13
Wim Post / SESAR JOINT UNDERTAKING Head of Programme Management 1 SESAR SWIM MASTER CLASS 2014 BEST-IN-CLASS EVENT

SESAR SWIM Master Class Best in class 2014 welcome

Embed Size (px)

Citation preview

Page 1: SESAR SWIM Master Class Best in class 2014 welcome

Wim Post / SESAR JOINT UNDERTAKING Head of Programme Management

1

SESAR SWIM MASTER CLASS 2014 BEST-IN-CLASS EVENT

Page 2: SESAR SWIM Master Class Best in class 2014 welcome

Agenda 11 December 2014

2

Page 3: SESAR SWIM Master Class Best in class 2014 welcome

OPERATIONAL REQUIREMENTS SYSTEM PROTOTYPES VALIDATION ACTIVITIES & RESULTS

PERFORMANCE VALIDATION TARGETS CONCEPT & ARCHITECTURE OPERATIONAL & TECHNOLOGY SOLUTIONS CASES STANDARDISATION & REGULATION PREP.

PERFORMANCE NEEDS OPERATIONAL IMPROVEMENTS & ENABLERS HIGH LEVEL DEPLOYMENT & DEVELOPMENT TIMELINE

R&

D P

RO

JEC

TS

MAS

TER

PLA

N

PRO

GR

AMM

E SESAR DEVELOPMENT

4D TRAJECTORY

TRAFFIC SYNCHRONISATION

AIRPORT INTEGRATION

NETWORK MANAGEMENT

CONFLICT MGT. & AUTOMATION

SWIM

Page 4: SESAR SWIM Master Class Best in class 2014 welcome

SWIM Definition

4

SWIM

standards

infrastructure

Governance

ATM Information

Qualified parties

Services

SESAR SWIM DEFINITION : Ref : SESAR SWIM CONOPS, adopted in ICAO SWIM Concept material

Page 5: SESAR SWIM Master Class Best in class 2014 welcome

0

2

4

6

8

10

SWIM

standards

infrastructure

Governance

ATM Information

Qualified parties

Services

SESAR SWIM Progress since 2012

Page 6: SESAR SWIM Master Class Best in class 2014 welcome

4 7

5

7

2

6

0

2

4

6

8

10standards

infrastructure

Governance

ATM Information

Qualified parties

Services

SESAR SWIM Progress since 2012

2012

2013 2014

Page 7: SESAR SWIM Master Class Best in class 2014 welcome

4 7

5

7

2

6

0

2

4

6

8

10standards

infrastructure

Governance

ATM Information

Qualified parties

Services

SESAR SWIM outreach

SESAR SWIM outreach Communicating SWIM developments to

ATM stakeholders in- and outside the programme

2011 SWIM demonstration

2012 SESAR SWIM Master Class

2012 SWIM demonstration

2013 SWIM demonstration at WAC

2013 SESAR SWIM Master Class

2014 SWIM demonstration

2014 SESAR Master Class

2015 SESAR Master Class

2016 SWIM Global Demonstration

Page 8: SESAR SWIM Master Class Best in class 2014 welcome

Master Class Objectives and Expectations

8

Engaging the state of the art competences; kick-starting the SWIM evolution.

Further developing and demonstrating the added value of state-of-the-art information technology for air traffic management.

Broadening the understanding of SWIM and the development of SWIM services and SWIM enabled ATM applications.

The creation of a SWIM Community of Interest (COI)

Facilitate first evaluation of SWIM compliance framework, governance and Registry.

Page 9: SESAR SWIM Master Class Best in class 2014 welcome

SESAR SWIM OUTREACH WINS JANE’S ATC AWARD

9

Page 10: SESAR SWIM Master Class Best in class 2014 welcome

Master Class 2014 : main milestones

10

Send back signed

Agreements

Candidates Submitted material

31/10

Assessment by Jury: Shortlist

14/11

Best In Class Event

11/12

Initiation Day

24/06

Live Demonstration

to Jury

20/11

81 General Agreements signed (last year 55)

39 proposals

12 Finalists

… Award Winners

Page 11: SESAR SWIM Master Class Best in class 2014 welcome

Master Class Jury

• SJU (Chairman): Wim Post • WP08: Peder Blomqvist • WP14: Xavier Jourdain • PB.04.03: Marc Brochard • AU: Urban Weisshaar • A6 (ANSPs): Tony Vaudrey • NM: Jean François Rousseaux

• Declaration of confidentiality and conflict of interest • No proposals accepted from organisations they work

for

11

Page 12: SESAR SWIM Master Class Best in class 2014 welcome

TECHNOLOGY SWIM design and technology contribution

Reusability What is the degree of openness and reusability of the proposed solution? Is the solution really open or linked to non-cots techno?

Interoperability

What is the degree to which the proposed solution can exchange information and use information that has been exchanged? Interoperability at # levels : 1.semantic level (e.g. ISRM / AIRM ) 2.syntactical level ( AIXM / FIXM / WXXM ) 3.technical level ( SWIM TI )

Technology maturity What is the technology readiness? Is that mainstream IT Techno (massive or niche deployment)?

Master Class Assessment Framework

12

BUSINESS ATM Business contribution

Relevance Is there a good motivation for making this development ? Does the problem identified correspond to a real and pregnant ATM problem? Or is it more a business opportunity?

Adequacy Does the solution achieve the goal as defined by the motivation? How does the solution proposed respond to the identified ATM problem? Does the proposed solution bring real benefits to the ATM?

Time to market How quick the proposed solution can be implemented and deployed in ATM?

Page 13: SESAR SWIM Master Class Best in class 2014 welcome

Presented by Marc Brochard

NEXT: OVERVIEW OF SUBMISSIONS

13