1
Engineering + Ecology + Creativity
Turning Stormwater Challenges Into Community Benefi tsKansas City’s Green Solutions Pilot Project
May 2012
2
Blending Sound Engineering with EcologyURS Green Solutions Kansas City has helped clients solve problems by integrating
engineering and ecology for decades and has real world, “dirt under the fi ngernails”
experience in both municipal and industrial applications. Projects have ranged from
bioengineering for streambank restoration to rain gardens for CSO control (below) to
industrial stormwater treatment wetlands.
Streambank restoration, bioengineering
Constructed wetland designed to remove nutrients
Thought Leaders
Engineering + Ecology + Creativity
Urban Raingarden For CSO Controls
3
Kansas City’s Green Solutions Pilot ProjectThe Middle Blue River Green Solutions Pilot Project is using green infrastructure to
reduce CSOs while helping revitalize an urban neighborhood. The project is testing
the technical eff ectiveness, constructability, and cost-eff ectiveness of 150 BMPs
retrofi tted into a residential and commercial neighborhood. Construction includes
73 raingardens, 39 bioretention gardens, 36 curb extensions, a bioswale, tree planters,
below-grade storage systems, and over 5,000 feet of porous sidewalk.
Below-grade storage is hidden beneath a rain garden
Porous sidewalk soaks up stormwater and reduces winter icing
Turning Problems into Opportunities: Selecting the Right Solutions for Your Community
Engineering + Ecology + Creativity
Pilot Testing Green Infrastructure for CSO ControlsStormwater BMPs included in this project were designed to intercept stormwater
before it enters the combined sewer (photo at upper right), providing storage and
infi ltration which will reduce runoff to the sewer. BMPs such as porous sidewalk and
select bioretention gardens also include subsurface storage (a total of 370,000 gallons
throughout the project) which will be released back into the sewer at a controlled
rate.
4
Kansas City’s Green Solutions Pilot ProjectOver 100 raingardens and bioretention gardens were included in the design
throughout the project area. Distributed detention more closely mimics natural
hydrology, promotes infi ltration, fi lters pollutants, and creates attractive streetscapes
in the process.
Bioretention
Raingarden
Raingardens and Bioretention
Engineering + Ecology + Creativity
5
Kansas City’s Green Solutions Pilot ProjectWhen talking to residents at the neighborhood meetings and help during the
design phase, one common concern raised was speeding through neighborhood
streets. The curb extension design was created to integrate stormwater storage with
traffi c calming devices to address specifi c neighborhood needs. Many of the curb
extensions also contain below-grade storage systems for extra detention volume.
Curb extension inlet
Check dam
Curb Extensions
Engineering + Ecology + Creativity
6
Kansas City’s Green Solutions Pilot ProjectOver 5,000 feet of porous pavement and pavers have been constructed. Porous
sidewalks and gutters are used in this project both to store and convey water.
Materials being tested include porous concrete, pervious pavers, porous street
gutters, and below-grade storage systems beneath the pavements.
Storage cubes under porous pavers
Porous gutter conveys stormwater
Porous Pavements
Engineering + Ecology + Creativity
7
Stormwater Challenge: Combined Sewer Overfl owsKansas City’s Green Solutions Pilot Project is pilot testing multiple BMP types and
design variations to select the most reliable and cost-eff ective approaches for the
Midwest climate, landscape, and soils. The lessons-learned from this project will help
URS select the right approaches for future stormwater retrofi ts.
Plant locations and varieties are a key design detail
Field testing engineered soil for infi ltration rates
Improving BMP Design:Details Improve Performance
Engineering + Ecology + Creativity
Sweating the Details of Green Solutions Design to Improve Performance and Reduce MaintenanceSmall details can make the diff erence between success and failure in stormwater
management BMPs. Preventing erosion, managing sediment, promoting infi ltration
through proper bed preparation (photo at upper right), selecting the right plant for
the right place in a rain garden all improve performance, reduce maintenance, and
save headaches. URS Green Solutions Kansas City has built hundreds of BMPs, made a
few mistakes along the way, and improved designs each step of the way to help make
it easier for the next community to invest in green infrastructure.
8
Kansas City’s Green Solutions Pilot ProjectURS Green Solutions, Kansas City is pushing the limits of the green approach to
stormwater management and charting new waters in green design to create a new
generation of cities with sustainable stormwater infrastructure.
Custom inlet and trash basket
Smartdrain underdrain in bioretention bed
Creative Solutions
Engineering + Ecology + Creativity
Address Local ChallengesProject designs were adapted to specifi c project challenges. The photos above
illustrate: A cascading raingarden on sloped streets; a low profi le bioretention
underdrain; a custom inlet to keep debris out of storage chambers, and porous street
gutters and sidewalks.
9
Engineering + Ecology + Creativity