Disaster Risk Reduction Management Plan

KNOWLEDE, SKILLS AND ATTITUDES INVENTORY

Page 56: The Barangay Disaster Risk Reduction Management Plan

INVENTORY OF DRRM FACILITIES AND

EQUIPMENT

Page 57: The Barangay Disaster Risk Reduction Management Plan

2011 CALAMITY FUND

Page 58: The Barangay Disaster Risk Reduction Management Plan

2012 CALAMITY FUND

Page 59: The Barangay Disaster Risk Reduction Management Plan
Page 60: The Barangay Disaster Risk Reduction Management Plan

ATTACHMENTS

Page 61: The Barangay Disaster Risk Reduction Management Plan

Alexander T. Tasarra Chairman 09052918577

Greg F. Factor Kagawad 7085675

Crizaldo John T. Batac

Kagawad 09156437737

Arlene B. Bantolino Kagawad 09994558328

Joanne L. Alog Kagawad 09177561595

Jose C. Yabut Kagawad 7357537

Melisa L. Miranda Kagawad 09197238247

Andres R. Magpantay Kagawad 09334667687

Cesar G. Paguiligan Secretary 09152564262

Rogelio DP Miranda Treasurer 7085675

DIRECTORY OF BDRRM MEMBERS

Page 62: The Barangay Disaster Risk Reduction Management Plan

BARANGAY DISASTER

READINESS PROFILE

Page 63: The Barangay Disaster Risk Reduction Management Plan

BARANGAY DISASTER

READINESS CHECKLIST

Page 64: The Barangay Disaster Risk Reduction Management Plan

BARANGAY RESOLUTIONS

Page 65: The Barangay Disaster Risk Reduction Management Plan

EQUIPMENT, SUPPLIES AND MATERIALS OF BARANGAY 465

AVAILABLE

Page 66: The Barangay Disaster Risk Reduction Management Plan

DESCRIPTION SIGNIFICANCE

Generatorto be used as a temporary light in case of

brownout

BP Apparatusused to find out the blood pressure of a

person

Fire Extinguisher can be used in case of fire

Flash Light to be used as a temporary light in case of

brownout

Nebulizer can be used in case of person with asthma

First Aid Kit First Aid Equipment

Barangay Patrolto responsed immediately on any emergency

cases

Declogging Materials used to unclog the water in drainage

Two-Way Radio To be used during and after calamities and for other barangay activities

Megaphone To be used during and after calamities and for other barangay activities