A Quick Look at Simio
Decision Science Forum
A Quick Look at Simio
C. Dennis Pegden
November 8, 2011 1
Hosted by:
Simio
A Quick Look at Simio
Outline
• Key features
• Building a simple model
• Risk-based Planning and Scheduling
November 8, 2011 2
Hosted by:
Simio
A Quick Look at Simio
Key Features
• Native 3D environment
• Rapid object-based modeling
• Advanced experimentation
• Risk-based Planning and Scheduling
November 8, 2011 3
Hosted by:
Simio
A Quick Look at Simio
A Quick Example
November 8, 2011 4
Arrive Server 1 Server 2 Depart
Hosted by:
Simio
A Quick Look at Simio
Why Traditional APS Falls Short
• Based on deterministic times and no unplanned events - leads to optimistic plans/schedules that cannot be achieved in practice – goes from feasible to infeasible over time
• Decision makers have no basis for judging the risk associated with a plan/schedule.
• Accurately predicting delivery dates with a high level of confidence is difficult if not unattainable
Hosted by:
Simio
A Quick Look at Simio
Deterministic Plan/Schedule
Transaction T | | | |
M | | | |
W | | | | < >
Drill Paint Weld
Weld Shape Drill Cut
Order-01
Order-02
Shape
Order-03
Drill Cut Order-04 Shape
Cut Order-05
Paint
How can I ensure this ships on time
with probability > .9
Schedule turns infeasible over time .... Breakdowns – Late Material – Staffing …
Hosted by:
Simio
A Quick Look at Simio
Simio RPS (Patent Pending)
• RPS is the dual use of a simulation model to generate both a realistic and detailed plan and an assessment of the risk associated with that plan.
• Simio adds variation to processing times and incorporates unplanned events and automatically replicates the model (across processors) to generate risk measures. – Probability of meeting target.
– Expected completion time.
Hosted by:
Simio
A Quick Look at Simio
Adding Risk to Plans
Transaction
Tue | | | |
Mon | | | |
Wed | | | | < >
Drill Paint Weld
Weld Shape Drill Cut
Order-01
Order-02
Shape
Order-03
Drill Cut Order-04 Shape
Cut Order-05
Paint
72%
91%
47%
12%
92%
This order has slack in the plan but has high risk of being
late.
Hosted by:
Simio
A Quick Look at Simio
Simple RPS Example
• Four workstations.
• Sequence dependent changeovers.
• Manufacturing data downloaded from ERP.
–Orders
–Routings
–Materials (Purchased, BOM).
November 8, 2011 9
Hosted by:
Simio
A Quick Look at Simio
Key Advantages
• Risk analysis to assess the quality of the deterministic schedule.
• Flexible modeling environment to accurately capture the facility constraints.
• Single model for design and operation.
• 3D animation of schedule generation.
Hosted by:
Simio
A Quick Look at Simio
New 2011 Features
• Process Window Enhancements
• Financials
• 64 bit support
• Multiple processor support
• Resource specific exceptions
• Object/Element referencing
• Reference –based functions
• Importing table schemas from repeat groups
• List creation from right click
• Copy new type
• Facility graphics in external view
• Tally statistics in Basic and Transfer Node
• Improved Excel import
• Enhanced Arrival Tables
• Entity turnaround method
• New Schedule Interface
• Population functions
• Enhanced Trace
• Sky animation
• Processing time based failures
• Arrival deviations
• New run functions
• Conveyor speedups
• New add-on processes
• Warning framework and Warning Step
• New Move step
• Replication control in experiment
• Output enhancements
• Disable randomness
• Fast forward 6x faster
• Conveyor cell enhancements
• Auto-scrolling
• Enhanced save in Evaluation mode
• Parking enhancements
• Trace enhancements
• Status plot enhancements
• SPFX file support
• SimBit search capability
Hosted by:
Simio
A Quick Look at Simio
Future Features
• Mass flow
–Transfer volume at some rate.
• Kinematics
– Rotation/translation of components
November 8, 2011 12
Hosted by:
Simio
A Quick Look at Simio
Summary
• Simio is a powerful object-based 3D modeling environment.
• Simio is being enhanced on a continuous basis.
• Simio is designed to support traditional design applications as well as Risk-based Planning and Scheduling of day-to-day operations.
November 8, 2011 13
Hosted by:
Simio
A Quick Look at Simio
Demonstration
• For a demonstration of the software please contact
Systems Navigator at [email protected]
November 8, 2011 14