1
Shell ONEgas Shutdown Management Process
Challenges of delivering shutdowns on Shell’s Southern
North Sea Assets
2
Contents:
The ONEgas Asset
Integrated Activity Planning
Shutdown Management
Process
Application (scaling)
Timing
Governance
Materials
Results
3
02 March 2012 3
What is ONEgas?
BRISTOW
BRISTOW
BRISTOW
ONEgas Facilities and PipelinesONEgas Facilities and Pipelines
EP200810214239001 December 2008
12"
12"
10"
12"
10"
10 "
10 "
6"
36"130 km
24"85 km
6.8"
10"
11"10"
16"/
2"
Please note that the situation as shown is not geographical correct !
L9-FF-1
AME-2
K15-FB-1
K15-FG-1
L13-FD-1
L13-FE-1
L13-FC-1
L10-A(Gaz de France)
L15-FA-1(Gaz de France - Suez)
L5-FA-1(Gaz de France - Suez)
F3-FB(Gaz de France - Suez)
M7(Cirrus)
Gas PlantDen Helder
K13-A(Wintershall)
K14-FA-1P/1C
K15-FC-1
K15-FK
K17-FA-1
K15-FA-1
K14-FB-1
Markham(CH4)
K5 -P(TotalFinaElf)
K7-FA-1K8-FA-3
K8-FA-1
K8-FA-1AP K8-FA-2
K12-BD(Gaz de France)
K7-FD-1
K7-FB
L13-FH
AME-1
N-7
AWG-1
Assen
L2-FA-1
F15(TotalFinaElf)
Q16
L9-FA-1
L9-FB-1
D15-FA-1(Gaz de France)
Sean Pipe
line
BBL line
Seal
Pip
elin
e
NOGAT P
ipelin
e
NGT Pipeline
A6 / B4 Pipeline
Tyra
Pip
elin
e
NGT Extension
WGT PipelineLocal Pipeline
Leman
Export to B
acton
Leman
Export toBacto
n
IndefatigableExport to Perenco Bacton
30"7.6km (mothballed)
30"
20"
5.4k
m
35.8k
m
20"36.5km
30"
107k
m
10"
2.5km
No 2 Sealine 30" (m
othballed)
57.8km
24"
8.1kmNo 1 Sealine 30" and 4"
55.7km
24" 0.7km4"(mothballed)
20"
3.0k
m
24"
8"2.1km
2.2km
14"
2.7km
20"4.7km
12/14" and 2" Glycol
12 km
12/1
4" a
nd2"
Gly
col
15.5
km
24" trunkline and 3" Glycol
73km
14"
16"
23 k
m
26"
20"
100
km
24"
107 km
36"178 km
36"159 km
12"1km1
34"
trunk
line
470
km
16"
3.3km
24"9.2km
20"3.7km
12"
16"/2
"
3.4km
20"4.7km
30" and 4" (4" mothballed)
3.5km
INDEFATIGABLE
BRIGANTINE
FIELD
AQ/AC/AT(Perenco)
SEAN FIELD
BT(Perenco)
Carrack West(2009)
PBBarque
PL Barque
PMClipperPT
Clipper PRClipper
PCClipper
PWClipper
Skiff
PNGalleon
PGGalleon
CarrackQA
Cutter QC
SOLE PIT
CLEAVER BANKHIGH
LEMAN 'B'COMPLEX
LEMAN FIELD
LEMAN 'C'COMPLEX
ShellBacton
LEMAN 'A'COMPLEX
D
JD
JP
PD
PP
RDSouth
K
North
N
Corvette
L
M
BR
CARAVEL
SHAMROCK
BG
BP
E
BDBH
AP
AD2
AK
AD1 BT
CDF
GCP
ONEgas – Asset name created as a result of combining the management of the UK Southern North Sea assets owned by Shell UK Exploration & Production & the Southern North Sea assets from NAM
(Offshore, NAM, Shell Expro, gas)
4
What is ONEgas 2011
7% %% %%% %%%%% UK
%%% 9% NL
%%%%%%%%%%
%90 %%%%%%%%% %%%%%%
%50 %%%%%%%%%
2 %%%%%%% %%%%%%
%90 B%% E%% R%%%%%%% %D%%
% U%%%%%
%50 B%% SFR
O%%% % A%%% %%950 %%%
C%%%% % E%%%% %%550 %%%
8 %%%%%%%%%%
%%%%%%%
15 %%%%% %%%%%%%%%
%12 B%% %%% %%%%% %%
NGL%
%75 %%% %%%%
% 550 S%%%% S%%%%
%500 C%%%%%%%%%%
2 %%%%%%%% %%%%
7 %%%%%%%%%%% %2009%
4 %% 5 %%%%%%%%%%% %2010%
%%%%% %% %%%%%
5
The ONEgas Assets
Footer: Title may be placed here or disclaimer if required. May sit up to two lines in depth.
90 Producing Fields, 54 Installations, 350 Wells, 1200+ km’s Pipelines