16
Former NAS Moffett Field Hangar 1 Removal Action Update Hangar 1 Removal Action Update Hangar 1 Removal Action Update Hangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West July 14, 2011 RAB Meeting 1

Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Embed Size (px)

DESCRIPTION

Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Citation preview

Page 1: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Former NAS Moffett Field

Hangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action Update

Bryce Bartelma, PGNavy BRAC PMO West

July 14, 2011RAB Meeting

1

Page 2: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Presentation Overview

P j t Obj ti• Project Objective• Progress Update

Continued Monitoring Roof Redwood Siding & Continued Monitoring and Protection Measures

Historic Mitigation

Roof, Redwood, Siding & Window Removal

Washing & CM15 Coating Additional Removal Historic Mitigation

Scaffolding Installation

• Schedule

Additional Removal Action Activities

• Questions

2

Page 3: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Project Objective

• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)(December 2008)Demolition of interior structuresRemoval of contaminated sidingRemoval of contaminated sidingApplication of weather-resistant coating to steel frame

3

Page 4: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Continued Monitoring and Protection Measures

• No observed impacts to biological activityactivity

• Continued storm water and ground surface protectionp

• Navy and NASA air monitoring data demonstrates control of air emissions

4

Page 5: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Historic Mitigation

M C B k t (8)Man Crane Baskets (8)

Corrugated Windows (up to 25)

5

g ( p )

Page 6: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Hangar 1 Interactive CD

• Currently in final production with copies to be made available in the coming monthsavailable in the coming months

6

Page 7: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

NASA and SHPO Site WalkNASA and SHPO Site Walk

• June 7, 2011June 7, 2011• ~30 people to observe

progress and discuss re-use

7

Page 8: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Scaffolding InstallationScaffolding Installation

8

Page 9: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Mansard Panels, Redwood, Silver SidingMansard Panels, Redwood, Silver Sidingand Window Removaland Window Removal

• Mansard panels removed inMansard panels removed in Zone 1

• Initiated redwood removal at f ith il idi droof with silver siding and

windows to follow

9

Page 10: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Washing & Coating Washing & Coating –– CarbomasticCarbomastic 1515

• ~98% complete with Zone 1 washing and coating• Initiated washing in Zone 2• Navy representatives Quality Assurance (QA) inspection

of coating from roof to floorof coating from roof to floor

10

Page 11: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Washing & Coating Washing & Coating –– CarbomasticCarbomastic 1515

11

Page 12: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Additional Removal Action Activities

• Clam Shell Door Mechanisms– NASA and SHPO requested cleaning, partial coating,

and wrapping for NASA’s future re-use

12

Page 13: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Additional Removal Action Activities

• Permanent access to• Permanent access to Federal Aviation Administration (FAA)

i d f brequired roof beacon

13

Page 14: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Additional Removal Action Activities

• Recognition Lunch for over 365 days and 70,000 man-hours without a recordablerecordable incident or injury!!

14

Page 15: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

ScheduleSchedule

• Fieldwork in zones 1 – 6 OngoingC l t fi ld k• Complete fieldwork, confirmation sampling and demobilize Spring 20122012

• Submit After Action Completion Report p pSummer 2012

15

Page 16: Moffett Restoration Advisory Board Hangar One Update July 14, 2011

Questions?

Point of Contact:

Scott Anderson, P.E.BRAC EnvironmentalBRAC Environmental

Coordinator(619) 532-0938( )

[email protected]

16