Upload
public-privatepartnership
View
598
Download
1
Tags:
Embed Size (px)
Citation preview
Key PPP Precepts
Drawn from International
Experience
Patricio Mansilla
Infrastructure Director
Chemonics International
IDEAS AND CONCEPTS BEHIND SUCCESSFUL
PPP PROGRAMS
PPP INFRASTRUCTURE PRECEPTS
2
3
Chemonics PPP Infrastructure
Precepts:
• Approach PPP infrastructure development as a Program rather
than ad-hoc transactions;
• Provide specialized Technical Assistance through the entire project preparation-cycle (Alpha to Omega);
• Do not “short-change” project preparation costs;
• Promote vigorous, open, and transparent competition;
• Look for opportunities to leverage public sector funding;
• Strengthen the PPP legal/institutional regulatory framework over time.
CHEMONICS PPP PRECEPTS
Approach PPP infrastructure development as a
program rather than ad-hoc, one of a kind
transactions.
4
Chemonics PPP Precepts
Why?
• Multiple projects support and drive PPP institutional
development;
• PPP transaction design and structuring is expensive; need to
seek economies of scale;
• Economical use of professional staff;
• Need for a PPP institutional home: An in-country base for PPP
knowledge and experience of what works and what does not
work;
Examples: PPP Unit / South Africa National Treasury;
ProInversion / Peru;
Philippines / Ministry of Finance PPP Unit 5
CHEMONICS PPP PRECEPTS
Provide specialized Technical Assistance through
the entire project preparation process:
Alpha to Omega (A-Z)
6
Chemonics PPP Precepts
Why?
• The “Design Phase” of a PPP transaction is the easy part, the
more difficult and important part is the “Transaction
Implementation Phase”.
End Objective
• Build stakeholder consensus, political commitment, and public
support, as well as, ensure essential private investment.
7
Consultation with key stakeholders: Build consensus, political commitment, and public support
Due Diligence / Technical Project Design
Financial Structuring
Risk Allocation & Mitigation
Tech/Fin/legal Transaction Design
Define Objectives/ Select PPP option
Shadow Rating/Credit Enhancement
Asses investor interest
Transaction Design
Transaction Implementation
Local/International Promotion
Draft bidding documents/contracts
Pre-qualification
Bidder due-diligence
Interaction with Bidders “negotiation”
PPP Contracts/Procurement Process
Contract Award / Financial Closure
CHEMONICS PPP PRECEPTS
Do not “short change” project preparation costs.
9
Chemonics PPP Precepts
Why?
“A dollar saved is not necessarily a dollar earned.”
• Most PPPs are capitol intensive and the private sector (both
international and domestic) is being asked to assume
substantial risk as they make the crucial decision to invest or
not.
• Sound project preparation is the key to building investor
confidence.
10
Technical Assistance (T.A) and the Case of Peru
1,000 Km Amazon North Highway_
11
T.A. Cost
$4.7 Million
Investment
$220 Million
12
Amazon North: 960 Km.
Investments: $220 mil.
O&M: $15 mil./year
Awarded in: April 2005
Amazon Central: 854 Km.
Investments: $115 mil.
O&M: $15 mil./year South Container Terminal
Port of Callao $364-$617mil.
Awarded: June 2006
Transport PPP
Transactions
FBT: 480 Km.
Investments: $162 mill.
13
Technical Assistance (T.A) and the Case of Peru
Port of Callao (Lima)_
14
T.A. Cost
$3.3 Million
Investment
$430 Million
15
a) Increase in Demand (Port moves
more than 1 million TEU per year
and serves 80% of Peruvian foreign
trade)
b) Overruns, low productivity and
technological change
c) Negative externalities
d) $800 million in investments required
in Peruvian ports
Callao Port
What’s wrong with this Picture?
No Gantries in Callao Port
Container docks -
ENAPU
South Breakwater
Option of second
phase
Currently
demolished
Lima-
Peruvian
Capital
7 ha
In the Case of Peru
$ 8.0 Million in Government-
Financed Technical
Assistance
$ 650 Million in Private
Sector Investment
18
• Peru PPP Investment to Technical Assistance Ratio = 80:1 • Moral of the story with respect to financing PPP design/structuring:
Don’t be “Penny-wise and pound foolish”
CHEMONICS PPP PRECEPTS
Promote vigorous, open, and transparent
competition.
19
Chemonics PPP Precepts (cont.)
Why?
• PPP projects in themselves do not always guarantee lower
prices or better services – competition does.
• Additionally vigorous, open competition is the single best way to
prevent corruption.
20
Montería Water PPP: The first Water
PPP in Colombia
MONTERIA – year 2000
• Population: 300,000 (80% Low Income)
• Water production: 600 lps.
• Non revenue water: 55 %
• Metering: 0.7 %
• Revenues: $4 M
• Water Coverage: 50 %
• Connections: 36,500
• Sewerage Coverage: 27 %
• Connections: 14,600
• Required Capital
investments: $70-80 mill
Bogota
Montería
PANAMA
VENEZUELA
BRASIL
PERU
ECUADOR
COLOMBIA
The Case of Montería,
Colombia PPP
The Case of Montería, Colombia PPP
Montería
Water/Sewage
Coverage
Units Before Concession 3 years after
Concession
Water Coverage % 50 76
Sewage Coverage % 27 40
Water Production liters/sec. 659 915
Hours of Service Hours/day 3/4 18/24
22
Competition set the stage for generation of these results.
Transaction
Structure
Prepare RFP &
Draft Contract Pre-
Qualification Consultation
“Negotiation”
Amend
Business Model
and
PPP Contract
Bidding:
Proposals &
Evaluation
PPP Contract
Award
Competitive Bidding Process
Local and International Project
Promotion
Constant Interaction with Bidders
Financial
Closure
How is Competition Maximized?
• Incentives for maximizing the number of qualified
bidders submitting proposals.
• In the case of Montería the transaction consultant
received a scaled success fee payment:
– 80% of success fee for 1 qualified bidder
– 100% success fee for 2 qualified bidders
– 120% success fee for 3 or more qualified bidders
(FCC/VIVENDI, Azurix, and CEC/Venezuela).
24
How is Competition Maximized? (Cont.)
• Partial Credit Guarantee (PCG): The case of the
Amazon North Concession in Peru.
• Road shows to sell the country and the PPP
project.
• Solid technical and financial PPP Design /
Structuring.
25
• Fundamental underlying precept at the core of PPP
implementation philosophy;
• PPP does not guarantee lower prices or better
service, competition does…;
• Essential that the public does not perceive that PPP
merely substitutes a private sector monopoly for a
public sector monopoly;
• Procedural transparency and professionalism is
critical to the success of PPP procurements.
Competition, Competition, and more
Competition
Chemonics PPP Precepts
Look for opportunities to leverage public sector
financing
27
Chemonics PPP Precepts (cont.)
• Partial Credit Guarantees (PCG);
• Right-sizing the government’s capital commitment to
properly allocate risk between the public sector and
private sector:
Amazonas Norte PCG
Callao Port and Monteria Water/Sewage
28
Chemonics PPP Precepts
Strengthen the legal/institutional regulatory
framework overtime;
29
Chemonics PPP Precepts (cont.)
• In the absence of established regulatory institutions
to oversee specific PPP transactions, PPPs can and
should move forward with regulatory provisions
embedded in each PPP contract;
• Overtime the regulatory/institutional framework will
evolve and take root at the individual ministry level or
in a special purpose regulatory body…in the
meantime keep building the portfolio of PPP
transactions.
30
Thank You Very Much