43
Porous Pavements in Cold Climates Porous Pavements in Cold Climates Part 1: Design, Installation, and Part 1: Design, Installation, and Maintenance Maintenance A Green Infrastructure, Green Jobs, and Green A Green Infrastructure, Green Jobs, and Green Funding Workshop Funding Workshop Onondaga Environmental Institute Onondaga Environmental Institute March 2011 March 2011 Robert Roseen, PE, PhD, D.WRE, Robert Roseen, PE, PhD, D.WRE, Thomas Ballestero, PE, PhD, PH, CGWP, PG, James Houle, CPSWQ Thomas Ballestero, PE, PhD, PH, CGWP, PG, James Houle, CPSWQ University of New Hampshire Stormwater Center University of New Hampshire Stormwater Center Department of Civil Engineering, University of New Hampshire Department of Civil Engineering, University of New Hampshire

Porous Pavement in Cold Climates Part 1

Embed Size (px)

DESCRIPTION

Porous Pavement in Cold Climates Part 1: Design, Installation, Maintenance. Robert Roseen and Thomas Ballestero, UNH Stormwater Center (presentation given March 17, 2011)

Citation preview

Page 1: Porous Pavement in Cold Climates Part 1

Porous Pavements in Cold ClimatesPorous Pavements in Cold Climates Part 1: Design, Installation, and Part 1: Design, Installation, and

MaintenanceMaintenance

A Green Infrastructure, Green Jobs, and Green A Green Infrastructure, Green Jobs, and Green Funding WorkshopFunding Workshop

Onondaga Environmental InstituteOnondaga Environmental Institute March 2011March 2011

Robert Roseen, PE, PhD, D.WRE, Robert Roseen, PE, PhD, D.WRE, Thomas Ballestero, PE, PhD, PH, CGWP, PG, James Houle, CPSWQThomas Ballestero, PE, PhD, PH, CGWP, PG, James Houle, CPSWQ

University of New Hampshire Stormwater CenterUniversity of New Hampshire Stormwater Center Department of Civil Engineering, University of New HampshireDepartment of Civil Engineering, University of New Hampshire

Page 2: Porous Pavement in Cold Climates Part 1

Dedicated to the protection of water resources through effective stormwater management

Research and development of stormwater treatment systems

To provide resources to stormwater communities currently involved in design

and implementation of Phase II requirements

Gregg Hall ●

35 Colovos Road ●

Durham, New Hampshire 03824-3534603.862.4024 ●

http://www.unhsc.unh.edu

Page 3: Porous Pavement in Cold Climates Part 1

Acknowledgements and SourcesAcknowledgements and Sources

UNHSC Design Specification for Porous Asphalt Pavements UNHSC Design Specification for Porous Asphalt Pavements and Infiltration Bedsand Infiltration Beds

Joshua F. Briggs, Geosyntec, Kristopher Houle, Horsley Joshua F. Briggs, Geosyntec, Kristopher Houle, Horsley Witten GroupWitten Group

Jeff Pochily, David Duncan, Mary Wescott, Pike Industries Jeff Pochily, David Duncan, Mary Wescott, Pike Industries

Andrew Potts, P.E., LEED AP, Water Resources Project Andrew Potts, P.E., LEED AP, Water Resources Project Manager, CH2M HILLManager, CH2M HILL

ASCE Committee Report on Recommended Design ASCE Committee Report on Recommended Design Guidelines for Permeable PavementsGuidelines for Permeable Pavements——Late 2010Late 2010

Bethany Eisenberg, VHB, Committee ChairBethany Eisenberg, VHB, Committee Chair

Kelly Collins, CWP, Committee Vice ChairKelly Collins, CWP, Committee Vice Chair

National Asphalt Pavement Association (NAPA): Information National Asphalt Pavement Association (NAPA): Information Series (IS)Series (IS)--131 Porous Asphalt Pavements (2008) 131 Porous Asphalt Pavements (2008)

NAPA ISNAPA IS--115 Open115 Open--Graded Friction Courses (2002) Graded Friction Courses (2002)

33

Page 4: Porous Pavement in Cold Climates Part 1

Part I OverviewPart I Overview1.1.

State of the PracticeState of the Practice

2.2.

Common Design and Common Design and Installation PitfallsInstallation Pitfalls

3.3.

Design and Installation Design and Installation SpecificationsSpecifications

4.4.

MaintenanceMaintenance5.5.

RepairsRepairs

44

Page 5: Porous Pavement in Cold Climates Part 1

State of the PracticeState of the Practice

Water quality performance is strong to Water quality performance is strong to excellent depending on designexcellent depending on designHydraulic performance is excellentHydraulic performance is excellentCold climate performance is strongCold climate performance is strongWinter maintenance has tremendous Winter maintenance has tremendous

potential salt reductionpotential salt reductionDesign specifications are improvingDesign specifications are improvingConstruction and installation are developingConstruction and installation are developing

55

Page 6: Porous Pavement in Cold Climates Part 1

State of the PracticeState of the Practice

Significant advancements in PA strength, Significant advancements in PA strength, durability, an cost have been achieveddurability, an cost have been achievedLarge increase in significant PA installs for Large increase in significant PA installs for

light duty, residential, commercial, and light duty, residential, commercial, and state road applicationsstate road applicationsHowever, a large number of installations However, a large number of installations

STILL continue to be subSTILL continue to be sub--standardstandard

WHY???WHY???66

Page 7: Porous Pavement in Cold Climates Part 1

Porous Asphalt Design OverviewPorous Asphalt Design Overview

Porous pavements for new and Porous pavements for new and redevelopment are a watershedredevelopment are a watershed--

based strategy that can both based strategy that can both mitigate impacts for new mitigate impacts for new development and reverse impacts development and reverse impacts in areas with redevelopment. in areas with redevelopment.

Porous asphalt systems combine Porous asphalt systems combine stormwater infiltration, storage, stormwater infiltration, storage, and structural pavement in a and structural pavement in a single system. single system.

PA consists of a pavement PA consists of a pavement surface underlain by a surface underlain by a stormwater storage bed. The bed stormwater storage bed. The bed is usually placed on uncompacted is usually placed on uncompacted soil to facilitate infiltration. soil to facilitate infiltration.

77

Page 8: Porous Pavement in Cold Climates Part 1

88

Porous Asphalt Path, Grey Towers National Historic Site, PA(Source: CH2M HILL)

Porous Asphalt Commercial Parking Lot, Greenland Meadows, Greenland, NH(Source: UNHSC)

Porous Asphalt Section of State Highway, South Portland, ME (Source: ME DOT)

Porous Asphalt Basketball Court, Upper Darby, PA (Source: CH2M HILL)

Porous Asphalt Residential Lane, Pelham, NH(Source: UNHSC)

UNH Elliot Alumni Center Parking Lot Durham, NH (Source: UNHSC)

Page 9: Porous Pavement in Cold Climates Part 1

Typical Porous Asphalt System SectionsTypical Porous Asphalt System Sections

99

Choker Course: 4”-8” (10 – 20 cm) minimum

Pervious pavement: 4-6” (10 - 15 cm) of porous asphalt

Filter Course: 8” - 12” (20 - 30 cm) minimum thickness of subbase (aka. bank run gravel or modified 304.1)

Native materials

Filter Blanket: intermediate setting bed: 3” (8 cm) thickness of 3/8” (1 cm) pea gravel

Reservoir Course: 4” (10 cm) minimum thickness of 3/4” (2 cm) crushed stone for frost protection, 4-6” (10-15 cm) diameter perforated subdrains with 2” cover

Optional-Liner for land uses where infiltration is undesirable (e.g., hazardous materials handling, sole-source aquifer protection)

Section with Filter Course for Water QualityTypical Section for Storage and Infiltration

Page 10: Porous Pavement in Cold Climates Part 1

1010

Design and InstallationDesign and Installation

Page 11: Porous Pavement in Cold Climates Part 1

Common PitfallsCommon Pitfalls Inappropriate PA mix selection WRT to Inappropriate PA mix selection WRT to

durability leads to raveling and low durabilitydurability leads to raveling and low durabilityPoor subbase compactionPoor subbase compaction——tendency to tendency to

underunder--compact due to concerns regarding compact due to concerns regarding infiltration leads to ruttinginfiltration leads to ruttingPoor asphalt compactionPoor asphalt compaction——tendency to tendency to

underunder--compact due to weaker subbase compact due to weaker subbase leads to low pavement durabilityleads to low pavement durability

1111

All issues can be addressed through qualified engineering oversight

Page 12: Porous Pavement in Cold Climates Part 1

Why So Many Poor Installations?Why So Many Poor Installations?

Porous pavements are an filtration/infiltration system as well as a transportation

surface. Because of dual functionality:Greater site evaluation and design effortStrict engineering oversight and skilled

personnel through all phases of the projectRequires a comprehensive maintenance

schedule

1212

Page 13: Porous Pavement in Cold Climates Part 1

Applications Applications -- Site ConstraintsSite Constraints

1.1.

Minimum 2Minimum 2--foot separation from bedrock and foot separation from bedrock and seasonal high water table,seasonal high water table,

2.2.

Measured soil infiltration rates typically between 0.25 Measured soil infiltration rates typically between 0.25 and 12 inches per hour, <0.25 in/hr may require and 12 inches per hour, <0.25 in/hr may require additional drainage and recharge bedsadditional drainage and recharge beds

3.3.

Appropriate separation from wells, septic systems, Appropriate separation from wells, septic systems, subsurface structures (basements), etc.subsurface structures (basements), etc.

4.4.

Where risk of groundwater contamination exists, as Where risk of groundwater contamination exists, as with any LID filtration system, the system may be with any LID filtration system, the system may be lined to prevent infiltration , thereby being limited to lined to prevent infiltration , thereby being limited to itit’’s filtration benefitss filtration benefits

1313

Page 14: Porous Pavement in Cold Climates Part 1

General Design Criteria General Design Criteria 1.1.

Pretreatment or avoidance of runoff from hot spots,Pretreatment or avoidance of runoff from hot spots,

2.2.

Locations of potential groundwater contamination from Locations of potential groundwater contamination from either high loading, high groundwater, or bedrock either high loading, high groundwater, or bedrock should employ liners.should employ liners.

3.3.

Level, or nearly level stormwater bed bottoms; sloped Level, or nearly level stormwater bed bottoms; sloped installations will need to employ internal grade controlsinstallations will need to employ internal grade controls

4.4.

A consideration of the loading ratio (ratio of drainage A consideration of the loading ratio (ratio of drainage area to infiltration area), area to infiltration area),

5.5.

Consideration of potential sediment, detritus, etc. Consideration of potential sediment, detritus, etc. sources that could lead to clogging,sources that could lead to clogging,

6.6.

Proper drainageProper drainage

1414

Page 15: Porous Pavement in Cold Climates Part 1

Porous Asphalt Mixes1.1.

LOWLOW--MODERATE DURABILITY:MODERATE DURABILITY:

PG 64PG 64--28* with 5 28* with 5 pounds of fibers per ton of asphalt mix. This mix is pounds of fibers per ton of asphalt mix. This mix is recommended for smaller projects with lower traffic recommended for smaller projects with lower traffic counts or loading potential. This mix is manageable at counts or loading potential. This mix is manageable at common batch plants.common batch plants.

2.2.

MODERATE DURABILITY:MODERATE DURABILITY:

PrePre--Blended PG 64Blended PG 64--28* 28* SBS/SBR with 5 pounds of fibers per ton of asphalt SBS/SBR with 5 pounds of fibers per ton of asphalt mix. This mix is recommended for large projects > mix. This mix is recommended for large projects > 1acre where high durability pavements are needed. 1acre where high durability pavements are needed.

3.3.

HIGH DURABILITY:HIGH DURABILITY:

PrePre--Blended PG 76Blended PG 76--22** modified 22** modified with SBS/SBR and 5 pounds of fibers per ton of with SBS/SBR and 5 pounds of fibers per ton of asphalt mix. This mix is recommended for large sites asphalt mix. This mix is recommended for large sites anticipating high wheel load (Hanticipating high wheel load (H--20) and traffic counts 20) and traffic counts for maximum durability. for maximum durability.

1515*or PG binder typical to region; **PG binder 2 grades stiffer

Page 16: Porous Pavement in Cold Climates Part 1

Porous Asphalt Mix Criteria

1616

Sieve Size (inch/mm) Percent Passing (%) 0.75/19 100

0.50/12.5 85-100 0.375/9.5 55-75No.4/4.75 10-25 No.8/2.36 5-10

No.200/0.075 (#200) 2-4 Binder Content (AASHTO T164) 6 - 6.5%

Fiber Content by Total Mixture Mass 0.3% cellulose or 0.4% mineral

Rubber Solids (SBR) Content by Weight of the Bitumen

1.5-3% or TBD 

Air Void Content (ASTM D6752/AASHTO T275)

16.0-22.0%

Draindown (ASTM D6390)* < 0.3 % Retained Tensile Strength (AASHTO 283)** > 80 %

Cantabro abrasion test on unaged samples(ASTM D7064-04)

< 20%

Cantabro abrasion test on 7 day aged samples < 30%

Page 17: Porous Pavement in Cold Climates Part 1

Cold Climate ConsiderationsCold Climate Considerations

Thickness of sub-base materials is determined based on various factors

1.

In cold climates / penetration of freezing Total system thickness ≥

0.65 * Dmax frost

depth (Ex. if Dmax = 48”

sub-base depth = 32”)

2.2.

The high voids content of the reservoir course The high voids content of the reservoir course creates a capillary barrier to prevent wicking of creates a capillary barrier to prevent wicking of moisture in subbase minimizing winter freezemoisture in subbase minimizing winter freeze--

thaw and heavingthaw and heaving

1717

Page 18: Porous Pavement in Cold Climates Part 1

Recommended Installation Recommended Installation

1818

Page 19: Porous Pavement in Cold Climates Part 1

1919

Compaction and RuttingCompaction and Rutting

Install filter, choker, gravel, and stone base course aggregate in 8-inch maximum lifts to a MAXIMUM of 95% standard proctor compaction (ASTM D698 / AASHTO T99).

The density of subbase courses shall be determined by AASHTO T 191 (Sand-Cone Method), AASHTO T 204 (Drive Cylinder Method), or AASHTO T 238 (Nuclear Methods), or other approved alternate

The infiltration rate (ASTM D3385 or approved alternate ) shall be no less 5-30 ft/day or 50% of the hydraulic conductivity (D2434) at 95% standard proctor compaction

Page 20: Porous Pavement in Cold Climates Part 1

2020

Multiple lift installationMultiple lift installation

PA can be installed as 1 or 2 lifts depending on site

2nd

lift improves pavement compaction

Paving sequencing is important---plan to minimize traffic on completed lifts

Should be up to the contractor. Small simple jobs may be easier in a single lift, larger jobs in two lifts.

Two-lift scenario may require use of a light application of tackifier between the first and second lift.

Enables installation of curbs and castings in typical fashion

Simplifies use of “tacky”

64-28SBR/SBS or 76- 22SBR/SBS as top layer and 64-28 with fibers as base

course

Page 21: Porous Pavement in Cold Climates Part 1

2121

Page 22: Porous Pavement in Cold Climates Part 1
Page 23: Porous Pavement in Cold Climates Part 1

Asphalt CompactionAsphalt Compaction

Immediately after the asphalt mixture has been spread, struck off, and surface irregularities adjusted, it shall be thoroughly and uniformly compacted by rolling. The compaction objective is 16% -

19% in place void content (Corelock).

Breakdown rolling shall occur when the mix temperature is between 275 to 325°F

Intermediate rolling shall occur when the mix temperature is between 200 to 275°F

Finish rolling shall occur when the mix temperature is between 150 to 200°F

The cessation temperature occurs at approximately 175°F, at which point the mix becomes resistant to compaction and will not achieve adequate durability.

Rolling should not cause undue displacement, cracking, or shoving. 2323

Page 24: Porous Pavement in Cold Climates Part 1

LinersFederal guidelines regulate groundwater

protection standards. Most states require 1-3 ft separation between

the system and the seasonal high water table (or bedrock).

Liners can be used for sites where the infiltration is not appropriate (eg. high water table, bedrock karst sites and hot spots where hazardous materials may be handled).

The use of Liners will preserve water quality through detention and filtration but limit any infiltration.

Liners can be made from HSG 'D' soils, HDPE, or clay

2424

Page 25: Porous Pavement in Cold Climates Part 1

2525

Compacted soil liner, subdrains with cover

Page 26: Porous Pavement in Cold Climates Part 1

2626

Construction of Subsurface BedConstruction of Subsurface BedBedrock covered by HDPE liner & BRG

Under-drains set in crushed gravel

Choker course placed for stability

Page 27: Porous Pavement in Cold Climates Part 1

GeotextilesGeotextilesRecommendations vary on the usage of Recommendations vary on the usage of

geotextiles in pervious pavement systems. geotextiles in pervious pavement systems.

At minimum, geotextiles should be used on soils At minimum, geotextiles should be used on soils with poor load bearing capacity, high fines with poor load bearing capacity, high fines content, and on the sides of the excavation to content, and on the sides of the excavation to prevent inprevent in--migration of fines. migration of fines.

Infiltration systems, such as pervious Infiltration systems, such as pervious pavements, that are subject to soil movement pavements, that are subject to soil movement and deposition should carefully consider the and deposition should carefully consider the usage of geotextiles. usage of geotextiles.

2727

Page 28: Porous Pavement in Cold Climates Part 1

2828

Post Construction O&M Post Construction O&M

Curing time needs are site specific but there should be at least 24-48 hrs of curing. Common sense clause may lead to lower threshold for small jobs with lighter loading such as when pavement surface is less than 100 F (one-

time measurement). Problems occur when the surface temperature is greater than 120 F.

Page 29: Porous Pavement in Cold Climates Part 1

MaintenanceMaintenance

2929

Page 30: Porous Pavement in Cold Climates Part 1

MaintenanceMaintenance

The best maintenance is designing for low maintenance

Preventing run-on is a key to extending the life of permeable

surfaces.

Powerful vacuum (36-in)

Feeder broom effective at loosening some larger debris

Onboard PW effective at unclogging, but some dripped back onto pvt

Vacuuming minimum of 2-4 times per year for low use sites and up to weekly -monthly for high use sites

Costs range from $350-500/acre

3030

Page 31: Porous Pavement in Cold Climates Part 1

Repairs and ReplacementRepairs and Replacement

Damage can occur to PA from nonDamage can occur to PA from non--design design loadsloads

Repairs may be needed from cuts for utilitiesRepairs may be needed from cuts for utilitiesRepairs can be made with standard HMA for Repairs can be made with standard HMA for

most damages up to 15% of surface areamost damages up to 15% of surface areaPA can be repaired by heating and rerolling PA can be repaired by heating and rerolling

at $2000/day at approximately 500at $2000/day at approximately 500’’

of trenchof trenchWhen pavement reaches end of life, it is When pavement reaches end of life, it is

replaced by milling to choker coarse.replaced by milling to choker coarse.

3131March 25, 2010March 25, 2010

Page 32: Porous Pavement in Cold Climates Part 1

Used for repairs Used for repairs around manholes, around manholes, catch basins, and for catch basins, and for reworking rough reworking rough pavement areas pavement areas

Asphalt in the repair Asphalt in the repair area can be raked and area can be raked and rolled back into place rolled back into place and additional hot mix and additional hot mix can be added when can be added when

Repairs cost ~$2000Repairs cost ~$2000

3232March 25, 2010March 25, 2010

Page 33: Porous Pavement in Cold Climates Part 1

Example Sites in the Example Sites in the NortheastNortheast

Page 34: Porous Pavement in Cold Climates Part 1

Greenland Meadows CommercialGreenland Meadows Commercial

““GoldGold--StarStar””

Commercial Commercial

DevelopmentDevelopment

Cost of doing business near Cost of doing business near Impaired Waters/303DImpaired Waters/303D

High water table, poor soilsHigh water table, poor soils

Brownfields site, ideal location, Brownfields site, ideal location, 15yrs15yrs

Proposed site >10,000 Average Proposed site >10,000 Average Daily Traffic count on >30 acresDaily Traffic count on >30 acres

Page 35: Porous Pavement in Cold Climates Part 1

28 ac site, initially >95% impervious, now <10%EIC, with all drainage through filtration, expected to have minimal WQ impact except thermal and chloride

3/23/20113/23/2011 3535

Page 36: Porous Pavement in Cold Climates Part 1

3/23/20113/23/2011 3636

Page 37: Porous Pavement in Cold Climates Part 1

Boulder Hills, Pelham, NHBoulder Hills, Pelham, NH

2009 Installation of 9002009 Installation of 900’’

of of

first PA private residential first PA private residential road in Northeastroad in Northeast

Site will be nearly Zero Site will be nearly Zero dischargedischarge

LID subdivision 55+ Active LID subdivision 55+ Active Adult CommunityAdult Community

Large sand depositLarge sand deposit

Cost 25% greater per ton Cost 25% greater per ton installedinstalled

3/23/20113/23/2011 3737

Page 38: Porous Pavement in Cold Climates Part 1

3/23/20113/23/2011 3838

Page 39: Porous Pavement in Cold Climates Part 1

Maine Mall, Long Creek WatershedMaine Mall, Long Creek Watershed S. Portland, MES. Portland, ME

Surface Surface Transportation ARRA Transportation ARRA Project Project First DOT PA road in First DOT PA road in

the northeastthe northeast--Sept 09Sept 091500 feet of Highway 1500 feet of Highway

Reconstruction Reconstruction 20,000 vehicles per 20,000 vehicles per

dayday

Page 40: Porous Pavement in Cold Climates Part 1

Maine MallMaine Mall

Significant that DOT is Significant that DOT is even considering iteven considering it

DOT involvement in PA is DOT involvement in PA is crucial for successcrucial for success

Rockstar MixRockstar Mix

PG76PG76--24SBS with 24SBS with FibersFibers

High durabilityHigh durability

RDA/TMDL was essentialRDA/TMDL was essential

Page 41: Porous Pavement in Cold Climates Part 1

Conclusions

Porous pavements are not a silver bulletPP are a watershed-based strategy that can

both mitigate impacts for new development and reverse impacts in areas with redevelopment.

Successful installations will requireGreater site evaluation and design effortStrict engineering oversight and skilled personnel

through all phases of the projectRequires a comprehensive maintenance schedule

4141

Page 42: Porous Pavement in Cold Climates Part 1

Looking ForwardLooking Forward

The need for training and possible The need for training and possible certification for designers and installerscertification for designers and installers Installation checklistInstallation checklist Increased availability of PA suppliers Increased availability of PA suppliers Greater availability of pavement cleaningGreater availability of pavement cleaning

4242

Page 43: Porous Pavement in Cold Climates Part 1

Questions?Questions?