Pimpri - Chinchwad Municipal Corporation, Pimpri BRTS PROJECTS Shrikanth Savane, Pimpri – Chinchwad Municipal Corporation

Pimpri-Chinchwad Municipal Corporation BRTS Project

  • Upload
    embarq

  • View
    1.637

  • Download
    2

Embed Size (px)

DESCRIPTION

SESSION 2A - ‘Bus Rapid Transit – Stories from 2013

Citation preview

Page 1: Pimpri-Chinchwad Municipal Corporation BRTS Project

Pimpri - Chinchwad Municipal Corporation, Pimpri BRTS PROJECTSShrikanth Savane, Pimpri – Chinchwad Municipal Corporation

Page 2: Pimpri-Chinchwad Municipal Corporation BRTS Project

WELCOME

Pimpri Chinchwad Municipal Corporation, Pimpri

BRTS PROJECTS

15th APRIL 2013

Page 3: Pimpri-Chinchwad Municipal Corporation BRTS Project

Would Like to Share

About Pimpri Chinchwad City

Institutional Set Up & Key Responsibilities

BRTS Projects

Progress / Achievements / Work completed

Bus Station

ITMS

.

Page 4: Pimpri-Chinchwad Municipal Corporation BRTS Project

About Pimpri Chinchwad City

Page 5: Pimpri-Chinchwad Municipal Corporation BRTS Project

Located towards North of Pune Area of 181 sq.km Population: 1.8 million (approx) PCMC received “BEST CITY “ award

0n 13th Dec.2012 From GOI for its best performance in JnNURM

• Area under Green Cover: 27%

• Annual Budget (2013-2014): Rs.

1800 Cr.

• Credit Rating: AA+ (SO) by CRISIL

Ratings (S&P)

Pimpri Chinchwad at a Glance

Page 6: Pimpri-Chinchwad Municipal Corporation BRTS Project

Vibrant city in the state of Maharashtra, India

Strong industrial base Small & medium industrial units of about 6,000 Large industrial units of about 50 Auto and ancillary industrial Hub

Page 7: Pimpri-Chinchwad Municipal Corporation BRTS Project

Presence of International IT Firms

Page 8: Pimpri-Chinchwad Municipal Corporation BRTS Project

Social and recreational facilities Strong Social Infrastructure with Municipal

Hospitals and Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.

Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.

Page 9: Pimpri-Chinchwad Municipal Corporation BRTS Project

Population growth

The city has a population of about 1.8 millions growing annually at over 6% p.a. (national average 2.1%)

Growth is fuelled by prospects of economic activity, good quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai

Population Growth

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1951 1961 1971 1981 1991 2001

Year

Pop

ula

tion

PopulationGrowth ofPCMC

Page 10: Pimpri-Chinchwad Municipal Corporation BRTS Project

Institutional Set-up

Key Responsibilities

Page 11: Pimpri-Chinchwad Municipal Corporation BRTS Project

Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the year 1982

The body constitutes of Elected wing headed by – Mayor Administrative wing headed by – Municipal Commissioner

We manage about 181 sq.kms of area through our 4 Ward offices We have over 40 departments with a workforce of about 7500

employees

Institutional set up

Page 12: Pimpri-Chinchwad Municipal Corporation BRTS Project

Institutional set up

We are fully e-governed Corporation We received International Organization of

Standard (ISO) Certification (ISO 9001:2008) for Quality Management System.

Page 13: Pimpri-Chinchwad Municipal Corporation BRTS Project

Responsible for Area planning

Infrastructure planning, implementation and operation &

maintenance of services in the areas of

Water Supply,

Sewerage and Sanitation,

Solid Waste Management,

Roads and Transportation,

Street lighting,

Health and recreational facilities,

Education (134 primary and 18 secondary schools)

Preservation of natural heritage (river conservation),

Development of housing facility for urban poor/ slums.

Page 14: Pimpri-Chinchwad Municipal Corporation BRTS Project

Vision

To make Pimpri Chinchwad, a city of and for the next generation

Economically vibrant, attracting top business houses

And meet the requirements of all its citizens

A city to Live, Spend and Entertain

Page 15: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS PROJECTS

Page 16: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS PROJECTS IN PCMC AREA

AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40

KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20

NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80

PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74

Total BRTS Corridor Length = 44.575 Km.

First Intersection

Second Intersection

Page 17: Pimpri-Chinchwad Municipal Corporation BRTS Project

DESCRIPTION OF REVISIONS INTIALS

A B C

REV DATE

NTS

SCALE:R1/R2 22-12-2006

TYPICAL CROSS SECTION

61 m BRTS CROSS SECTION

Page 18: Pimpri-Chinchwad Municipal Corporation BRTS Project

45 M BRTS CROSS SECTIONREVISED TYPICAL CROSS SECTION FOR 45.0M

300

REVISED TYPICAL CROSS SECTION WITH BUS STOP

300

CLIENTPROJECTDRAWING TITLE

SCALE-:1:100

DATEREV.

DATE : -09/12/2011DRG. NO:-CVKCPL/PCMC/ANNUITY/KALEWADI/CROSS-SECTION/45.00m/04

STATUS

C.V.KAND CONSULTANTSPRIVATE LIMITED

CONSTRUCTUION OF BRTS CORRIDORKALEWADI TO DEHU-ALANDI ROAD

(PACKAGE-II)FROM CH:-1+600 TO 3+000

410

8

.

11

icaM

kiTbaQda janaihtaya

mahanagarpailaka

REVISED TYPICAL CROSS SECTION & PLANFOR 45.00 m WIDE ROAD

PIMPRI CHINCHWAD MUNICIPAL CORPORATION15/07/2011R1

R2 08/12/2011

R3 22/12/2011

SHEET 1 OF 1

Page 19: Pimpri-Chinchwad Municipal Corporation BRTS Project

Corridor No 1 2 3 4

BRT CORRIDOR

Pune-Mumbai Highway

Aundh Ravet RoadNashik Phata To

WakadKalewadi Phata to

Dehu Alandi

Length in KM. 12.00 14.50 8.0010.275

Expected Project Cost

on completion Rs. In. Cr.

254.59 305.00 227.00 241.00

Expenditure as on 31St March 2013. Rs. In.

Cr.

254.59 229.65 180.82 86.50

Expected Completion

Date Dec 2013 Dec 2013 Dec 2013 Oct. 2014

BRTS Project Status

Page 20: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS Project statusCorridor No 1 2 3 4

BRT CORRIDORPune-Mumbai Highway Aundh Ravet Road Nashik Phata To Wakad

Kalewadi Phata to Dehu Alandi

Present Status

Work is completed 16 BRT bus

stations are under construction on PPP basis.

Remaining 20 BRT bus stations will be completed by Dec-13.

Out of 16 BRT bus stations 12 bus stations completed & remaining 4 are in progress.

Unless all bus stations (16+20) completed BRT service cannot be started, so far all bus station will be completed by Dec. 13.

Length 14.50 Km- length 10.5 km completed.

4.00 km work is in Progress. Defence land is transferred in the month of Aug.12.

20 bus stations are planned & execution will be completed by Dec 13.

Work is in Progress. 83% of flyover work is

completed and total completion is expected by Oct. 13.

Road work is in Progress. Defence land is transferred in the month of Aug.12.

75% of road work is completed other than WP in High Court/District Court against land acquisition. (600m length of road out of 7.90 km).

15 bus stations are planned & execution will be completed by Dec 13.

Work is in Progress.

28% of flyover work is completed and stipulated date of completion is Oct. 13 and extension of time requested is 31st Aug 2014.

Road work is in Progress.

WP in High Court against land acquisition. Rehabilitation & Resettlement of 184 PAP’s is in process (1.6 km out of 10.275).

19 bus stations are planned & execution will be completed by Oct 14.

Page 21: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS

BRT CORRIDOR :- Aundh- Ravet Road

SECTION – IV WORK COMPLETED

SECTION – III WORK COMPLETED

Page 22: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS

BRT CORRIDOR :- Aundh- Ravet Road

SECTION – VI WORK COMPLETED

SECTION – V WORK COMPLETED

Page 23: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS

BRT CORRIDOR :- Aundh- Ravet Road

SECTION – I & II WORK IN PROGRESS

SECTION – VII WORK COMPLETED

Page 24: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS

BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)

NASHIK PHATA JUNCTION - 2nd Tier

NASHIK PHATA JUNCTION - 1st Tier

Page 25: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)

ROAD WORK IN PROGRESS

Page 26: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS

BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)

EMPIRE ESTATE PORTION

SEGEMENT CASTING YARD

Page 27: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRTS SUTP PROJECT STATUS

BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)

ROAD WORK IN PROGRESS

Page 28: Pimpri-Chinchwad Municipal Corporation BRTS Project

BUS STATION

Page 29: Pimpri-Chinchwad Municipal Corporation BRTS Project

Conceptual Layout

BRTS STATIONS -51.0 X 3.0 M SIZE FOR ONE SIDE DOCKING

Page 30: Pimpri-Chinchwad Municipal Corporation BRTS Project

Conceptual Layout

BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING

Page 31: Pimpri-Chinchwad Municipal Corporation BRTS Project

BRT BUS STOP DESIGN

Page 32: Pimpri-Chinchwad Municipal Corporation BRTS Project

The Intelligent Transit Management System (ITMS) shall comprise of the following distinctive applications.

• Automated Fare Collection System• GPS based Fleet Monitoring System• Vehicle Scheduling & Dispatch System• Passenger Information System• Financial Management System / Central Clearing House System• Depot Management System & Bus Terminal Management System• Incident Management System / Call centre Management System• Business Intelligent System• Enterprise Management System

The estimated cost is Rs.19.07 Cr. for both hardware & software part of ITMS. The total O & M cost for 6 years on annuity basis is worked out as Rs. 30.65 Cr.

ITMS

Page 33: Pimpri-Chinchwad Municipal Corporation BRTS Project

Technical Studies

Procurement of Consultant for Monitoring & Evaluation of BTRS services on all 4 corridors in PCMC area

IBI Group, Canada has been appointed on 1st March 2013. Access plan to BRT corridor by Pedestrian & NMT–

Proposal from MVA Asia consultancy is in process of acceptance. Parking policy & Management --

Proposal from UMTC consultancy is in process of acceptance. Promotion & Out reach Program –

Proposal from IBI Group Canada consultancy is in process of acceptance.

Consultancy for O & D survey of corridor No. 3&4 –

Aakar Abhinav,Mumbai has been appointed on 1st March 2013. Consultancy for Safety Audit of Pune –Mumbai Road.

Proposal from IIT Mumbai (Powai) is in process of acceptance.

Page 34: Pimpri-Chinchwad Municipal Corporation BRTS Project

Thank you!