26

Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Embed Size (px)

DESCRIPTION

How to reduce the cost of hardware in telecentres and telecentre networks? GreenBridge presents it innovative and very low cost solution!

Citation preview

Page 1: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing
Page 2: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Jimena BetancourtCoordinación TIS [email protected]@jimebeta

Page 3: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

1.2.

3.

Building Knowledge

Finding Solutions and Partners

Planning and Managing for Innovation, Technology and Sustainability

THREE PHASES:

Page 4: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

2. Finding Solutions and Partners for Technology, Innovation and Sustainability

•Identify partners to develop distribution channels of ICT products and services such as e-health, distance education, telecommunication solutions and many more

•Identify management solutions based on open software applications

•Identify solutions to lower hardware cost

•Identify partners to develop applications for greater impact in the communities served by telecentres

Goals:

Page 5: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

David Yunger

PresidentGreenBridge Computing

Page 6: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Turn 1 PC into 15:Direct Virtualization

via GreenBridge Computing

David YungerFounder and President

GreenBridge Computing, IncOctober 4, 2012

Page 7: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

David YungerDavid Yunger, CEO, GreenBridge Computing, is a social entrepreneur with a 15-year background in education technology. A former educator and Fulbright scholar, David brokers partnerships in the area of ICT for development.

David concurrently serves as a consultant for Microsoft Partners in Learning, having led policy dialogues and architected solutions with Ministries of Education across Africa, Asia, and the Americas. He has spoken at numerous global events at the request of organizations including USAID, IDB, World Vision, British Council, and Gates Foundation.

David left a career at Microsoft in 2010 to launch GreenBridge. Mr. Yunger previously served as Senior Product Manager at Microsoft, launching Windows MultiPoint Server. Prior to Microsoft, he served Pearson as Director of IT Business Development, helping the company become the global leader in professional certification.

David holds an MBA from Seattle University, a BS from the University of Wisconsin, and resides in Seattle, WA, with his wife and three sons.

Page 8: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

The World at Night

South America: 400M

US/Canada: 350M

Africa: 1 Billion

Asia: 4 Billion

Europe: 900M

Page 9: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

What we hear from training centers:

1. “We need to do more with less.”2. “We spend too much time managing

technology.”3. “We explored thin clients, but were frustrated

because:

a) Performance is poor (particularly multi-media);

b) We need a unique IP address for exams;c) They are too expensive (often more than

PCs).”

Page 10: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

The GreenBridge Computing Mission

• Our mission is to provide the highest quality digital access at a fraction of the cost.

• We help schools cut costs while expanding technology access and enabling 21st century skills development.

• We provide unsurpassed performance and the lowest cost because we eliminate the need for thin clients.

Page 11: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Value Proposition

Opportunity: Turn a singe PC into 10+ workstations. Each user has their own monitor, mouse, and keyboard, each with an independent Windows computing experience – at a fraction of the cost

Benefits: • 50% hardware savings• 90% IT maintenance savings• 80% energy savings

HOST COMPUTE

R

Problem: training centers struggle to refresh & manage technology

Page 12: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

>>

Case Study: Bellevue School District, Bellevue, WA

“..we saved $70,000 on hardware by purchasing Multipoint Servers instead of individual desktops. We saved $60,000 on network switches…and we saved about $5,000 on networking cabling.”

Jason GolecManager of Network Operations, Bellevue School District

$135K hardwa

re savings

Page 13: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Case Study: Haiti

“[This solution] will likely save us hundreds of thousands of dollars in energy costs.”

Page 14: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Solution / Value

PCs Thin Clients Zero Clients

GreenBridge (direct virtualization)

Performance

Maintenance

Cost

Market Continuum TodayI want to sell thin clients.

Why would I want to turn 1 PC into 10? Market

void: purpose-

built solution

Page 15: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

“It’s not linear”

Price / Performance Optimization

Cost

per

work

sta

tion

# Workstations per host computer

Individual PCs

Sweet spot: 8-12 workstatio

ns

20+ workstations: dual socket, 4 core

multi-threaded computer (e.g.

Xeon)

4-6 workstatio

ns

Page 16: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

The GreenBridge SolutionGreenBridge Corei7 server

GreenBridge ZIP-Clients

Customizable (up to 15 stations)

Windows MultiPoint Server 2011 & Office 2010 preinstalled, Windows 7 user experience

Full warranty and support

Learning tools preinstalled: Classroom Management software, Microsoft Digital Literacy Suite, Microsoft Math

COST: ~$250 per workstation

Monitors optional. Software is preinstalled but not activated; license keys available for purchase.

“Multi-media / Premium Package”

Page 17: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

5 SEAT WINDOWS MULTIPOINT SERVER SOLUTION WITH THIN CLIENTS

One Refurbished Core 2 Duo desktop with 120 GB Hard Drive and 8

GB RAM

4 New NComputing L300 Thin Clients

5 New USB keyboards(English, Spanish or French)

5 New optical mice

5 Refurbished 17” LCD Monitors

One New 16-Port 10/100Mbps Desktop

Network Switch$999 USD

“Basic Use Package”

Page 18: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

10 x PCs + 10 Monitors10 x PCs + 10 Monitors

Samplecustomer data:

Conventional PCs199W $965

199W $965

199W $965

199W $965

199W $965

199W $965

199W $965

199W $965

199W $965

199W $965

Total Power: 2,000WTotal HW Cost: ~$10,000

220W$2100

Samplecustomer data:

GreenBridge equivalent

20W$150

20W$150

20W$150

20W$150

20W$150

20W$150

20W$150

20W$150

20W$150

Total HW Cost: <$3,900Total Power: 400W

1 x PCs + 10 Monitors1 x PCs + 10 Monitors

Page 19: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

User 1 User 2

Peer-to-Peer Mentoring

Page 20: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Microsoft digital literacy curriculumMicrosoft Math 4.0Worldwide TelescopeKhan AcademyPhotosynth

Custom Content

Page 21: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Microsoft Endorsement

“David’s deep understanding of market needs, extensive relationships… and passion for delighting our customers resulted in a number of key customer wins.

…David and GreenBridge will have our full support…and are addressing a vastly underserved market.”

Chris PhillipsGeneral Manager, Windows ServerMicrosoft Corporation

Page 22: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

“Ever since I was young, I dreamed of becoming a doctor… this lab will help me with my research… not only to see my studies in a book, but live them on the Internet. I really hope this is not only a dream, but that I can make it happen in real life.”

-Fabiola, grade 12, Leogane, Haiti

Page 23: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

The GreenBridge Difference

CUSTOMER FOCUSBreathtaking service.

PRODUCTUnparalleled performance.

EXPERTISEDeep relationships with MSFT engineering team.

VALUEAll your

computing needs.

Half the cost.

Page 24: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

1. Contact us for a free TCO Analysis.2. Special offer: 60-day risk-free evaluation in

your center.

Next steps

ContactPaul Scoville, Business Development Director:

[email protected]

David Yunger, CEO: [email protected]

www.greenbridgecomputing.com

Page 25: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Q&A

Thank you!

Page 26: Solutions to Lower Telecentre's Hardware Cost: GreenBridge Computing

Don’t forget the survey!https://www.surveymonkey.com/s/BridgeGreen

Thank you!