A TRASGO

What is it?

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Following a Spanish Dictionary:

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

What we pretend to be:

An affordable and high performance High Energycharged particles Timing and Tracking detector to be used everywhere an affordable and high performancehigh energy charged particles timing and trackingdetector is needed

DAQ and

Power Supplies

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A trasgo pretends to offer:

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A trasgo pretends to offer:

AffordabilityBasic elements common tothe different configurations

Detectors

Chamber

Plane

Strip or Cell

DAQ Boards Other elementsFEE Electronics

HV power supplyLV power supplyTemperature, pressure sensorsAcquisition, reconstructionand analisys software…

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A trasgo pretends to offer:

Modularity

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A trasgo pretends to offer:

Versatility

AbsorbersDifferent number of detectors

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A trasgo pretends to offer:

Capability of workingSand-alone

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A TRASGO

Why is it special?

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. Santiago de Compostela Feb. 5th-6th. 2010

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Three basic ingredients:

-High time resolution detectorsTiming Resistive Plate Chambers

-Data acquisition board including thereconstrucion and analysis software

TTB: Timing and Tracking Board-A powerful and fast track reconstructionAlgorithm

TimTrack

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. Santiago de Compostela Feb. 5th-6th. 2010

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

- High time resolution detectorsTiming Resistive Plate Chambers

-Timing Resitive Plate Chambers (tRPCs) offer the bestperformances at the best price to cover big surfaces- Are easy to manufacture in mass production- Robust and relatively easy to handle- Difficult to build offering the best performance

Tentative minimum requirements:. Eficiency > 90% Time resolution < 200psRate capability > 100Hz/cm2Dead time of a single channel < 100ns

Chamber side view

Gas flow

HV

IsolatingCover

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. Santiago de Compostela Feb. 5th-6th. 2010

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

- Data acquisition board including thereconstrucion and analysis software

TTB: Timing and Tracking Board

Inspired by the TRB (Trigger Readout Board) of HADES-GSI

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. Santiago de Compostela Feb. 5th-6th. 2010

TRB

+- Tracking implemented in FPGA’s

- Analisis implemented in board processor (ETRAX)

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

-A powerful and fast track reconstructionAlgorithm:

TimTrack

Saeta: s = (X0,X’,Y0,Y’,T0,1/Vz)

T0

Vz

y

x L

z=0Y0

X0

X’

Y’

z

V This equation provides the saetadirectly from the data

Vector s depends on the dataMatrix K depents on the layout

Covariance matrix, V:V = K-1

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A TRASGO

Minimum requirements

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Box4 RPC planes

80 cm

80 cm

80 cmFEE

32channels/plane

TRB/TTB128 channels

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Trasgo’s resolutions (β=1. Units: ps, cms and radians)

1 TRB : 128 channels 2 TRBs :256 channels

δtRPC Planes/Trasgo δT0 δv/v(%) δx δx’ δT0 δv/v(%) δx δx’

4 70 7 9.4 0.03 70 7 5.4 0.02

6 58 5 9.9 0.04 58 5 6.0 0.02200ps

8 50 6 10 0.04 50 6 6.5 0.02

4 35 3.6 7.1 0.024 35 3.6 4.7 0.02

6 30 3.1 6.9 0.025 30 3.1 5.0 0.02100ps

8 25 3 6.4 0.024 25 3 5.1 0.02

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A TRASGO

What is it for?

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Cosmic ray detection is useful not only for research in cosmic rays!

- Dosimetry in airplanes, computing and telecomunication equipments,high energy particle physics accelerators environments…

- Interplanetary magnetic field measurements- Solar activity- Correlation studies between cosmic rays and climate changes- Ultra High energy nuclear physics models- Ultra High energy physics radiation with mater interaction- and other secondary uses:

- Calibration of detectors- Search of hidden chambers in pyramids- Earth subsoil “radiography”- …

A detector with outstanding performances like the Trasgo may be veryuseful for some of these and other tasks, either working alone, in puretrasgos arrays or in hybrid arrays

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Let’s see some examples

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Cosmic Rays Astroparticle Physics

High energy cosmic rays interact in the highest layers of the atmosphereproducing showers of billions of secondary cosmic rays that are detectedat the earth surface

Primary cosmic ray properties (direction, mass, energy) are estimatedfrom the information measured at the Earth surface

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

But…showers lose many information about their birth and to estimate the propertiesof the primary cosmic ray has many unaccuracies:

The scatter of points on a plot of the average logarithm of the nuclear mass number of the primary cosmic rays versus energy clearly shows the need for more input from accelerators.

CCOU02

… and some estimations have to be done with the help of MonteCarlos

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Just a few tracking detectors with enough accuracy and size may providevery significative information about the shower properties:

- Density of particles- Width of the shower front- Curvature- Mean values, dispersion, asymmetries of the arrival angles- Some electrons/muons separation

Hypothesis:The increasing of measured information, its redundancy and its accuracy

(with Trasgos) may allow to improve the estimation of the primary cosmic ray.

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A very nice exercise:

It could be very interesting to repeat the pioneering experiment done by Bassi, Clark and Rossi in the fifties to determine the properties of the atmospheric showerswith the time, position and angular resolution provided by the Trasgos.

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

[Bassi, Clarck and Rossi: 1953]

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Other uses:

As complementary detectors for underground cosmic ray experiments

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Other uses:

For improving muon resolution in big spectrometers

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Other uses:

Calibration of hugh observatories

For example: Antares/Km3

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Other uses:

Cosmic rays and Climate

Helada en Londres en 1684

Correlations between climate and solar activity

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010Juan A. Garzón: 2nd. Workshop on the Trasgo Project. Santiago de Compostela Feb. 5th-6th. 2010[http://en.wikipedia.org/wiki/Image:Structure_of_the_magnetosphere_mod.svg]

GCR: Galactic Cosmic Rays

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Other uses:

Analysis of the correlation between high energy cosmic rays and the climate changes

Correlations have been observed between the themperature of the stratosphereand the flux of muons at ½ mile underground (high energy muons):High energy(narrow) showers could be measured with the help of Trasgos

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A TRASGO

Where we are?

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

2009 was a very hard yea for the Trasgo project:- Any support from the Spanish funding Agency- Any support from the Galician funding Agency- A lot of work with the commissioning of the HADES tRPC wall

But, however, we had a few significatives advances:

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Trasgo project

- Cells developmentThe groups of LIP-Coimbra and LabCAF-USC have started theR&D of sealed timing RPCs (Talks of P. Fonte & M. F.Morales)

- A poster has been accepted in the RPC2010 conference

- 12 cells from Hades available to built the 1st. prototype

- First steps done in order to open a collaboration with Dept. ofElectronics (Prof. J. Bruguera) and the GSI (Dr. M. Traxler) toimplement the tracking and the reconstruction software in a TRB

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A first Geant for Trasgos is ready… and well documented at the Hades Wiki page (thanks Diego!)

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

TimTrack:- 1st. article accepted in Nucl. Instr. & Meth. A- An oral presentation accepted in RPC2010 Conference- Version of TimTrack for Drift Chambers ready and being tested with

HADES MDC simulated data (preliminary results encouraging)- First test done with real data:

Cosmic data from the commissioning of the HADES tRPC wall(Talk of P.Cabanelas)

- A couple of collaborations are being opened with:Leo Alonso (Dept. of Algebra /USC)Wenceslao G. Manteiga & Cesar Sanchez (Dept. of Statistics)to explore the mathematical aspects of the method

-A collaboration opened with the CESGA (C. de Supercomputaciónde Galicia) to write the code in C language and adapted to be usedwith parallel computers or multicore processors

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Accepted in NIM A

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

1st. formalism approach

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

A TRASGO

Next steps

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Next steps

- Advance in the development of sealed RPCs

- Analyze the cosmic data taken with the HADES tRPC wall at GSI

- Advance in the mathematical aspects of the TimTrack (?)

- Advance in the development of a new version of TRB: TTB (?)

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

- Build a first prototype, using:12 HADES tof tRPC cellsHADES FEE boards1 TRB V2.

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Next steps

- To extend or redefine the Meiga project(This afternoon at 19h30)

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Proyecto

(Mini Ensemble for Identifying GAlactic radiation )

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Meiga

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Expected fluxes of Cosmic Rays at the sea levelDensity/m2 Energy(eV) Frec/m2.day Radius(m) Area (m2) NClusters/day/m2

1015 0.03 30 3 103 100

1016 3 10-4 150 7 104 20

1017 3 10-6 330 3.5 105 1>51018 3 10-8 650 1.3 106 0.04

~120

1015 3 10-2 20 103 30

1016 3 10-4 100 3 104 9

1017 3 10-6 280 2.5 105 0.75> 101018 3 10-8 550 106 0.024

~40

1015 3 10-2 10 3 102 10

1016 3 10-4 80 2 104 6

1017 3 10-6 250 2 105 0.6> 171018 3 10-8 480 7 105 0.021

~16

1016 3 10-4 60 104 3

1017 3 10-6 200 105 0.3

> 30 ~31018 3 10-8 400 5 105 0.015

1016 3 10-4 50 8 103 2.4

1017 3 10-6 160 8 104 0.24

> 40 ~2.51018 3 10-8 350 4 105 0.012

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Overview of the Workshop

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

IN MEMORIAM

Juan Antonio Rubio(1944 - 2010 )

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Juan Antonio, ¡ va por ti!

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

THE END

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010

Somewhere over the rainbow, skies are blue

And the dreams that you dare to dream , really do come true

(The Wizard of Oz)

Juan A. Garzón: 2nd. Workshop on the Trasgo Project. S. Compostela Feb. 5th-6th. 2010Juan A. Garzón: 2nd. Workshop on the Trasgo Project. Santiago de Compostela Feb. 5th-6th. 2010

T0

Vz

y

x L

z=0Y0

X0

X’

Y’

z

V