Page 1: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Micro Hydro Project For Rural Electrification

MOHD FAUZI ISMAIL GENERAL MANAGER

RENEWABLE ENERGY RESEARCH CENTRE SIRIM

Page 2: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Presentation Outlines

• Malaysia’s Micro Grid & Rural Electrification

• Micro Hydro

• SIRIM’s Experience in Micro Hydro Projects

• Project Pre-Feasibility Study

• Project Implementation

• Other RE Projects For Community.

• Conclusion

Page 3: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Malaysia Micro Grid & Rural Electrification

Page 4: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Hydropower in SEA Source: World Small Hydropower

Development Report 2013

Page 5: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Rural Electrification.

Source: KKLW & Pemandu

Page 6: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

People in rural and remote regions are acquiring improved access to energy in three ways: (1) at the household level, using isolated devices and systems for power generation, heating, and cooking; (2) through community-level mini-grid systems; (3)through grid-based electrification, where the grid is extended beyond urban areas.

Rural Electrification

Page 7: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Malaysia Micro Grid Market.

1. The MicroGrid Market is driven by rural electrification projects in Sabah and Sarawak.

2. Rural areas have bad road connectivity which makes it tough to obtain right of way for constructing transmission lines, thus making it favorable for establishing Microgrid with RE.

3. Some several remote villages are powered by diesel generator; high electricity production cost and diesel transportation issues.

4. Sabah and Sarawak can rely on potential RE resources such as Solar, Hydro, Biomass and Wind.

Page 8: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Cont..

Restraints:

1. Scarcity of skilled labor for the smooth running of microgrids

2. Acquiring unregistered land for building the projects

3. Transportation issue while constructing at remote sites with no road connectivity

4. High Capital cost discouraging private parties to own a micro grid.

Page 9: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

In many rural areas of developing countries, connections to central electric grids are economically prohibitive and may take decades to materialise, if at all. Moreover, grid connectivity does not address the need for access to sustainable heating and cooking options. Renewable energy systems offer an unprecedented opportunity to accelerate the transition to modern energy services in remote and rural areas, by increasing access to sustainable cooking and heating devices; affordable lighting, communications, and refrigeration; improved public health.

The utilization of renewable energy in rural area.

Page 10: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Rural Electrification: Solar Hybrid

Source: KKLW & Pemandu

Page 11: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

MICRO HYDRO

Page 12: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Type / size Electricity Generation

Big Hydro > 100 MW (grid connected)

Small Hydro 1 MW – 100 MW

Mini-hydro 100 kW – 1000 kW

Micro-hiydro 5 kW – 100 kW

Pico-hydro < 5k W

Classification of Hydro System

Page 13: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Micro-Hydro Power(MHP)

Clean and

renewable

Page 14: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Beneficial for rural electrification and rural economy development .

Higher energy payback ratio (Energy output/ Energy consume), less

land requirement and gas emission

Type of energy Energy payback

ratio Land requirement

(km2/TWh) Gas emission

(KT.eq.CO2/TWh)

Hydropower (run-

of-river) 267 0.1 1

Hydropower (reservoir)

205 152 15

Wind power 39 72 9

Photovoltaic 9 45 13

Nuclear 16 0.5

Conventional thermal

5-11 4 974

What are the manifold benefits of SHP?

Page 15: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Rich resources, widely spread;

Renewable, decentralized, simple and well-developed technology;

Cost-effective energy

Generation Technology

Invested Cost Generation Cost

International ($/kW)

China (Yuan/kW) International

(¢/kWh) China (RMB cent/kWh)

Small hydro 800-6,000 6,000-10,000 4-10 5-10

Large hydro 4,000-5,000 2-8

Wind power 1,000-2,000 9,000-12,000 5-13 40-50

Photovoltaic 20,000-30,000 25-125 100-300

What are the manifold benefits of SHP?

Cost comparison of renewable energies

Page 16: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

SIRIM’S EXPERIENCE IN MICRO HYDRO

Page 17: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

SIRIM Micro Hydro System: 3 Locations

Kg Sri Stamang 2, Lubok Antu, Sarawak (18.3kW)

Lembah Temir, Raub, Pahang (15.5kW)

Kg. Libang, Tambunan Sabah (5kW)

Page 18: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

System Developed by SIRIM

Page 19: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Micro Hydro at Kg Sri Stamang 2

Page 20: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Another Project For an Eco Resort

Page 21: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Project Pre-Feasibility Study

Page 22: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Pre-Feasibility Study

1. Hyrology To ensure micro hydro system is able to operate in sustainable manner. Studies include: I. Dependable Discharge II. Flood Discharge III. Catchment Area IV. Potential Energy

Page 23: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Pre-Feasibility Study

i. ‘Dependable Discharge’ to determine the type of turbine and civil structure.

Page 24: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Pre-Feasibility Study

ii. ‘Flood Discharge’ to determine suitable location for civil structure from flood prone area.

Page 25: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

PreFeasibility Study

iii. ‘Catchment Area’ to ensure continuous supply of water.

Page 26: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Prefeasibility Study

iv. Potential Power; To determine suitable design of civil structure for optimum micro hydro power..

Page 27: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Prefeasibility Study

2. Socioeconomic Study Structure of Community, quality of life and its relationships

Settlement Growth Mobility

Interrelationship between, social, culture, environment and economy.

Culture Social Processes Hierarchy in community Household economy

Page 28: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Design and Construction Study.

Civil & Structure: i. Intake weir and settling

basin ii. Water Channel iii. Forebay tank iv. Penstock v. Power House Electro-mechanical: i. Turbine ii. Generator Elektrical & Transmission i. Control Unit ii. Poles iii. Transmission Cables

1. Micro Hydro Components

Page 29: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

2. Selection of appropriate Technology and type of Turbine. Pelton Francis Turgo Cross-flow Multi-jet pelton Kaplan Propeller

Design and Construction

Page 30: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

OPERATION AND MAINTENANCE …Community Support

• Operation Module. • Training for Maintenance • Collection of fund to support sustainable operation of

micro hydro system.

Page 31: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

PROJECT IMPLEMENTATION

Page 32: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Kampung Sri Stamang 2

Page 33: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Micro-hydro Project by SIRIM

Kampung Sri Stamang 2, Lubok Antu, Sarawak

‘Rumah panjang’ + Klinik Desa (~ 240 orang)

Location: Sungai Ubo

Power Generation: 18.3 kW

Type of Turbine: Crossflow

Construction: Okt 2010 – July 2011

Commissioning Date: 29 February 2012

Page 34: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Logistic: Kg Sri Stamang 2

Page 35: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Overall Project Layout:

Page 36: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Under Construction..

Page 37: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Power House.

Page 38: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Project Completion..

Page 39: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Benefits • Community can now rely on 24 hrs of cheap

and sustainable source of energy.

• Community can sustain the operation and maintenance through training and villager’s participation.

• Due to difference in electricity load requirement, nearby clinic benefits from Micro Hydro project..

Page 40: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

Other RE Projects For Community

Page 41: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification
Page 42: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification
Page 43: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification
Page 44: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

• This is a 10kW capacity Project. It is divided into two systems; 5kW using thin film module and another 5 kw using mono crystalline module.

• Both systems have been completed and fully installed

• This project has received quota of SEDA at RM 1.20 per kwh

• Commercial start of date(NCOD) starting on 7 December 2014

• REPPHA application has been applied with the TNB for purchase agreement between the owner and the TNB

• Testing and commissioning were carried out after the installation of TNB solar PV meter.

Page 45: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

CONCLUSION

• RE will continue to play important roles towards rural electrification, especially in Sabah and Sarawak.

• Micro Hydro provides sustainable form of energy for community.

• Other RE ; Solar, Wind may also be considered for remote island communities.

Page 46: Kuching | Jan-15 |  Micro Hydro Project For Rural Electrification

THANK YOU FOR YOUR ATTENTION