68
E DESIGN PARTNERSHIP REDUCING RISK WITH B UC Davis Design & Construction Management ober 4 2011

Reducing Risk with BIM

Embed Size (px)

DESCRIPTION

Presentation to UC Davis about BIM implementation on all projects large and small to reduce the risk of construction.

Citation preview

Page 1: Reducing Risk with BIM

THE DESIGN PARTNERSHIP REDUCING RISK WITH BIM

Fo r UC Dav i s Des ign & Cons t ruc t i on ManagementOc tober 4 2011

Page 2: Reducing Risk with BIM

WHO WE ARE

About The Design Partnership

•Founded in 1979•45 Employees•Expertise in Science & Technology, Education, Healthcare, Public, Master Planning•BIM/Lean / IPD Leadership•Over $1 Billion Designed in BIM•Using BIM since 2005; 100% BIM since 2006•2008 AIASF Integrated Practice Honor Award Recipient

Page 3: Reducing Risk with BIM

REDUCING RISK WITH BIM1 What is Risk?2 Technology Introduction3 Construction Technology4 Case Study: VA Puget Sound5 Case Study: Stanford Cath Labs6 Case Study: Robbins Hall Renovation

Page 4: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

WHAT IS RISK?

• Altering “Risk = Cost” Equation

• Increase in Architect’s Exposure

• Decrease in Contractor’s Risk• Decrease in Owner’s Risk• Reduced Risk for All =

Reduced Cost

Page 5: Reducing Risk with BIM
Page 6: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Unknown Consequences Of Sharing BIM Information

Design Only Information In BIM ModelExtensive Pre-coordinationFabrication From Design Models

Increased Exposure to Risk

Increase in Architect’s Exposure

Page 7: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Reduced Coordination Errors Reduced Unknown Conditions More Efficient Workflow Cooperation & Collaboration Reduced Contingency

Increased Confidence & Reduced Risk

Decrease in Contractor’s Risk

Page 8: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Decrease in Owner’s Risk

Reduced Bidding Costs Due To Reduced Contractor Risks

Reduced Risk Of – Change Orders From Unknown

Conditions– Coordination Changes– Fighting Among AEC Entities

Reduced User Changes Due To Better Pre-visualization And Planning

Page 9: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Reduced Risk for All = Reduced Cost

Architect’s Exposure However

Architect’s Risk

Page 10: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

TECHNOLOGY INTRODUCTION

• Building Information Modeling (BIM)

• Virtual Simulation / Pre-visualization

• 3D Laser Survey• Clash Detection &

Coordination

Page 11: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

The Big BIM/IPD/Lean Idea

Page 12: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Automatic Document Coordination

3D Systems Coordination

Virtual Building Simulation

Direct Fabrication

Project Delivery Improvement

Page 13: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Building Information Modeling (BIM)

Page 14: Reducing Risk with BIM

BIM is a 3D Database

The Design Partnership LLP Architects + Planners

Page 15: Reducing Risk with BIM

Design Visualization

The Design Partnership LLP Architects + Planners

Page 16: Reducing Risk with BIM

Design Visualization

The Design Partnership LLP Architects + Planners

Page 17: Reducing Risk with BIM

Virtual Equipment Simulation

The Design Partnership LLP Architects + Planners

Page 18: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Page 19: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

3D Laser Survey

Page 20: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Clash Detection & Coordination

Where is the coordination error?

Structural Plan

Mechanical Plan

Page 21: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Clash Detection & Coordination

Page 22: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

CONSTRUCTION TECHNOLOGY

• Direct Fabrication• Prefabrication• Capabilities

Page 23: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners Images courtesy of Marelich Mechanical

Direct Fabrication

Page 24: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Direct Fabrication

Page 25: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Prefabrication

Page 26: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical

Page 27: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Page 28: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical

Page 29: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Page 30: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

3D Capable Trades• HVAC• Plumbing• Structural Steel• Precast Concrete• Rebar• Steel Stud Walls• Curtain Walls, etc.• Millwork• Unit Restrooms• Laboratories

Page 31: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Relative Sophistication DisparityGeneral Contractors (Very Low to Low)Engineers (Very Low to Moderate) Architects (Low to Moderate) Subcontractors (Varies, some extremely high)

Maximize advantage of sophisticated players Enhance process for Subs already using 3D Mentor less advanced members Integrated Project Delivery

Page 32: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

CASE STUDY: VA PUGET SOUND

• Design of VA Puget Sound Mental Health & Research Project

Page 33: Reducing Risk with BIM

VA PUGET SOUND CAMPUS PROJECTCampus expansion of four distinct projects that are linked to Mental Health Treatment and Research. Associate Architect

Mental Health & Research Bldg. $104M 200,000 gsfExisting Hospital Seismic Upgrade $28M 162,000 gsfParking Structure (1000 stalls) $37M 400,000 gsfSite Work $8M 367,000 gsfTotal $177M 1,129,000 gsf

Page 34: Reducing Risk with BIM

VA PUGET SOUND CAMPUS PROJECTSite Plan

A Mental Health & Research Bldg.B Existing Hospital Seismic UpgradeC Parking StructureD Site Work

A B

C

D

Page 35: Reducing Risk with BIM

Exterior Renderings

VA PUGET SOUND CAMPUS PROJECTMental Health & Research Building

Page 36: Reducing Risk with BIM

STRUCTURAL

BUILDING SYSTEMS

Page 37: Reducing Risk with BIM

MECHANICAL

BUILDING SYSTEMS

Page 38: Reducing Risk with BIM

MECHANICAL

BUILDING SYSTEMS

Page 39: Reducing Risk with BIM

ELECTRICAL

BUILDING SYSTEMS

Page 40: Reducing Risk with BIM

TELECOM

BUILDING SYSTEMS

Page 41: Reducing Risk with BIM

LABORATORY

BUILDING SYSTEMS

Page 42: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

CASE STUDY: STANFORD CATH LABS

• Comparison of Cath Labs 7, 9, & 10

Page 43: Reducing Risk with BIM
Page 44: Reducing Risk with BIM

7

Page 45: Reducing Risk with BIM

Cath Lab 7: Siemens Biplane Cath LabConstruction Start: 2006

BIM Use: CAD Only

7

Page 46: Reducing Risk with BIM

7

9

Page 47: Reducing Risk with BIM

Cath Lab 9: Siemens Biplane Hybrid ORConstruction Start: 2009

BIM Use: Laser Scanning & Modeling to 2”

9

Page 48: Reducing Risk with BIM

3D Laser Scanning

The Design Partnership LLP Architects + Planners

Page 49: Reducing Risk with BIM

Existing Conditions Model to 2”

The Design Partnership LLP Architects + Planners

Page 50: Reducing Risk with BIM

New Work Model to 2”

The Design Partnership LLP Architects + Planners

Page 51: Reducing Risk with BIM

Construct

The Design Partnership LLP Architects + Planners

Page 52: Reducing Risk with BIM

7

9

10

Page 53: Reducing Risk with BIM

Cath Lab 10: Siemens Biplane Pediatric Cath LabConstruction Start: 20010

BIM Use: Laser Scanning & Modeling Everything

10

Page 54: Reducing Risk with BIM

Model Everything

The Design Partnership LLP Architects + Planners

Page 55: Reducing Risk with BIM

BIM Use $/SF % from CAD

Cath Lab 7 CAD 2,153 $/SFCath Lab 9 2” Standard 1,829 $/SF -15.0%Cath Lab 10 Everything 2,065 $/SF -4.1%

Construction Cost

Change Order Cost

*All figures in 2010 Relative Value

BIM Use $/SF % of Total

Cath Lab 7 CAD 267 $/SF 12.4%

Cath Lab 9 2” Standard 148 $/SF 8.1%

Cath Lab 10 Everything 16 $/SF <0.1%

The Design Partnership LLP Architects + Planners

*All figures in 2010 Relative Value

Page 56: Reducing Risk with BIM

BIM Use Unit Cost

Cath Lab 7 CAD Only 2,153 $/SFCath Lab 9 2” Standard 1,613 $/SFCath Lab 10 Everything 2,065 $/SF

BIM Use Change Rate

Cath Lab 7 CAD Only 12.4%Cath Lab 9 2” Standard 7.8%Cath Lab 10 Everything <0.1%

Construction Cost

Change Order Cost

*All figures in 2010 Relative Value

Page 57: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

ROBBINS HALL RENOVATION

• BIM Use on UC Davis Robbins Hall Phase 1 Renovation

- (E) and (N) Casework Database- Equipment Documentation- Arch/Mech Coordination

Page 58: Reducing Risk with BIM
Page 59: Reducing Risk with BIM

First Floor Plan - PROJECT PROGRAM

The Design Partnership LLP Architects + Planners

Page 60: Reducing Risk with BIM
Page 61: Reducing Risk with BIM

Casework Documentation

The Design Partnership LLP Architects + Planners

Page 62: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Casework Documentation

Page 63: Reducing Risk with BIM

The Design Partnership LLP Architects + Planners

Casework Documentation

Page 64: Reducing Risk with BIM
Page 65: Reducing Risk with BIM

First Floor - EQUIPMENT PLAN

JORGE DUBCOVSKY

JAN DVORAK

ABHAYA DANDEKAR

DAVID NEALE

JEFFREY IBARRA

PAM RONALD

GENERAL EQUIPMENT

The Design Partnership LLP Architects + Planners

Page 66: Reducing Risk with BIM

First Floor - EQUIPMENT AXONOMETRIC

JORGE DUBCOVSKY

JAN DVORAK

ABHAYA DANDEKAR

DAVID NEALE

JEFFREY IBARRA

PAM RONALD

GENERAL EQUIPMENT

The Design Partnership LLP Architects + Planners

Page 67: Reducing Risk with BIM

Construction Cost

Change Order Summary

The Design Partnership LLP Architects + Planners

$ %

Change Orders $812,438 11.60%Final Construction Cost $7,004,281

$ %

User Additions $230,954 3.30%Engineering & Operations $191,182 2.73%Infrastructure Improvements $183,337 2.62%Unforeseen Field Conditions $122,938 1.76%A/E Coordination $84,027 1.20%

Page 68: Reducing Risk with BIM

THE DESIGN PARTNERSHIP

A R C H I T E C T S + P L A N N E R Swww.dpsf.com

Thanks!Questions?

Find the slides from this presentation on SlideShare.

Search for us by name: TheDesignPartnership

Or by our public profile: http://www.slideshare.net/TheDesignPartnership