Maximize … Optimize … Protect …Realize the Value in modern Data Center Infrastructure
Christian SchillabMarketing Engineer / EMEA
Fluke [email protected]
© FlukeNetworks
Agenda
Driving forces to reduced uncertainty
The ‘6 Steps’ of the Right Fiber Certification Process
Opportunities and methods to maximize performance margins
© FlukeNetworks 2
3
Yesterdays fast is todays slow
Yesterdays incredible is todays expected
Yesterdays connector budget is todays link budget
Link budgets are tight because:
• “Zoned” Data Centers require 4 or more connections in a channel
• Manufacturers offer “Ultra Low Loss” components
• Customer seek a “Future Ready” infrastructure
© FlukeNetworks
Testing - “Zoned” Data Centers
After the installation only the links can be tested
The “Patched Channel” is configured by the network user
Total budget 10G: 2.6dB 40/100G 1.5-1.9dB
There is very little room for error !
Link Test #1 Link Test #2 Link Test #3
Channel
© FlukeNetworks 4
Tight budgest driving for reduced uncertainty
The Challenge The Answer
Tight Loss
Budgets
Littleroom for
measurement uncertainty
The ‘6 Steps’ of the Right Fiber
Certification Process
Fiber Testing Best Practices
x
BASIC Tests
Verify TRC
• Inspect & Clean
• Replaceo.k.?
yn
Set Reference
Pass
Fail
Trouble Shoot
LSPM: Loss Length Test
OTDR? y
n
Isolate Problem& Correct
• Inspect & Clean• Visible Light Source• Replace / Re-Terminate
EXTENDED Tests
EXT.Tests
>300 Tests?
yn
no
all orconditional
OTDR:• Connector Loss• Link Loss• Reflectance• Length
PassFail
Isolate Problem& Correct
Doc.Endf.
GradeEnd faces
Grade per IEC • Scratches• Dirt• Dust
PassFail
• Clean• Replace
no
all
Inspect & Clean
Inspect for• Dust• Dirt• Scratches
o.k.? yn
• Clean Dry• Clean Wet• Replace
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVE
Fiber Testing Best Practices
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVEInspect & Clean
BASIC Tests
Trouble Shoot
Doc.Endf.
GradeEnd faces
no
all
EXTENDED Tests
EXT.Tests
no
all orconditional
Standard Methods
TIA-568-C
Tier-1 Tier-2
ISO 11801 AMD.1 / ISO/IEC 14763-3
BASIC Test Regime EXTENDED Test Regime
Note: EXTENDED supplements BASIC test regime rather then replacing it
LSPM: Light Source & Power Meteror OLTS: Optical Loss Test System
OTDR: Optical Time Domain Reflectometer
Pro & Con
Truly measure the loss Most accurate Not suited for trouble shooting
Most effective for trouble shooting Identifies bottlenecks Less accurate loss “calulcation”
Standards for Fiber Optic Test Methods
© FlukeNetworks 9
BASIC Tests
Trouble Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Document… upload to
LinkWare LIVEInspect & Clean
6 Steps….1
23
4
3B
5
6Create ProjX… fetch from
LinkWare LIVE
BASIC Tests
Trouble Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Document… upload to
LinkWare LIVEInspect & Clean
ProjectDefinition
Project Definition
800+ Installers VOCs: Top eight problems (hours wasted)
Average amongst all respondents in the previous 30 days
Top eight problems: Wrong Configuration (Limit, IDs, Standard, …..)
Average amongst all respondents in the previous 30 days
Project Definition
New relaxed ISO limits do not reflect what is possible and/or needed to be future ready Custom Limits
Limits, Cable Types, Cable ID are best known by planner/project-manager
• Limits• Cables• Cable ID
BASIC Tests
Trouble Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Inspect&
Clean
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVE
Inspect & Clean
Dry clean will only remove dust and fresh skin oil
Inspection will tell whether…
– Wet cleaning is needed
– Wet cleaning was successful
– Abrasive dust could damage the mated plug
– Replacement is needed
BASICTests
Trouble Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Inspect & Clean
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVE
• TRC varication stored as part of project
• A TRC verification test should be run with regular intervals
Set Reference &TRC verification
© FlukeNetworks 20
Normative Requirement• ANSI/TIA-526-14-B • ISO 1180 ISO/IEC 14763-3 Ed.1 62• EN 50173 IEC IEC 61280-4-2
In the past …
…Expensive & Bulky
It is highly recommended by many manufacturers in particular when testing highest grade components for very demanding limits
Today …
… 1.) Less expensive 2.) Smaller then a mandrel
It helps to prevent1. FASLE FAILs
… Revenue at risk2. FALSE PASSes
… Reputation at risk
Never …
… does not work reliably
Encircled Flux
Marginal Compliant Link Marginal Failing Link
EF
MPD
Encircled Flux helps to preventFALSE PASSes and FALSE FAILs
“FALSE FAIL“…Revenue at
Risk
“FALSE PASS“…Application at
Risk
LIMITTRUE LOSS
Similar to SC/LC/ST/FX/…
• Non critical connection on the power meter (critical for 1 jumper method)
• EF compliance
Unique to MPO….
• Test all 12 fibers
• Identify polarity: “A”, “B”, “C”& “special”
• 1 jumper method & pinned or un-pinned links… solved with PanMPO™
Special MPO testing needs ?
BASIC Tests
Trouble-Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVEInspect & Clean
Trouble Shoot
OTDRs are not only for “Gurus”
EventMaps simplify the presentation
Overall (Link) limits complement component limits
Launch & Tail fibers are automatically excluded
BASIC Tests
Trouble Shoot EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Inspect & Clean
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVE
EXTENDED Test Regime
Why EXTENDED Testing ?
Identify, locate and eliminate unnecessary bottlenecks in otherwise compliant links
Further increase performance margin
Identify connectors with excessive reflectance
Document the state of the installation
Testing with a SMART Loop
> 9 out of 10 OTDR tests are performed incorrectly. The list of reasons is long– No Bi-Directional test and/or
averaging
– No tail fiber
– Incorrect handling of launch and tail fiber
– Adaption with hybrid cords
– etc.
A SMART Loop concepts forces the user to perform the test correctly
Multiple remote loops support operation by 1 technician
ACCELERATED EXTENDED Testingwith a SMART Loop
29
A built in experts verifies the integrity of the test setup
The testing time reduced by > 50%
Tail Fiber
Launch Fiber
Fiber A
Fiber B
Phase #1:End 1 End 2
Launch Fiber
Fiber A
Fiber B
Phase #2:
Testing with a SMART Loop
> 9 out of 10 OTDR tests are performed incorrectly. The list of reasons is long– No Bi-Directional test and/or
averaging
– No tail fiber
– Incorrect handling of launch and tail fiber
– Adaption with hybrid cords
– etc.
A SMART Loop concepts forces the user to perform the test correctly
Multiple remote loops support operation by 1 technician
BASIC Tests
Trouble Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd
Faces
no
all
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVEInspect & Clean
Inspection equipment
Without inspection equipment, you will never know if the connector is clean or not
Even with inspection equipment, thereare arguments as to what is acceptablefor a fiber connector
IEC 61300-3-35 defines levels ofacceptable scratches and debris on theend faces of fiber connectors
Automated field inspection is something to consider
Images can be stored and made part of the documentation
© FlukeNetworks 32
BASIC Tests
Trouble Shoot
EXTENDED Tests
EXT.Tests
no
all orconditional
Doc.Endf.
GradeEnd faces
no
all
Create ProjX… fetch from
LinkWare LIVEDocument
and/or
upload to Cloud
Inspect & Clean
Documentation
Fiber Testing Best Practices
x
BASIC Tests
Verify TRC
• Inspect & Clean
• Replaceo.k.?
yn
Set Reference
Pass
Fail
Trouble Shoot
LSPM: Loss Length Test
OTDR? y
n
Isolate Problem& Correct
• Inspect & Clean• Visible Light Source• Replace / Re-Terminate
EXTENDED Tests
EXT.Tests
>300 Tests?
yn
no
all orconditional
OTDR:• Connector Loss• Link Loss• Reflectance• Length
PassFail
Isolate Problem& Correct
Doc.Endf.
GradeEnd faces
Grade per IEC • Scratches• Dirt• Dust
PassFail
• Clean• Replace
no
all
Inspect & Clean
Inspect for• Dust• Dirt• Scratches
o.k.? yn
• Clean Dry• Clean Wet• Replace
Create ProjX… fetch from
LinkWare LIVE
Document… upload to
LinkWare LIVE
Qualified instruments and personnel paired with an efficient work flow ensures …
• “Next Generation Readiness” by maximizing performance margins
• ensures a profitable certification of fiber optic cabling systems
Conclusio
37© FlukeNetworks