Task groups In Casual

Task groups in casual

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Task groups in casual

Task groupsIn Casual

Page 2: Task groups in casual

When managing complex projects you can decompose complex tasks or gather relevant tasks together by using Task Groups.

Page 3: Task groups in casual

Any task can be converted to a group by pressing Convert to group button. Or press the right mouse button and select the same option in context menu.

Page 4: Task groups in casual

To gather multiple tasks into a group you should select them and press the Group tasks button. Or call context menu and choose Group selection.

Page 5: Task groups in casual

Double-click a group to open it. Pop-up window can be expanded by double-clicking on a title.

Page 6: Task groups in casual

After you converted complex task into a group you can plan a sub-process inside it. The group becomescomplete when you complete every task inside it.

Page 7: Task groups in casual

A colored line at the bottom of a task group indicatesa progress. Numbers show how many tasks in which state are in the group (green is for complete tasks, blue – active, grey – blocked).

Page 8: Task groups in casual

Really complex projects may require creating groups inside other groups.

Page 9: Task groups in casual

Each group opens inside the same window. To navigate back one level you can click on the arrow near a title of a window.

Page 10: Task groups in casual

You can drag tasks into a group or from a group to a project canvas.

Page 11: Task groups in casual

If you drag a task over a group and wait a moment, the group will open so you can put a task inside it.

Page 12: Task groups in casual

Top-level groups and its contents are displayed in task lists as you see on the picture.

Page 13: Task groups in casual

Group is still a task. Change name, write notes, set deadlines, work with files or comments as usual.

Page 14: Task groups in casual