31
Jamie Ally, General Manager – Engineering 17 March 2013 Remote Area Power Supply Conference

Jamie Ally, Energy Made Clean - CASE STUDY | Tactics and case studies for the deployment of sustainable energy in mining

Embed Size (px)

Citation preview

       Jamie  Ally,  General  Manager  –  Engineering  17  March  2013  

 Remote  Area  Power  Supply  Conference  

Are  we  at  the  Cpping  point?  

Pro   Con  

Mine  life  

Risk  

Upfront  CAPEX  

Decouple  from  diesel  

Very  Low  OPEX  (LCOE)  

Source:  Data  from  BP  StaCsCcal  Review  of  World  Energy  2013  

Source:  GraTan  InsCtute,  2013  

Source:  Australian  Bureau  of  StaCsCcs    

Electricity  and  Gas  price  indexes    (adjusted  for  inflaCon)  

1.  WA  electricity  up  86%  in  last  3  years,  SCll  30%  below  cost  

2.  Investment  stalled  despite  rising  prices  3.  Demand  could  rebound  

4.  Carbon  and  renewable  energy  targets  both  threatened  

Mind  the  InformaCon  Gap  

Renewables  and  Distributed  generaCon  –  only  game  in  town  

Opportunity  

Kiplimo  chemirmir  

Uaroo  Sta(on  Solar  /  Ba-ery  /  Diesel  Hybrid  

70%  reduc(on  in  diesel  use  

Solar  Farm  Carnarvon:  Diesel-­‐integrated  power  generaCon  

o  EMC  designed  &  construct,  and  owner/operator  

o  On  Cme,  no  accidents  and  $500,000  under  budget  

o  30yr  PPA  with  Horizon  Power  (15+3x5)  

11  

Typical  cloudy  day  

Typical  cloudy  day  

Fringe  of  grid  installa(on  135  kW,  >30%  penetra(on  

Source:  Western  Power  

Grid  import   PV  genera(on  Demand  total  

What’s  really  important?  

What’s  really  important?  

What’s  really  important?  

Green  Cred  

Return  on  investment  

Reliability  and  grid  stability  

What’s  really  important?  

Source:  HOMER  Energy  

Are  we  at  the  Cpping  point?  

Pro   Con  

Mine  life  

Risk  

Upfront  CAPEX  

Decouple  from  diesel  

Very  Low  OPEX  (LCOE)  

Are  we  at  the  Cpping  point?  

Pro   Con  

Mine  life  

Risk  

Upfront  CAPEX  

Decouple  from  diesel  

Very  Low  OPEX  (LCOE)  

Ancillary  benefits  

Are  we  at  the  Cpping  point?  

Load  management,  reliability,  producCvity  

Curtail  /  dump  

Energy  storage  

Grid  import   PV  genera(on  Demand  total  

City  of  Kalgoorlie-­‐Boulder  

Renewables  in  Mining  

Source:  Solar  Reserve,  2009  

Renewables  in  Mining  

Maximize energy consumption rather than efficiency

Closing  

•  IPP’s  –  where  are  they?  •  Commodity  price  vola(lity  

•  Fragmented  industry  

     

     

Design  &  Construct   Finance,  own  &  operate   Electricity  retail  

Thank  you  

An  entrepreneurial  and  technology-­‐independent  energy  project  developer  www.energymadeclean.com  

Jamie  Ally  General  Manager  -­‐  Engineering  [email protected]  

0404  662  294