Presentation to UC Davis about BIM implementation on all projects large and small to reduce the risk of construction.
Citation preview
THE DESIGN PARTNERSHIP REDUCING RISK WITH BIM
Fo r UC Dav i s Des ign & Cons t ruc t i on ManagementOc tober 4 2011
WHO WE ARE
About The Design Partnership
•Founded in 1979•45 Employees•Expertise in Science & Technology, Education, Healthcare, Public, Master Planning•BIM/Lean / IPD Leadership•Over $1 Billion Designed in BIM•Using BIM since 2005; 100% BIM since 2006•2008 AIASF Integrated Practice Honor Award Recipient
REDUCING RISK WITH BIM1 What is Risk?2 Technology Introduction3 Construction Technology4 Case Study: VA Puget Sound5 Case Study: Stanford Cath Labs6 Case Study: Robbins Hall Renovation
The Design Partnership LLP Architects + Planners
WHAT IS RISK?
• Altering “Risk = Cost” Equation
• Increase in Architect’s Exposure
• Decrease in Contractor’s Risk• Decrease in Owner’s Risk• Reduced Risk for All =
Reduced Cost
The Design Partnership LLP Architects + Planners
Unknown Consequences Of Sharing BIM Information
Design Only Information In BIM ModelExtensive Pre-coordinationFabrication From Design Models
Increased Exposure to Risk
Increase in Architect’s Exposure
The Design Partnership LLP Architects + Planners
Reduced Coordination Errors Reduced Unknown Conditions More Efficient Workflow Cooperation & Collaboration Reduced Contingency
Increased Confidence & Reduced Risk
Decrease in Contractor’s Risk
The Design Partnership LLP Architects + Planners
Decrease in Owner’s Risk
Reduced Bidding Costs Due To Reduced Contractor Risks
Reduced Risk Of – Change Orders From Unknown
Conditions– Coordination Changes– Fighting Among AEC Entities
Reduced User Changes Due To Better Pre-visualization And Planning
The Design Partnership LLP Architects + Planners
Reduced Risk for All = Reduced Cost
Architect’s Exposure However
Architect’s Risk
The Design Partnership LLP Architects + Planners
TECHNOLOGY INTRODUCTION
• Building Information Modeling (BIM)
• Virtual Simulation / Pre-visualization
• 3D Laser Survey• Clash Detection &
Coordination
The Design Partnership LLP Architects + Planners
The Big BIM/IPD/Lean Idea
The Design Partnership LLP Architects + Planners
Automatic Document Coordination
3D Systems Coordination
Virtual Building Simulation
Direct Fabrication
Project Delivery Improvement
The Design Partnership LLP Architects + Planners
Building Information Modeling (BIM)
BIM is a 3D Database
The Design Partnership LLP Architects + Planners
Design Visualization
The Design Partnership LLP Architects + Planners
Design Visualization
The Design Partnership LLP Architects + Planners
Virtual Equipment Simulation
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
3D Laser Survey
The Design Partnership LLP Architects + Planners
Clash Detection & Coordination
Where is the coordination error?
Structural Plan
Mechanical Plan
The Design Partnership LLP Architects + Planners
Clash Detection & Coordination
The Design Partnership LLP Architects + Planners
CONSTRUCTION TECHNOLOGY
• Direct Fabrication• Prefabrication• Capabilities
The Design Partnership LLP Architects + Planners Images courtesy of Marelich Mechanical
Direct Fabrication
The Design Partnership LLP Architects + Planners
Direct Fabrication
The Design Partnership LLP Architects + Planners
Prefabrication
The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
3D Capable Trades• HVAC• Plumbing• Structural Steel• Precast Concrete• Rebar• Steel Stud Walls• Curtain Walls, etc.• Millwork• Unit Restrooms• Laboratories
The Design Partnership LLP Architects + Planners
Relative Sophistication DisparityGeneral Contractors (Very Low to Low)Engineers (Very Low to Moderate) Architects (Low to Moderate) Subcontractors (Varies, some extremely high)
Maximize advantage of sophisticated players Enhance process for Subs already using 3D Mentor less advanced members Integrated Project Delivery
The Design Partnership LLP Architects + Planners
CASE STUDY: VA PUGET SOUND
• Design of VA Puget Sound Mental Health & Research Project
VA PUGET SOUND CAMPUS PROJECTCampus expansion of four distinct projects that are linked to Mental Health Treatment and Research. Associate Architect
Mental Health & Research Bldg. $104M 200,000 gsfExisting Hospital Seismic Upgrade $28M 162,000 gsfParking Structure (1000 stalls) $37M 400,000 gsfSite Work $8M 367,000 gsfTotal $177M 1,129,000 gsf
VA PUGET SOUND CAMPUS PROJECTSite Plan
A Mental Health & Research Bldg.B Existing Hospital Seismic UpgradeC Parking StructureD Site Work
A B
C
D
Exterior Renderings
VA PUGET SOUND CAMPUS PROJECTMental Health & Research Building
STRUCTURAL
BUILDING SYSTEMS
MECHANICAL
BUILDING SYSTEMS
MECHANICAL
BUILDING SYSTEMS
ELECTRICAL
BUILDING SYSTEMS
TELECOM
BUILDING SYSTEMS
LABORATORY
BUILDING SYSTEMS
The Design Partnership LLP Architects + Planners
CASE STUDY: STANFORD CATH LABS
• Comparison of Cath Labs 7, 9, & 10
7
Cath Lab 7: Siemens Biplane Cath LabConstruction Start: 2006
BIM Use: CAD Only
7
7
9
Cath Lab 9: Siemens Biplane Hybrid ORConstruction Start: 2009
BIM Use: Laser Scanning & Modeling to 2”
9
3D Laser Scanning
The Design Partnership LLP Architects + Planners
Existing Conditions Model to 2”
The Design Partnership LLP Architects + Planners
New Work Model to 2”
The Design Partnership LLP Architects + Planners
Construct
The Design Partnership LLP Architects + Planners
7
9
10
Cath Lab 10: Siemens Biplane Pediatric Cath LabConstruction Start: 20010
BIM Use: Laser Scanning & Modeling Everything
10
Model Everything
The Design Partnership LLP Architects + Planners
BIM Use $/SF % from CAD
Cath Lab 7 CAD 2,153 $/SFCath Lab 9 2” Standard 1,829 $/SF -15.0%Cath Lab 10 Everything 2,065 $/SF -4.1%
Construction Cost
Change Order Cost
*All figures in 2010 Relative Value
BIM Use $/SF % of Total
Cath Lab 7 CAD 267 $/SF 12.4%
Cath Lab 9 2” Standard 148 $/SF 8.1%
Cath Lab 10 Everything 16 $/SF <0.1%
The Design Partnership LLP Architects + Planners
*All figures in 2010 Relative Value
BIM Use Unit Cost
Cath Lab 7 CAD Only 2,153 $/SFCath Lab 9 2” Standard 1,613 $/SFCath Lab 10 Everything 2,065 $/SF
BIM Use Change Rate
Cath Lab 7 CAD Only 12.4%Cath Lab 9 2” Standard 7.8%Cath Lab 10 Everything <0.1%
Construction Cost
Change Order Cost
*All figures in 2010 Relative Value
The Design Partnership LLP Architects + Planners
ROBBINS HALL RENOVATION
• BIM Use on UC Davis Robbins Hall Phase 1 Renovation
- (E) and (N) Casework Database- Equipment Documentation- Arch/Mech Coordination
First Floor Plan - PROJECT PROGRAM
The Design Partnership LLP Architects + Planners
Casework Documentation
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
Casework Documentation
The Design Partnership LLP Architects + Planners
Casework Documentation
First Floor - EQUIPMENT PLAN
JORGE DUBCOVSKY
JAN DVORAK
ABHAYA DANDEKAR
DAVID NEALE
JEFFREY IBARRA
PAM RONALD
GENERAL EQUIPMENT
The Design Partnership LLP Architects + Planners
First Floor - EQUIPMENT AXONOMETRIC
JORGE DUBCOVSKY
JAN DVORAK
ABHAYA DANDEKAR
DAVID NEALE
JEFFREY IBARRA
PAM RONALD
GENERAL EQUIPMENT
The Design Partnership LLP Architects + Planners
Construction Cost
Change Order Summary
The Design Partnership LLP Architects + Planners
$ %
Change Orders $812,438 11.60%Final Construction Cost $7,004,281
$ %
User Additions $230,954 3.30%Engineering & Operations $191,182 2.73%Infrastructure Improvements $183,337 2.62%Unforeseen Field Conditions $122,938 1.76%A/E Coordination $84,027 1.20%
THE DESIGN PARTNERSHIP
A R C H I T E C T S + P L A N N E R Swww.dpsf.com
Thanks!Questions?
Find the slides from this presentation on SlideShare.
Search for us by name: TheDesignPartnership
Or by our public profile: http://www.slideshare.net/TheDesignPartnership