DPR plant characteristics - High economic efficiency - Short-term of investment return (2 months or more) - Ecological safety - Reliable operation

Citation preview

Page 1: Modular Enrichment Plants
Page 2: Modular Enrichment Plants

DPR

«Development. Projects. Realization»

Modular Enrichment Plants

Page 3: Modular Enrichment Plants

Technogenic fields

Activities of Mining-and-Metallurgical Industry (MMI) lead

to formation of waste – gigantic technogenic fields,

which contain a valuable concentrate:

- chrome- manganese

- nickel

- iron- copper

- coal- rare-earth metals

Page 4: Modular Enrichment Plants

The highly-profitable possibilities

The natural resources are exhausted while quantity of

the technogenic fields is increasing.

Modern enrichment* complexes allow to extract a

valuable concentrate with a prime cost from $4 for ton.

For example:

With a market value of ferrochrome from $1000, the profitable of mining is 4800%

ConcentrateWorld-market value for ton

Prime cost of enrichment for

ton

Enrichment`s profitability

Coal $50 - 150 $12- 15 576%

Ferrochrome $1097 - 3600 $40 - 50 4800%

Ferromanganese $1300 - 2700 $45-55 4000%

Iron ore from $130 $4 - 6 2600%

*Ore enrichment is a set of methods of separation of metals and minerals from each other with a difference in their physical and/or chemical properties

Total investment to build the plant is about $ 2,5 million

The payback period is 2 months

Page 5: Modular Enrichment Plants

Extra resource

these piles cover huge areas and cause serious ecological threat

by:

• Disengaging harmful and poisonous substances permeating

ground waters;

• Frequent occurrence of fires*.

* A single burning pile disengages an average of 10 t carbon oxide, 1.5 t sulfurous

anhydride and a considerable amount of other admixing gases.

The investor can get financing and administrative support because

Page 6: Modular Enrichment Plants

High-profitable Business

1. Original material:

- % of valuable concentrate

- quality of concentrate

(physical and chemical properties)

- volume of concentrate stocks

- concentrate market cost

2. Enrichment technology:

- % of concentrate extraction

- extraction prime cost

(electricity, water, work and other)

- complex productivity

3. Logistics:

- site location (transport infrastructure)

- communications

- effinciency of equipment exploitation (loaders, dump-trucks)

4. Manufacturing organization:

- administrative support

- personal training

- continuity of work

- terms of building

- distribution system

The following related factors influence on general profitability of business:

Page 7: Modular Enrichment Plants

Stages of realization complex solution

1. Exploration

- stock evaluation - concentrate analysis - locality rating

2. Technology engineering - technology choice - productivity calculation 3. Enterprise projection - production - infrastructure - logistics - communications

4. Building - paperwork - equipment production - construction

5. Starting- adjustment - personal training - complex adjustment - optimization of equipment work

6. Commissioning - service organization - project completion

Page 8: Modular Enrichment Plants

DPR enrichment plants

The DPR designs modular enrichment plants and performs a complete the whole cycle of works at

all project implementation stages:

• Object survey: sampling, determining an enrichment technique;

• Calculation of economical efficiency;

• Providing for attraction of investments;

• Complete set of development works;

• Construction of plant;

• Personnel preparing and training;

• Logistics system establishment;

• Commissioning;

• Product distribution system establishment;

• Establishment of service and maintenance

department;

Page 9: Modular Enrichment Plants

Enrichment by gravitational jigging

The available experience shows that enrichment by gravitational jigging may be efficient for the

following raw materials:

• Coal

• Coal gob piles

• Piles from metallurgical works

• Manganese ore

• Chromium ore

• Piles of ferromanganese and ferrochrome

• Vermiculite

• Placer deposits (gold, titanic ores, etc.)

• Iron ore

• Diamonds

Page 10: Modular Enrichment Plants

The objects of Modular Enrichment Plants

Page 11: Modular Enrichment Plants

DPR plant characteristics

1. High economic efficiency

2. Short-term of investment return (2

months or more)

3. Ecological safety

4. Reliable operation

Page 12: Modular Enrichment Plants

Advantage of dealing with DPR

We undertake responsibility for complete set

of works, thus ensuring maximum efficiency at

each stage.

This significantly reduces the time of launch

production and increases profitability the

customer`s investment.

«We put your idea into result within 4 months»

Page 13: Modular Enrichment Plants

Equipment

• As part of the project enrichment by

gravity jigging, the complexes are

equipped with production equipment

by NPP “Gravikon” (Lugansk,

Ukraine).

Page 14: Modular Enrichment Plants

GRAVICON Modular Complexes

• The Gravicon Modular Complexes are

designed to enrich the dumps of non-

ferrous metals, coal heaps and also small

deposits of mineral resources.

Source product output — 50, 100, 200 t/h

Extraction of source raw material concentrate

— up to 99%

Page 15: Modular Enrichment Plants

Advantages of GRAVICON Complexes

• High efficiency of separation;

• May be installed on unorganized areas,

near the object;

• Complete automation of all works by

complex;

• Low energy consumption

• Low operational costs.

Page 16: Modular Enrichment Plants

Experience

In the Republic of Kazakhstan successfully function:

• Aktobe, Aktiubinsky Ferrous Alloys Plant, ”JSC

«TNK KazKhrom»: 1set – 50 t/h, 2002

• 1set – 70 t/h, 2006, (slugs)

• Aksu, 2 sets – 70 t/h, 2011, (ferrochrome)

• Karaganda, ”Arman-100”:

• 350 t/h (enrichment of manganese ores)

• Republic of Guinea, Africa: enrichment complex –

30 t/h, (gold, diamonds)

• Republic of Liberia, Africa: enrichment complex –

50 t/h, (gold, diamonds)

Other countries:

Page 17: Modular Enrichment Plants

DPR «Development Projects Realization»

Design and Engineering Center for Complex Construction of Industrial facilities.

Central Office in Ukraine:

Kiev, Poltavskaya Str., 9

+38(044) 484-12-62

[email protected]

www.dpr.biz.ua

Representative Office in Kazakhstan:

Almaty, Aouezova Str., 14a,

BC “Bereket”, 13 floor

+7(701) 959-97-91

+7(727) 356-23-2

[email protected]