POWER QUALITY MANAGEMENT
Iskra Power Quality Systems
MiSMART
WEB based application comprised from● Push Data Collector● Database● Client
Operating system independent software● MiSMART vs SCADA● Not real time (except alarms)● Data lossless operation● Scalable and user-friendly● SMS and e-mail alarm notification
Standard SQL database● It can be used without the software solutions
Introduction
MiSMART
MiSMART Configuration Tools● Device data configuration● Setting up the system grid structure● User management
MiSMART Data Monitor● Measurement monitoring● Alarm monitor● Basic statistical functions● EN50160 power quality support● Table and chart data reviewing● Exporting data into Excel● Filtering relevant data from the grid● Data comparison from different meter points● Virtual metering points
Key functionalities
MiSMART
● Analysis of power quality in the grid for later corrective measures● Cost savings due to faster response to outagesfor better maintenance● Energy savings after corrective measures have been implemented● Historical data for better planning● Proactive equipment protection● More reliable grid operation● Better control of power theft and power losses in the network – this will especially be obvious when more sites are equipped with PQ analysers
Benefits
Business case – Elektro Gorenjska
● Utility company operating MV and LV infrastructure● 87.000 customers● 1333 MV/LV transformer stations● 14 HV/LV transformer stations● WiMAX, GPRS & ethernet communication● Project in operation for 2 years
Facts about the company
Business case – Elektro Gorenjska
Communication infrastructure:● WiMAX, GPRS, Ethernet● over 280 locations with (and growing)
Measurements:● Up to 60 measurements from each device● Sampling time from 1 to 10 minutes
Technical facts about the project
Alarms:● voltage interruption● voltage high/low● frequency high/low● current high
Additional monitored signals:● Temperature –analogue signal● Intrusion detection –digital signal
Business case – Elektro Gorenjska
● Remote and centralized measurement monitoring (Energy, active power, reactive power, currents, voltages, phase angles, maximal period values, minimal period values) ● Remote and centralized alarm monitoring in real time● PQ parameter monitoring according to EN50160 on 19 locations● Real time information on the operation of installed equipment● Excel and PQDIF data export capability for regulator reporting● Better and faster maintenance planning according to historic data offered by the system● Quicker response to failures as well as failure analysis● Better supervision over energy losses within the power grid by comparing consumption data with the one of the billing system ● SCADA system integration over the IEC 60870-5-104 protocol
Key user benefits