Upload
manuel-cabello-de-alba
View
181
Download
0
Tags:
Embed Size (px)
Citation preview
Manuel Cabello de [email protected]
MEng, PEng, European Engineer (EUR-ING)
Solar Energy&Urban PlanningRenewables EnergiesCivil EngineeringThermal EngineeringEnvironment EngineeringConstructionStructural EngineeringProcess EngineeringFood Factories Engineering DesignHydraulic EngineeringPlants Engineering
537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT TERRACES. GIBRALTAR (UK). BUILDING CONTRACT.
Budget: $83MPosition: Construction Manager/Technical Manager
The scheme comprises of 537 apartments in 10 blocks, varyingin height from 4 to 9 storey’s.Car parking for 550 cars, roads,infrastructure services, podiums and landscaped areas are also to be provided for the use of the residents, along with the supporting ancillary accommodation in the form of meter rooms,waste collection areas, generators, substations, transformers, etc.
537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT TERRACES. GIBRALTAR (UK). BUILDING CONTRACT.
Budget: $83MPosition: Construction Manager/Technical Manager
492 DWELLINGS. NEW RENTAL HOUSES. MID HARBOUR. GIBRALTAR (UK). DESING&BUILDING CONTRACT.
Budget: $100MPosition: Design Manager
The scheme comprises of 492 apartments in 6 blocks, varying inheight from 6 to 8 storey’s.Car parking for 500 cars, roads,infrastructure services, electrical distribution center, podiums and landscaped areas are also to be provided for the use of the residents, along with the supporting ancillary accommodation inthe form of meter rooms, waste collection areas, generators,substations, transformers, etc
GIBRALTAR AIRPORT TUNNEL AND FRONTIER ACCESS ROAD. 2011-2012
Budget: $80MPosition: Technical Manager
The contract include the construction of a tunnel below sea level for traffic and another for pedestrians under the airport runway, and a road between the frontier and Eastern Beach. The aim of the investment is to address the problem of traffic decongestion at the airport when aircraft land or take off.The contract includes design and construction of the following: (1) a dual carriage way (four lanes) from the commercial gate at the frontier to the junction of Eastern Beach Road and Devil’s Tower Road (via Eastern Beach). (2) A tunnel under the eastern end of the runway consisting of four traffic lanes and a separate tunnel for pedestrians and a cycle path including dewatering and treatment water plant. There will also be a tunnel control centre. (3) An aviation fuel storage tanks farm buried underground on the north side of the runway. (4) An offshore structure (around 100 metres off the eastern end of the runway) to provide aircraft approach lighting required by modern aviation practices and procedures.