18
April 10 through 12, 2014 “21 for 21” A 21 st Century Green Vision for the 21 st Street Corridor Study Area A Study Area B Study Area C http://www.southsidegreen.com Contributors Tom Batroney Jeremy Brown Kathy Chavara Heather Fuller Jen Kullgren Tim Prevost Patrick Roberts Mike Takacs Anna Werle Megan Zeigler Study Area A – Team 1

Team 1 final

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Team 1   final

April 10 through 12, 2014

“21 for 21” A 21st Century Green Vision for the 21st Street Corridor

Study Area A

Study Area B

Study Area C

http://www.southsidegreen.com

ContributorsTom BatroneyJeremy BrownKathy ChavaraHeather FullerJen KullgrenTim PrevostPatrick RobertsMike TakacsAnna WerleMegan Zeigler

Study Area A – Team 1

Page 2: Team 1   final

April 10 through 12, 2014

• Goals:– Accommodate Pedestrian, Bicycle and Vehicles– Traffic calming and safety– Cycling as transportation – Minimize parking impacts– Balance access and circulation– Stormwater capture for 1” of rainfall runoff– Separate stormwater system

Page 3: Team 1   final

April 10 through 12, 2014

Page 4: Team 1   final

April 10 through 12, 2014

Study Area A – Transportation Design Featureshttp://www.southsidegreen.com

• Pedestrian, Bicycle, and Business Friendly and Integrated– Two Way Bicycle Traffic – Loading Docks Accommodated – Reallocating Two Parking Spaces

Page 5: Team 1   final

April 10 through 12, 2014

Page 6: Team 1   final

April 10 through 12, 2014

Birmingham Bridge

New Bicycle Lane to 21st Street

Page 7: Team 1   final

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A

Page 8: Team 1   final

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A - East Carson Street to Fox Way

Page 9: Team 1   final

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A - Fox Way to Merriman Way

Page 10: Team 1   final

April 10 through 12, 2014 http://www.southsidegreen.com

Study Area A - Merriman Way to the River

Page 11: Team 1   final

April 10 through 12, 2014 http://www.southsidegreen.com

Before

Page 12: Team 1   final

April 10 through 12, 2014 http://www.southsidegreen.com

After

Page 13: Team 1   final

April 10 through 12, 2014

21st Street Cross Section

Page 14: Team 1   final

April 10 through 12, 2014

Wharton Street Cross Section

Page 15: Team 1   final

April 10 through 12, 2014

Study Area A – Stormwater Design Features

http://www.southsidegreen.com

• Designed Ground Level Impervious Area and Building Roof Area– Permeable Paver Subsurface Storage – Bioinfiltration Rain Gardens – Stormwater Day Lighting and Stepped Wetlands

Stormwater Management of 1.1 inches

3.5’ Deep

Page 16: Team 1   final

April 10 through 12, 2014

Study Area A – Stormwater Design Features

http://www.southsidegreen.com

• Increased Green Space Area – 5000 Sq Ft Added– Landscaped Traffic Calming Bumpouts– Planter Boxes and Trees

• Additional Tree Canopy – Approx. 38 Trees Total• ~23 Large Sized Trees and ~15 Smaller Size

Page 17: Team 1   final

April 10 through 12, 2014

Staghorn Sumac Sweetbay Magnolia Bald Cypress

BlackgumAmerican HophornbeamSwamp White Oak

Page 18: Team 1   final

April 10 through 12, 2014

“21 for 21”Questions?