Are we at the Cpping point?
Pro Con
Mine life
Risk
Upfront CAPEX
Decouple from diesel
Very Low OPEX (LCOE)
1. WA electricity up 86% in last 3 years, SCll 30% below cost
2. Investment stalled despite rising prices 3. Demand could rebound
4. Carbon and renewable energy targets both threatened
Mind the InformaCon Gap
Solar Farm Carnarvon: Diesel-‐integrated power generaCon
o EMC designed & construct, and owner/operator
o On Cme, no accidents and $500,000 under budget
o 30yr PPA with Horizon Power (15+3x5)
11
Are we at the Cpping point?
Pro Con
Mine life
Risk
Upfront CAPEX
Decouple from diesel
Very Low OPEX (LCOE)
Are we at the Cpping point?
Pro Con
Mine life
Risk
Upfront CAPEX
Decouple from diesel
Very Low OPEX (LCOE)
Ancillary benefits
Design & Construct Finance, own & operate Electricity retail