Help, I’m stuck in a Scrum project!

5-15 people

System test within and outside the team

Skilled and less skilled scrum masters

Skilled and less skilled product owners

No or low requirements on documentation

Page 2: Linda Hoff - Help, I'm Stuck in a Scrum Project! - EuroSTAR 2010

Does Scrum make you dumb?

Page 3: Linda Hoff - Help, I'm Stuck in a Scrum Project! - EuroSTAR 2010

Don’t write a test plan!

• What to test and not to test Story/Done/How to demo

• Test environment Activities in sprint backlog + separate doc

• Test data Activities in sprint backlog + separate doc

• How to test Sprint planning + test case descriptions

• Start criteria Daily build and approved unit tests

• Acceptance criteria Done/How to demo

• Result (what documents should be delivered) Activities in sprint backlog

• Time plan Sprint planning

• Organization Sprint planning

• Problems and risks Sprint planning + separate doc

• What to test and not to test

• Test environment

• Test data

• How to test

• Start criteria

• Acceptance criteria

• Result (what documents should be delivered)

• Time plan

• Organization

• Problems and risks

Page 4: Linda Hoff - Help, I'm Stuck in a Scrum Project! - EuroSTAR 2010

Story

Test case

Prio X

Test case

Prio X

Test case

Prio X

Bug report

Bug report

Bug report

Bug report

Bug report

board including

product

owner

To be fixed

Scope out from

the sprint

Put in product backlog

- Connect to a user story

- Bug report story

- Time box

Devide testing per story

Page 5: Linda Hoff - Help, I'm Stuck in a Scrum Project! - EuroSTAR 2010

Daily build with approved unit tests Version control &

tracebility

System test

Stability test

etc

Function test

Simultaneous test and development!

Page 6: Linda Hoff - Help, I'm Stuck in a Scrum Project! - EuroSTAR 2010

Do the same thing as before but in a slightly different way

Summary

[email protected]