Former NAS Moffett Field
Hangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action Update
Bryce Bartelma, PGNavy BRAC PMO West
July 14, 2011RAB Meeting
1
Presentation Overview
P j t Obj ti• Project Objective• Progress Update
Continued Monitoring Roof Redwood Siding & Continued Monitoring and Protection Measures
Historic Mitigation
Roof, Redwood, Siding & Window Removal
Washing & CM15 Coating Additional Removal Historic Mitigation
Scaffolding Installation
• Schedule
Additional Removal Action Activities
• Questions
2
Project Objective
• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)(December 2008)Demolition of interior structuresRemoval of contaminated sidingRemoval of contaminated sidingApplication of weather-resistant coating to steel frame
3
Continued Monitoring and Protection Measures
• No observed impacts to biological activityactivity
• Continued storm water and ground surface protectionp
• Navy and NASA air monitoring data demonstrates control of air emissions
4
Historic Mitigation
M C B k t (8)Man Crane Baskets (8)
Corrugated Windows (up to 25)
5
g ( p )
Hangar 1 Interactive CD
• Currently in final production with copies to be made available in the coming monthsavailable in the coming months
6
NASA and SHPO Site WalkNASA and SHPO Site Walk
• June 7, 2011June 7, 2011• ~30 people to observe
progress and discuss re-use
7
Scaffolding InstallationScaffolding Installation
8
Mansard Panels, Redwood, Silver SidingMansard Panels, Redwood, Silver Sidingand Window Removaland Window Removal
• Mansard panels removed inMansard panels removed in Zone 1
• Initiated redwood removal at f ith il idi droof with silver siding and
windows to follow
9
Washing & Coating Washing & Coating –– CarbomasticCarbomastic 1515
• ~98% complete with Zone 1 washing and coating• Initiated washing in Zone 2• Navy representatives Quality Assurance (QA) inspection
of coating from roof to floorof coating from roof to floor
10
Washing & Coating Washing & Coating –– CarbomasticCarbomastic 1515
11
Additional Removal Action Activities
• Clam Shell Door Mechanisms– NASA and SHPO requested cleaning, partial coating,
and wrapping for NASA’s future re-use
12
Additional Removal Action Activities
• Permanent access to• Permanent access to Federal Aviation Administration (FAA)
i d f brequired roof beacon
13
Additional Removal Action Activities
• Recognition Lunch for over 365 days and 70,000 man-hours without a recordablerecordable incident or injury!!
14
ScheduleSchedule
• Fieldwork in zones 1 – 6 OngoingC l t fi ld k• Complete fieldwork, confirmation sampling and demobilize Spring 20122012
• Submit After Action Completion Report p pSummer 2012
15
Questions?