Upload
nidec-corporation
View
416
Download
4
Embed Size (px)
DESCRIPTION
CAPABILITY OVERVIEW FOR OIL&GAS APPLICATIONS
Citation preview
www.nidec-asi.com
CAPABILITY OVERVIEW FORCAPABILITY OVERVIEW FOROIL&GASOIL&GAS APPLICATIONSAPPLICATIONS
Oil & Gas
PPT2013.01.01.02EN
2www.nidec-asi.com
Oil & Gas experience
NIDEC ASI has been serving Oil & Gas industry for over forty years.
Our equipment is a vital part of the oil & gas chain from extraction to the finished products.
We have the knowledge and the experience to drive your assets to their final destination
safely, both on land and by sea, and have proven ourselves as valid partners in addressing
the technological challenges that new fields and new processes present.
PPT2013.01.01.02EN
3www.nidec-asi.com
Motors & GeneratorsInduction & Synchronous Machines
Our Strengths
Custom Engineered Solutions
2 pole stiff shaft design
Wide range of Power Ratings
Our Strengths
Custom Engineered Solutions
2 pole stiff shaft design
Wide range of Power Ratings
Induction machines
Power rating:
− 150 ÷ 25,000 kW
− 200 ÷ 33,000 HP
Voltage:
− up to 15 kV
Mass:
− 1,500 ÷ 120,000 kg
Number of poles:
− 2 ÷ 36
Frame size:
− 315 mm through 1120, 10, 11, 12, 13
Synchronous machines
Power rating:
− 150 ÷ 45,000 kW
− 200 ÷ 60,000 HP
Voltage:
− up to 15 kV
Mass:
− 1,500 ÷ 160,000 kg
Number of poles:
− 2 ÷ 36
Frame size:
− 450 mm through 1120, 10, 11, 12, 13
PPT2013.01.01.02EN
4www.nidec-asi.com
Motors & GeneratorsHigh Speed Machines
High speed VFDpackagesPower rating:500-75000 kW/kVAVoltage: up to 15 kVMass: 4000 – 150000 kgTypical Speed Range70%105%
20
10
0
30
40
50
60
70
80
2000 4000 6000 8000 10000 12000 14000 16000 18000 20000 22000
MW
Consolidated
New
Under discussion
Delivered
Recent projects update
rpm
PPT2013.01.01.02EN
5www.nidec-asi.com
Series ET/CADPower rating: 150 – 4500 kW/kVAVoltage: UP TO 15000 VMass: 1500 – 25000 KgNumber of poles: 2 – 20Frame size: 355 – 800 mmATEX certfied
Explosion Proof Machines (Ex d) Hazardous Area Machines
Types of Protection AvailableEx n - non sparking machinesEx e - increased safety machinesEx p - pressurized machines
NIDEC ASI has installed more than 2400 explosion proof machines in 56 countries and morethan 4300 motors installed in hazardous areas in 73 countries
Our motors and generators for hazardous area and explosion proof machines are certified by third parttesting authorities CESI (CENELEC member). They meet both most exigent requirement standard
(Shell, Saudi Aramco, Exxon Mobil) and the main international standard IEC 60079.
Motors & GeneratorsHazardous Area & Explosion Proof Machines
PPT2013.01.01.02EN
6www.nidec-asi.com
Drives
Since 1993 NIDEC ASI has installed more than 2000 Drives and Softstarters
PPT2013.01.01.02EN
Silcovert SThyristor based LCI
for synchronousmotors providesspeed regularity,monitoring andbraking torque
regulation
GT 3000 / GT 5000IGBT based
variable frequencydrive with
unmatched levelsof adaptability
Series HAir cooling: up to 8100 KVAWater cooling: up to 18700
KVA (higher power onrequest)
Voltage: up to 7200 V(12000 V on request)
Series NAir cooling: up to 10400
KVAWater cooling: up to24000 KVA (higherpower on request)
Voltage: up to 3300 V
7www.nidec-asi.com
HV HV
MV
HV MV
MV LV
transmission distribution
Going Electric may increase energy demands on existing networks causing instability,improving the interconnection of medium/high tension supply or upgrading existingconnections can help avoid these problems.NIDEC ASI can supply a fully integrated Transmission, Distribution and Power QualityPackage to create your ideal power solution, offering turn key substations or revamping ofexisting substations.
Our power quality solutions can help guarantee performance, improve and optimize anypower conversion point for stable grid connection even on weaker, unstable networks.
Plus harmonic filtering and compensation
Electric Power SupplyTurn-key substations
PPT2013.01.01.02EN
8www.nidec-asi.com
Oil & Gas Application Know-HowFrom Extraction to Distribution
FPSO/FRSU
Pump substation
Compression stationPower
substaions
Offshore&
OnshoreOil & gas extraction
ProcessingGOSPBOG
Refining
LNGGTLNGL
Transportation
Pip
elin
e
Storage
DownstreamMidstreamUpstream
Distribution
PPT2013.01.01.02EN
9www.nidec-asi.com
Our engineering capabilities allow us to offer process-oriented solutions based on a systemsapproach in a wide variety of applications for oil & gas market. We supply our customers withbest-fit solutions which are tailored to their specific needs. Components are custom-designed
and manufactured based on Life Cycle Performance to reduce Total Cost of Ownership.
This kind of approach helps optimize capital investment costs (CAPEX) and life cycle costs(OPEX) maximizing reliability and safe operation of the equipment.
We support life time performance through tailored Service and Maintenance contracts.
Know-how and Project ManagementBest-Fit Solutions
PPT2013.01.01.02EN
10www.nidec-asi.com
NIDEC ASI works in closecollaboration with End Users,Engineering and OEM to help
reduce the Technical andCommercial risk on newprojects by conducting
feasibility studies as well asperformance tests and analyses
to validate the solutions wepropose.
Our Service Team is backed byour Engineering. In addition to24/7 assistance we work withEnd Users to identify custom
Maintenance programs. We canalso offer Remote Diagnostics
Programs and specializedservices for Predictive andPreventive Maintenance.
High Performance Rotating Equipment Solutions require expertise to optimize all 3
Technology competence Process Managementcompetence
Field Experience
3 - Service1 - Front End Engineering
Engineering & Dedicated ProjectManagement teams
Our engineering team continuesto work in close collaboration withEnd Users and OEM to optimizedesign for manufacturing in orderto guarantee the best-fit possiblebetween drive system and driven
equipment. Our ProjectManagement team providessupervision and proactively
works with customers to optimizeProject Schedules.
2 - Design & Manufacturing
Best-fit solutionsLife Cycle – from FEED to FINISH
25 years0 years
PPT2013.01.01.02EN
11www.nidec-asi.com
Best-fit solutionsPhase 1 – Front End Engineerig
Feasibility Study Output• General Description of Key Components(Motor, Drive, Transformers, Switchgear)
• Power Quality Analysis (Input/Output)• Reliability & Availablity Analysis• Limitations• Experience• Testing• Commercial Evaluation
General Description of MotorList of Deliverables
1. Motor Technical Data Sheet2. Motor Cross Sectional Drawing3. Motor Outline Drawing4. Equivalent Circuit of Motor5. Equivalent Circuit of Exciter6. Availability Analysis7. Torque Ripple Calculation8. Rotating Rectifier Design
Analysis9. Thermal Performance during
Starting10. Short-circuit Fault Calculations11. Quality Control Plan12. Functional Test Procedure
Motor active parts - cross section
PPT2013.01.01.02EN
12www.nidec-asi.com
ProjectDesign and engineering concept for the plant toprocess 7.5 million cubic metres of gas perannum using Frame 9E GE Turbines and 5years continuous operation
Initial Customer Concerns- Robust design (vibration and harmonics)- Gas flaring- Up-time
Best-fit solutions – Actual CasePhase 1 – Front End Engineering
Identify Redundancies to increase up-time.Failure risk analysis of key components to identifypotential causes of failure and ways to avoid them
Bearings can support high temp. (up to115°C), lessvibrations, robustness
Bearings definition and optimum operational conditionsspecifications
better compactness, stiffness and roboustness, less statorand rotor Joule losses, less thermal stress on insulationsystem, better exploitation of volume and materials, betterrejection to the “2x” exciting force coming from electricsupply, better rotor lateral dynamic behavior
4 pole Motor/Generator (60 MW peak power) instead of 2poles design
AdvantagesMain Innovations
PPT2013.01.01.02EN
13www.nidec-asi.com
Best-fit solutionsPhase 2 – Detailed Design & Construction
Customized Project Management (single point of interface)NIDEC ASI assigns dedicated Project Managment teams to work closely with End Users,Engineering and OEM throughout the project execution phase in order to optimize:
• Detailed Engineering• Quality Assurance• Production Procedures• Testing
Based on our experience we are able to propose solutions and methods which guaranteeperformance. We also have the flexibility to incorporate Customer requirements into ourQuality, Production and Testing procedures to increase confidence in final results.
PPT2013.01.01.02EN
14www.nidec-asi.com
Best-fit solutions – Actual CasePhase 2 – Detailed Design & Construction
Detailed Design• Base plates. Motor was designed with a triple base plateand positioning bolts. This reduces service intervention timefor eventual replacement from 7 to 2 days.
• During this phase our Engineering team worked with theEnd User and Engineering firm define redundancies in thepressurization system and identify materials (soundproofing,seals, bolts, etc…) to reduce risk of failure, assisting in cost-benefit analysis to optimize CAPEX
• They also worked with the OEM to conduct shaft-lineanalyses and optimize coupling to improve robustness of thetrain
Production procedures• NIDEC ASI’s Production Engineers designed and installed2 new clean areas for rotor assembly, defining methods andprocedures to guarantee rotor vibrational dynamics
Testing• To reduce technical risk, NIDEC ASI tailored the SystemTesting platform in our Monfalcone plant to perform a fullload back-to-back system test at 60 MW
Project managementNIDEC ASI designated 2 full time ProjectManagers to supervise the project. Byworking closely with the Main contractorand our internal Lean Manufacturing teamthey were able to optimize deliveryschedule to help recover delays from otherareas of the project (NIDEC ASI increaseddelivery from 1 machine to 2 machines permonth).
PPT2013.01.01.02EN
15www.nidec-asi.com
Global Service
Our customers rest assured that they’ll get an engineering staff capable of offering technicaladvice, qualified assistance and prompt intervention whenever they call. Remotemonitoring and diagnostics, telephone assistance, emergency call-outs, spare-partsmanagement and training are all part of our service, 24 hours a day, 7 days a week.
In addition to our permanent offices (shown below) we have a network of 25 service shops and servicecenters across the globe to serve you better
PPT2013.01.01.02EN
16www.nidec-asi.com
FPSOSHOWCASE – Angola, Saipem FPSO Gimboa
Scope of Supply:n.3 Soft Starters, Silcostart 600 L type, in
IP22 cabinet, air cooled, thyristortechnology, digital control, Class 1 (110%
overload for 60 s every 10 min), 6600Voutput voltage with by-pass switch;
The Saipem FPSO vessel Gimboa operatesin the Angolan Gimboa field.
The FPSO is designed to produce 60.000 bpdof crude oil and 60.000 bpd of water out ofthree production and four water injectionsubsea wells. The separated crude oil isstored on the vessel in cargo tanks with atotal capacity of 1.8 million barrels where itwill be kept for offloading.
The scope of Supply of NIDEC ASI has beenbeneficial like high reliability control andmonitoring system, ground switch for cabinetaccess in safety condition, total full loadconverter efficiency >98,0% (at rated power),voltage dip with continuous operation up to 80% of rated voltage with output reduced power.
PPT2013.01.01.02EN
17www.nidec-asi.com
Scope o Supply:n. 1 ET 630 L 4 for FPSO vessel, 1150kW, 6600 V, 60 Hz, 1785 r/min, 6250 kg
coupled with reciprocating pump;
FPSOSHOWCASE – Brazil, Petrobras FPSO Cidade de Sao Mateus
FPSO Cidade de Sao Mateus is one of theworld's largest and most complex convertedFPSOs.
The topside weight is approximately 20,000 tonsand it will have the capacity to produce 353Million Standard Cubic Feet per Day of gas aswell as 35,000 bpd of fluids. The gas will beproduced directly into pipelines, while theproduced oil will be stored in the hull, which hasa storage capacity of 700,000 bbl, and latertransported to shore by shuttle tankers.
Advantages derived from NIDEC ASI equipment:maximum quality, high reliability, precision andoptimal vibration performance, maximum runningeven in harsh enviromental conditions
PPT2013.01.01.02EN
18www.nidec-asi.com
Scope of supply:n.4 CR 710 X 8 3200 kW, 6600 V, 60 Hz, 893
r/min coupled with reciprocating compressor;n.1 CR 500 Y 8, 1050 kW, 6600 V, 60 Hz, 890
r/min coupled with reciprocating compressor;
FPSOSHOWCASE – South Africa, BlueWater FPSO Glass Dowr
The ’Glas Dowr’ is the fifth Bluewater FPSO ship.
The Glas Dowr’s main functions are: Receipt offluids from subsea wells, Control of the subseawells, Processing of the incoming fluids forseparation into crude, water and gas, storage ofthe stabilised crude oil and maintaining it at therequired temperature, Treatment of effluent fordischarge of water to the sea, Chemical injection,Provision of water injection facilities, Offloading ofcrude into “tandem moored” shuttle tankers,Power generation for process, gas export,offloading and utilities.
All systems are designed for a minimum annualaverage production up-time of 95%. All this ispossible thanks also to equipment provided byNidec ASI that allow high efficiency and reliability,minimum time required for mobilization,demobilization and transit, cost-efficiencies andtime savings.
PPT2013.01.01.02EN
19www.nidec-asi.com
Scope of supply:n. 1 three phase induction machineCRV 630 Y 6, 2200 kW, 6600 V, 1189r/min, coupled to thruster propeller;
n. 4 motors CRV 500 Y 8, 950 kW,6600 V, coupled to process pump;
FSRUSHOWCASE – Italy, OLT FSRU Livorno
The OLT Offshore LNG Toscana project provides forthe conversion of an LNG carrier (Golar Frost -Livorno) into a floating unit permanently anchoredabout 22 km off the coast, invisible from dry land,which will transform the liquid natural gas (LNG)back to its normal gaseous state.
The unit will be firmly anchored to the seabedthrough six anchors with a single rotation point atthe bow to permit the ship to move around theanchoring adapting to the weather and seaconditions with no impact to its activity.
At rated operations the unit will have a regasificationcapacity of 3.75 billion cubic metres a year (about4% of the national requirement), an averageregasification capacity of 11 million cubic metres aday and a storage capacity of 137,500 cubic metresof liquefied natural gas (LNG)
PPT2013.01.01.02EN
20www.nidec-asi.com
NGL SolutionsSHOWCASE – Qatar, Ras Laffan Re-injections Plant
Scope Of Supply:n.3 CR 1000 Y 4 – 13.7 MW 11 kV 50 Hz
dual shaft end for gas re-injectionscompressors
n.2 CR 900 X 4 9.6 MW Silcovert GN 2x 3300 V for NGL 4 & NGL 5
Ras Laffan Industrial City is the Qatar's main sitefor production of liquefied natural gas and gas-to-liquid.
In the desert (Ambient temperature +54°C) andin the maritime environment, structural integrity isvulnerable to wind blown sand and to saline of thesea, therefore the equipment had to be sealedagainst the elements and positioned in areaswhere they were least at risk.
NIDEC ASI supplied the right equipment and thebest solution, resolving the problems of itscustomers.
With wide range of products NIDEC ASI coversclient’s need. Client has single interface and canoptimize Service and spare parts.
PPT2013.01.01.02EN
21www.nidec-asi.com
Scope of Supply:15+7 2500 hp motors;
5 VFD (Silcovert H - PWM)
Oil Sands SolutionsSHOWCASE – Canada, Suncor Oil Sands
Suncor produces bitumen in the Canadian oilsands, which it expects to account for 90% of itstotal crude oil production.
Furthermore, Suncor has built the necessaryrefining capacity to convert the tar sands'synthetic oil into refined gasoline and oilproducts.This process allows the company tocapture the profits of the full hydrocarbon supplychain.
Suncor has refining capacity of 443,000 barrels ofoil equivalent per day (boe/day), with roughly halfof that capable of running on oil sand feeds.
By studying the solution with the customer andthe and existing technology (ChevronPhillips),NIDEC ASI was able to design a motor for directcoupling to the Slurry pump demonstrating a netenergy savings of 3- 5 % with respect to the useof a traditional 4 pole motor + gear box.
PPT2013.01.01.02EN
22www.nidec-asi.com
NIDEC ASI supplies a range of low, medium and high power solutions for pipelaying
operations, which ensure maximum control and efficiency in the transfer of fluid from the
fields up to collection points.
PipelinePower Solutions for pipelaying operations
PPT2013.01.01.02EN
23www.nidec-asi.com
The Micomeri 7000 was conceived in the mid 1980sas a multipurpose offshore oil platform installationvessel that would be able to install very large oilproduction platform decks (known as integrateddecks) as well as the decks' supporting structures(known as jackets) using its two very large fullyrevolving cranes.
It would also be able to support the offshorecompletion of the platform by providing hotel andworkshop facilities for large construction crews.Saturation Diving facilities would support subseaconnection work. The vessel's size and semi-submersible form would allow it to operate in worseweather conditions than smaller and conventionallyshaped vessels.
PipelayingSHOWCASE – Micoperi 7000 (now Saipem 7000)
In the oil & gas extraction process the needs evolve as enviromental conditions change. Themachines installed on Micoperi were revamped for Saipem 7000. This action, thanks to NidecASI equipment, allowed the owner to reach new depths in high sea, strengthening theproductivity of the pipe laying platform.
PPT2013.01.01.02EN
24www.nidec-asi.com
Scope of supply:
Main synchronous generators: n.9 GSCR 11 X 14, n.2 GSCR 10 X 14;
Emergency synchronous generators: n. 1 GSCB 560 W 8;
Asynchronous motors: 10 kV coupled with pums, n. 4 CR 630 X 12;
Synchronous propulsion motors + Silcovert S: n.2 MSCR 900 Y 6;
DC motors: n. 8 CH 800 SEKDV coupled with azhimutal propellers;
n. 6 CH 800 MEKD coup. with propulsion propellers, n. 31 CH 400 XDKR coup.with winches, n. 21 CH 400 LDK cranes, n. 13 CH 630 MCK cranes
PipelayingSHOWCASE – Micoperi 7000 (now Saipem 7000)
PPT2013.01.01.02EN
25www.nidec-asi.com
Scope of supply:n. 3 GSCT 800 Y 4, 5490 kVA, 10000 V,
50, Hz, 1500 r/min coupled with gasTurbine;
(Saipem 7000 semisubmersible crane & pipelaying)
PipelayingSHOWCASE – Russia, Blue Stream Project
Blue Stream is a major trans-Black Sea gaspipeline that carries natural gas from Russia intoTurkey
It is considered yet one of the deepest pipelines inthe world. It is laid in depths as low as 2.2kilometres (1.4 mi) which exceeds the averagedepths of well known subsea pipelines.
Advantages derived from NIDEC ASI equipment:laying operations performance up to 3000meters/day, high levels of reliability and precision inharsh enviromental conditions (deep waters,presence of corrosive elements and geologicalhazards), reduce mantenance costs.
PPT2013.01.01.02EN
26www.nidec-asi.com
Dolphin Energy, Qatar
Scope of supply:n.1 ET 710 V 2, 1765 kW, 6600 V, 50 Hz, coupled with centrifugal pump;n.5 CT 630 Y 4, 3500 kW, 6600 V,50 Hz, coupled with centrifugalcompressors;n.3 CT 630 Y 10, 1400 kW, 6600 V, 50 Hz coupled with centrifugal pump;
Advantages: maximum flexibility, robustness and reliability in harsh enviromental conditions
IPL, Canada (Edmonton)
Scope fo supply:Oil pipeline - motors coupled with centrifugal pumpn. 1 CB 500 Y 4, 1865 kW, 4000 V, 60 Hz, 1865 r/min;n. 16 W 500 Y 2, 1865 kW, 4000 V, 60 Hz, 3580 r/min;n. 4 W 560 X 2, 2240 kW, 4000 V, 60 Hz, 3582 r/ min;n. 9 W 500 Y 2, 2051 kW, 4000 V, 60 Hz, 3582 r/min;n. 7 W 560 X 2, 2423 kW, 4000 V, 60 Hz, 3582 r/min;n. 3 W 500 Y 2, 2612 kW, 4000 V, 60 Hz, 3582 r/min;Gas pipeline - motors coupled with centrifugal compressorn. 12 W 630 X 4, 3750 kW, 4000 V, 60 Hz, 1787 r/min
PipelineSHOWCASE
PPT2013.01.01.02EN
27www.nidec-asi.com
PipelineSHOWCASE : High Speed Solutions for pipeline applications
Transco - USA
Gas Pipeline
The Transco pipeline quietly, safely and reliablydelivers natural gas to its customers through its10,200-mile pipeline system, extending from SouthTexas to New York City.
Its compressor stations help move gas from the GulfCoast to 12 Southeast and Atlantic Seaboard states,including major metropolitan areas in New York, NewJersey and Pennsylvania.
The scope of Supply of NIDEC ASI wants improveefficiency, in terms of high performance in hazardousareas, higher efficiency, reliability and safety, lowernoises, lower mantenance costs (> 10 yearscontinuous field operation demonstrated), smallersize compared to conventional motors
Scope of supply:n. 2 induction machine HSCB 560 Y 2,
5220 kW, 3200 - 5500 r/min, 4530 V - 820A – 92 Hz, totally enclosed pipeventilated, type of protection:
pressurised, coupled with centrifugalcompressor;
n.2 induction machine HSCB 560 Y 2,5220 kW, 3200 - 5500 r/min, 4600 V –
800 A – 92 Hz, coupled with centrifugalcompressor;
n. 2 HSCB 710 Y 2 motors 8955 kW,7300 r/min, 7800 V, coupled with
centrifugal compressor;
PPT2013.01.01.02EN
28www.nidec-asi.com
PipelineSHOWCASE : High Speed Solutions for pipeline applications
Petrocanada – Canada
Scope of supply:n.1 synchronous machine MSCR 900 Y 2, 11200 kW(15000hp), 4100 – 5000 r/min, 2 x 4400 V – 2 x 850 A– 75 Hz – dual winding, totally enclosed water cooled,type of protection: pressurised, coupled with centrifugalcompressor;
Advantages: high performance and maximumflexibility in hazardous areas, higher efficiency,reliability and safety, lower noises, maximum flexibility,robustness and reliability in harsh enviromentalconditions, lower mantenance costs (> 10 yearscontinuous field operation demonstrated), smaller sizecompared to conventional motors
PPT2013.01.01.02EN
29www.nidec-asi.com
LNG SolutionsSHOWCASE – Russia, Sakhalin Island LNG Plant
Sakhalin is a large Russian island in the NorthPacific and is crossed by the one most importantpipeline of Russia.
The strong cold and the other extreme weatherconditions, constantly wear out the electrical andmechanical equipment of the pipeline
Due the site conditions, NIDEC ASI provided thebest solution for the customer, choosing the criticalcomponents to guarantee proper performanceat -50°C.
Technology: Shell / JGC
Scope Of Supply:n.2 21 MW LCI drives Silcovert Sn.2 motors plus 4 MW fixed speed
motors for Overhead StabilizerCompressors
PPT2013.01.01.02EN
30www.nidec-asi.com
Damietta, Egypt
LNG SolutionsSHOWCASE – Egypt, Damietta
Technology: ENI / Maire Tecnimont
Scope of Supply:34.8 MW @ 1650 r/min using LCI
drives Silcovert S; (2 x 5600 V) forFeed Gas Compressors
The output capacity of the Damietta LNG plant is 5million tons of LNG per year.
The complex includes the LNG liquefaction train, inletgas reception area, natural gas liquids removal andfractionation area, a docking jetty for tanker loadingand transportation, LNG refrigerated storage andexport facilities, gas metering and treatment facilitiesrefrigerant condensate and LNG storage (two 150,000m³ PC LNG storage tanks).
The equipment provided by NIDEC ASI hasguarantee high efficiency and reliability for maximumplant uptime; using electric drive helps reduce harmfulgas emissions.
PPT2013.01.01.02EN
31www.nidec-asi.com
Oil and gas refineries are trying to increase their production. In this evolving market timing of
operation, availability and safety are clear key points for suppliers of automation systems. Our
products are conceived to make the process more rapid and optimize refining process.
We are working to develop equipment that will enable the oil and gas refineries around the
world to produce reliable petroleum products with lower cost.
RefineriesElectric power solutions for refining process
PPT2013.01.01.02EN
32www.nidec-asi.com
Scope of supply:
Motors, generators & drive systems
Power range: 116-17000 kW, coupled with screw, centrifugal andreciprocating compressors;
Power range: 80-2650 kW, coupled with pumps, centrifugal andreciprocating pumps;
Power range: 300-20700 kW, coupled with steam, gas turbinesbase, gas turbine starting mot.;
Power range: 200-1000 kW, coupled with fan and centrifugal fan;
Power range: 350-450 kW, coupled with air blower;
Advantages: maximum performance in terms of power, reliability, manteinace costs, flexibility and maximum precisionin processing operations.
RefineriesSHOWCASE
PPT2013.01.01.02EN
33www.nidec-asi.com
RefineriesSHOWCASE: High speed solutions for refining process
Chevron El Segundo - California
Gas Chemical Complex
The El Segundo Refinery covers 1,000 acres,has more than 1,100 miles of pipelines, and iscapable of refining 285 thousand barrels ofcrude oil per day.
The refinery is designed to ensure that thetransportation fuels produced meet theperformance expectations, are delivered ontime, and are manufactured safely and in anenvironmentally sound way
The scope of Supply of NIDEC ASI wantsimprove this efficiency, in terms of Optimumpower quality, reliability and optimumperformance, reduction of power losses in thedrive system, large range of ratings and speeds,no air pollution, lower manteinace cost.
Scope of supply:n.3 induction machines, HSCR 450 Y 2, 2610 kW(3500 hp), 8350 - 11130 r/min, 2800 V – 135 A –
186 Hz, totally closed water cooled, type ofprotection: pressurized, coupled with centrifugal
compressor;
PPT2013.01.01.02EN
34www.nidec-asi.com
RefineriesSHOWCASE: High speed solutions for refining process
Scope fo supply:n. 2 CR 800 X 2, 4800 kW, 13200 V, 60 Hz,
3586 r/min, coupled with centrifugalcompressor;
Rio Polìmeros - Brazil
Gas Chemical Complex
Rio Polímeros is the Latin America's largestintegrated gas-based chemical site and isone of the main polyethylene producers inBrazil.
The complex is able to produce 520,000tpaof ethylene, which is used as feedstock for apolyethylene unit with a capacity of540,000tpa. 75,000tpa of propylene is alsomade at the site.
NIDEC ASI, with its scope of supply, hashelped to achieve these results, fullycomplying the requirements and wishes ofhis client.
PPT2013.01.01.02EN
35www.nidec-asi.com
Scope of Supply:4 MSCR 1000 Z 4 - 17 MW, 11 kV soft starter
w/PWM Drive coupled to Siemens PGICompressors.
GTL SolutionsSHOWCASE
Sasol – South Africa
Technology: Sasol GTL Process
The Sasol Slurry Phase Distillate™ process(SPD™ process) transforms natural gas intoa range of high-quality, high-value energyand chemical products.
The liquid fuels produced through the GTLprocess are high-performance, low-emissionproducts that deliver significant air qualityadvantages.
The SPD™ process is at the core of Sasol’sGTL technology. NIDEC ASI was able toassist customer with Front End Engineeringand Design Development to implement thenew process technology on this project.
PPT2013.01.01.02EN
36www.nidec-asi.com
Drive & System Testing Capabilities
NIDEC ASI provides reliable, safe and tested solutions for oil & gas applications. Our qualityassurance program covers all aspect of design, material procurement,
manufacturing and testing. This program meets the requirement of internationalstandards such as ISO 9001.
In order to meet the challenges of de-risking large powered motors we provide full load systemtesting in back-to-back configuration, at our Monfalcone Italian facility, up to 75 MW.
All the machines manufactured in our plant undergo individual and complete routine tests.Special test can be performed and will be quoted upon request.
PPT2013.01.01.02EN
37www.nidec-asi.com
10 good reasons to choose NIDEC ASI
• Considerable experience in applications for oil&gas market
• Tailor-made solutions
• Standard modular components
• equipment and service with maximum reliability
• “In-house” technology
• Single source supplier for electric power & propulsion systems
• Full responsibility from design to commissioning
• Cost-effective solutions
• Wide range of pump and compressor solutions
• Worldwide Customer Service and Support
Partnering with experience
PPT2013.01.01.02EN