14
Configuration Management User Group (formerly: Marimba Users Group) www.CM-UG.com © Copyright December 19, 2011 [email protected] CM-UG Meeting Minutes 11.16.2011 Conference Call Information All CM-UG calls unless otherwise noted will use the following dial in information: US Conferencing Number: 1 800 504 8071 7-Digit Access Code: 4461126 Agenda: 1. Upcoming CM-UG Events 2. 8.1.01.007 patch details 3. Issues/Concerns 4. User Interaction

November 2011 (8.1.01.007 Details)

Embed Size (px)

DESCRIPTION

November 2011 (8.1.01.007 Details)

Citation preview

Page 1: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

© Copyright December 19, 2011 [email protected]

CM-UG Meeting Minutes – 11.16.2011

Conference Call Information

All CM-UG calls unless otherwise noted will use

the following dial in information:

US Conferencing Number: 1 800 504 8071

7-Digit Access Code: 4461126

Agenda:

1. Upcoming CM-UG Events

2. 8.1.01.007 patch details

3. Issues/Concerns

4. User Interaction

Page 2: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

© Copyright December 19, 2011 [email protected]

Upcoming CM-UG Events

December User Group Call

Wednesday December 21st, 2011 - 1PM Eastern / Noon Central

Monthly Feature: No topic, short call

November User Group Call

Wednesday January 18th, 2012 - 1PM Eastern / Noon Central

Monthly Feature: PS Workshops

Upcoming Events

Reminder:

The CM-UG call is normally the 3rd Wednesday of each month at 12 noon central time.

The CM-UG calendar is also located here > http://calendar.cm-ug.com

Page 3: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Suggest a topic:

If you have a topic you

would like to discuss as a

monthly feature please

send an email to

[email protected]

Potential Meeting Topics/Demos

Open to presentations from CM-UG Members and Vendors.

Upcoming CM-UG Events

– Member Presentations:

– Stopping channel shopping (Josh L)

– Custom inventory scanning (Jason M)

– Custom Reporting interfaces

– Custom ARS interfaces

– Vendor Presentations:

– Marimba 8.2 Roadmap (BMC)

– AdminStudio Info (Flexera)

– Marimba/Matrix42 VDI Solutions

– BMC Product Roadmaps

© Copyright December 19, 2011 [email protected]

Page 4: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

8.1.01.007 patch details

8.1.01.007 patch details

Following slides are from the presentation last month.

Page 5: November 2011 (8.1.01.007 Details)

42

BBCA 8.1.01.007Whats new?

CMUG – November 2011

Page 6: November 2011 (8.1.01.007 Details)

42

Recap - CMUG September 2011

-checkchannels-repairchannels

-repairchannels force

-repairWorkspace-fsck

-reconstructFixtuner.exe

Page 7: November 2011 (8.1.01.007 Details)

42

Stability release - focus on tuner robustness

Automates the process of fixing tuner/channel corruption

Simple to use:

Auto-Recover from any storage corruption

Set tuner property ‘marimba.tuner.force.repair’ to true

Tuner would detect storage corruption and trigger reconstruct

Tuner would fix storage corruption and check for channel corruption.

Auto-repair channels when files are missing/corrupt

Set tuner property ‘marimba.tuner.corruption.channels.forceupdate’ to true

Any storage corruption would first trigger tuner storage repair followed by channel repair & update of corrupt channel(s)

The missing/corrupt files will be re-downloaded from server

All previous options (below) are still supported

checkchannels

repairchannels

repairworkspace

fsck

Reconstruct

Important defect fixes [MESH, Corruption, Power state transition etc]Refer to 8.1.01.007 release documentation for complete details

8.1.01.007 - A Preview

Page 8: November 2011 (8.1.01.007 Details)

42

8.1.01.007 - A Preview

Page 9: November 2011 (8.1.01.007 Details)

42

8.1.01.007 - A Preview

Page 10: November 2011 (8.1.01.007 Details)

Thank you

Enable Limitless Workplaces.

Page 11: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

CM-UG – Mailing List

› User Email Group:

– Sign up for the group email and subgroup emails here: http://Subscribe.CM-UG.com

© Copyright December 19, 2011 [email protected]

Page 12: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

CM-UG - User Interaction

Join the LinkedIn Group = http://www.linkedin.com/groups?gid=1774296

© Copyright December 19, 2011 [email protected]

Page 13: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

CM-UG - User Interaction

›BMC Developer NetworkPlease register an account on the new BMC developer network.

These forums are very nice and provide a single place now for all BMC products.

BBCA Forums

© Copyright December 19, 2011 [email protected]

Page 14: November 2011 (8.1.01.007 Details)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Marimba Jobs

›Jobs.CM-UG.com

›Look for CM related positions

›Post Req’s for CM related positions

© Copyright December 19, 2011 [email protected]