INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
PICTORIAL PRESENTATION OF FIRST STAGE VISIT OF INDEPENDENT SUPERVISOR
LAGOS STATE
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12: The headquarters of the LCDA in Ikeja LG where the MDGs-CGS projects are located
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12, at the chairman’s office in Onigbongbo LCDA in Ikeja LG, L-R: Mr Padonu (Council Engineer), Dr. Oyeyemi (Independent Consultant), Mr. Toviho (TA), Hon
Wale Odunlami (LCDA Chairman)
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12: Work in progress, Rehabilitation of 1 block of classrooms at Community Primary School Wasinmi, Ikeja (LG/IK/044). Old roof removed, old wall being
demolished
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12: Work in progress, Rehabilitation of 1 block of classrooms at Community Primary School Wasinmi, Ikeja (LG/IK/044). Hard core for the
new wall
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Renovation of a 2-storey block at Central Primary school Ikeja (LG/IK/043): old window frames removed
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Renovation of a 2-storey block at Central Primary school Ikeja (LG/IK/043): The Council Engineer (Mr. Padonu) discussing with the foreman
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Rehabilitation of Beko-Ransome Kuti PHC (LG/IK/057). Old roof removed
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Rehabilitation of Beko-Ransome Kuti PHC (LG/IK/057). Old roof removed
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombo health post with water source & water treatment plant (LG/EO/004).
Construction at DPC substructure/ DPC level
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombo health post with water source & water treatment plant (LG/EO/004). Construction at DPC
substructure/ DPC level
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombo health post with water source & water treatment plant (LG/EO/004). Hard
core for the water treatment plant.
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Barr Mukandasi Ogidan (LCDA Chairman), Dr. Oyeyemi (Consultant), Mrs. Rosiji (Council Manager/LG contact), Mr.
Douglas (TA)
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Mr. Douglas (TA), Dr. Oyeyemi (Consultant), Mr. Adeleye (Council Engineer)