Upload
sap-turkiye
View
144
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Itelligence Global İş Analitikleri Direktörü Christian Schmidt’in katılımıyla: Hızlı ve esnek planlama yeteneği ile BPC on HANA’yı , operasyonel süreçler ve raporlamadaki performansı ile ERP on HANA’yı, anlık veri erişimindeki çeviklik ile BW on HANA’yı ve etkin müşteri yönetimi ile CRM on HANA’yı iş dünyasıyla buluşturuyoruz.
Citation preview
SAP INNOVATION FORUMA 360 degree look at SAP HANA™
Konuşmacı Adı : Affan Yılmaz, Christian Schmidt
Firma Adı : itelligence Analytics
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 2
Gündem
itelligence at a glance
HANA Portfolio
Suite on HANA at itelligence
Conclusion
itelligence at a glance
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 4
itelligence NTT DATA Business Solutions
25 yıllık SAP uzmanlığı
Dünya Çapında 5000+ Müşteri
Tüm dünyada 7500+ SAP Profesyoneli
Dünya çapında 7x 24 Destek ve 10 Veri Merkezi
Ana sektörler: Üretim, Hızlı Tüketim, İleri
Teknoloji, Sağlık, Profesyonel Hizmetler, Ticaret
Uçtan uca çözüm odaklı ve güvenilir SAP iş
ortağı
25+ Sektörel Çözüm (BaiO)
500+ Süreç Spesifik Add-On ve mobil
uygulamalar
60+ RDS çözümü
One Method – NTT DATA global SAP metodolojisi
Uygulama Yönetim Servisleri (AMS)
Global SAP Gelirleri (12/2013)1+ Milyar €
23 Ülke ve 5 Bölge lokasyonu ile
her zaman yanınızda
BİR BAKIŞTA ITELLIGENCE GLOBAL HİZMET AĞI
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 6
itelligence Analytics
6
itelligence Analytics; uzman ekibi, proje deneyimleri ile SAP İş Analitikleri & Teknoloji çözüm ailesindeki tüm ürünleri, müşterilerine
sunabilme yeteneği ile farklılaşarak, şirketlerin rekabet gücünü ve iş çevikliğini arttırmalarını sağlıyor.
NEDEN ITELLIGENCE ANALYTICS
22 Ülkede 700 Uzman Analitik Uygulama Danışmanı
Süreçsel ve Endüstriyel Bilgi Birikimi
Türkiye’deki İlk Yenilikçi Yaklaşımlar
Süreç İyileştirme ve Geliştirme Desteği
Çok Boyutlu Analitik Raporlamalar
Global Hana Proje Deneyimleri
Global Bütçe ve Konsolidasyon Deneyimleri
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 7
itelligence Analytics
7
SAP HANA ile Hızlandırılmış Mali Muhasebe ve Maliyet Muhasebesi
SAP HANA ile Karlılık Analizi
Mağazacılık için Planlama
BPC Bordro Simülasyonu
BPC ile IFRS ve Konsolidasyon
BPC Ürün Maliyetlendirme
HIZLI PAKET ÇÖZÜMLERİMİZ
2013 En Çok
HANA Satan
İş Ortağı Ödülü
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 8
itelligence Analytics - Referanslar
8
HANA PortfolioHANA Overview
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 10
Open Platform for Innovating Without Disruption
User-drivenexperience
SAP UI HTML5 MobileSAP Business Objects™
Business Intelligence Solutions
Real-TimeInteractions
Real-TimePlatform SAP HANA™ &
SAP HANA™ Live
SAP NW
Business
Ware-house
New Apps,
Non SAP
Apps &
Data-
sources
SAP NW Business
Warehouse
SAP NW Business Suite
SAP ECC
SAP
SCM
SAP
SRM
SAP
PLM
SAP
CRM
Real-TimeExecution
Real-TimePlanningReal-TimeReportingandAnalysis
SAP HANA
Platform
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 11
Database
Layer
Application
Layer
„all"
data
Query
and
Result
The turning point: In-Memory ComputingShifting business logic to the database layer
Pre SAP HANA
Database
Layer
Application
Layer
Call
Pro
cedure
Resu
lt
Using SAP
HANA™
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 12
Example: ABAP & SQL Optimization in Suite on HANA
1. Migration Original-DB to HANA - no further optimization
2. Implementation of SQL „Join“ instead of Read & „Join“ in original code
3. Use of attribute views
4. Use of procedures on database
5. Combination of 3. + 4. Suite-on-Hana
Code Optimization
Source=
Performance
improvement >99%
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 13
Open Platform for Innovating Without Disruption
User-drivenexperience
SAP UI HTML5 MobileSAP Business Objects™
Business Intelligence Solutions
Real-TimeInteractions
Real-TimePlatform SAP HANA™ &
SAP HANA™ Live
SAP NW
Business
Warehouse
New Apps,
Non SAP
Apps &
Data-
sources
SAP NW Business
Warehouse
SAP NW Business Suite
SAP ECC
SAP
SCM
SAP
SRM
SAP
PLM
SAP
CRM
Real-TimeExecution
Real-TimePlanningReal-TimeReportingandAnalysis
SAP HANA
Platform
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 14
SAP NW Business Suite
powered by SAP HANA™: Overview
Benefits
Increased flexibility and transparency for your business processes
New business processes and models
Operational reporting in real-time (using HANA Live without a detour
using SAP NW BW)
Lean Data models, compression, acceleration, …
Uninterrupted innovation boost
Only change in "database“
Front-end and application server will stay the same, until YOU
decide to take advantage of HANA
Optimized transactions = optimized processes
And many more…
SAP HANA
Data ModelingComputing
Engine
SAP NW Business
Warehouse
SAP NW Business Suite
SAP ECC
SAP
SCM
SAP
SRM
SAP
PLM
SAP
CRM
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 15
Advantages for applications & reportingNo functional changes
SAP NW Business Suite
powered by SAP HANA™: Overview
Configuration
IMG will stay the same
Customizing
No changes
ABAP Workbench
No changes
Modification
Same upgrade prerequisites with each new release
BAdIs will be supported as before.
Connectivity
No changes
Security
No changes
Transports
CTS will stay the same
Monitoring
DBA Cockpit and SAP Solution Manager will stay the same
Application
No batch execution of dialogue processes required
Acceleration on all remaining batch processes
For changes in core-code apply the same restrictions
Reports
Execution of operational reports in real time within the Suite
operational data stores are no longer necessary
No data movement required for performance reasons
No comparison of source data and copies
Call of OLTP transactions within interactive reports
The latest generation of applications
Integrated analysis capabilities from now on available in a single
system
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 16
Open Platform for Innovating Without Disruption
User-drivenexperience
SAP UI HTML5 MobileSAP Business Objects™
Business Intelligence Solutions
Real-TimeInteractions
Real-TimePlatform SAP HANA™ &
SAP HANA™ Live
SAP NW
Business
Warehouse
New Apps,
Non SAP
Apps &
Data-
sources
SAP NW Business
Warehouse
SAP NW Business Suite
SAP ECC
SAP
SCM
SAP
SRM
SAP
PLM
SAP
CRM
Real-TimeExecution
Real-TimePlanningReal-TimeReportingandAnalysis
SAP HANA
Platform
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 17
SAP NW Business Warehouse
powered by SAP HANA™: Overview
SAP BW 7.3
SP6
RDMBS
SAP ERP
RDMBS
Other
Source
Extraction
Extraction
Benefits
Data Load Acceleration
Data Compression
Improved, Lean Data Models
Increased Flexibility
Faster Query Performance
Optimized Data Store Object (DSO)
Faster Activation
Very High Performance
Optimized InfoCube
Lean Data Model
Highly flexible Remodelling Options
SAP HANA
Data Modeling
Computing
Engine
Business
Objects BI
Optimized Layered
Scalable Architecture
No more Aggregates
required
No more Cubes required
(optional)
Improved Planning
Functions
Logic and Data Processing
are pushed down to the
Database Layer
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 18
SAP BW 7.x SPx
SAP NetWeaver BW powered by SAP HANA™
System View
SAP NetWeaver BW 7.x
on xDB Standard DataStore objects
RDBMS Database server
SAP NetWeaver BWA (BIA)
Standard InfoCubes
BW-integrated planning
SAP NetWeaver BW 7.3 SP5 (or higher)
on SAP HANA™ In-Memory-based DSO
SAP-HANA-In-Memory Platform
In-Memory-based InfoCubes
In-Memory-Planning engine
Composite Providers
Open ODS Views (BW 7.4)
HANA Smart Data Access (BW 7.4)Migration without new implementation - no problems with existing scenarios
ABAP JAVABWA
BWA
RDBMS-DB
SAP BW 7.3 SP5+
ABAP JAVA
HDB
SRV-Split
BW Upgrade
DB Migrate
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 19
SAP NW Business Warehouse
powered by SAP HANA™: Database View
Data
Presentation
Orchestration
Calculation
User
Interface
Layer
Classic Database In-Memory Database
Application
Layer
Database
LayerData
Presentation
Orchestration
Calculation
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 20
SAP-HANA-optimized InfoCube
Traditional InfoCube
Based upon RDBMS-Technology
Two Fact Tables ("F" and "E")
Persistent Dimension Tables (up to 16)
SAP-HANA InfoCube
Based upon in-memory-Technology
One Fact Table
No more physical Dimension Tables are required
Advantages
Improved Data Load Processes (only Facts need to be loaded)
Lean Data Model
Flexible Remodelling Options
Faster Response Times
Migration „on Demand“:
After the Migration to HDB (BW ≥ 7.3 SP5) the Cubes stay as they
are, until they are converted to In-Memory Cubes manually
FACTS
F
E DIM
DIM
DIM
… …
MD
MD
MD
MD
MD
MDMD
MD
With SAP HANA™
TraditionalllyMDMD
FACTS
FMD
MD MD
MD
MD
DIMP
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 21
SAP-HANA-optimized DataStore Object
With SAP HANA™
Traditionally
New Data Active Data Change-Log
Classic Table temporary Indexes Calculation View
Logic & Processing
Database Layer
Logic & Processing
Application Layer
RD
BM
S
AB
AP
HD
B
C+
+
Advantages:
Faster Activation
Enables Reporting directly on
the DSO
InfoCubes might no longer
be required
New Data Active Data Change-Log
Logic & Processing
Database Layer
Suite on HANA at a glance
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 23
video
2
3
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 24
Status HANA operation/technical experience at itelligence
Migration of itelligence ERP productive system (EpH 7, Oct 2013)
„Global Business Solutions Landscape“ with more than 30 SAP systems for development,
training and sales presentations (Business Suite, Analytics, Mobility, …) migrated in
Q2/2013; 400+ operational users in 23 countries
HANA Enterprise Cloud Partnership as one of the first partners globally
– 1st customers on itelligence HEC with BPC on HANA
More than 30 HANA landscapes actually operated in our Data Centers for customers
Concepts and sizing for High Availability and Disaster Recovery scenarios done and
established
Test centers for all HANA scenarios since June 2012
- Customer testdrive migrations (PoCs) for BW, ERP, SCM, CRM, new Apps already
successfully done!
HANA
AnalyticsBW / Business Suite
on HANA
HANA
TechnologyHANA
Accelerators
HANA
Apps
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 25
itelligence ERP on HANA Project
Initial Situation:
Start from ERP 6.0 EHP4 with 2400 Users in 22
Countries; Unicode with 14 languages
Interfaces to SAP CRM, BI and mobility access (in
total 15 major interfaces)
3-System Landscape
BUT: Go live 1st Jan of 1996 with R/3 3.0F – that
means several updates and many many
redesigns!
Intensive programming since 1995 of additional
functionality for service providers (base for
it.service-provider industry solution) with >1500
Z-Objects , but only > 200 actually used!
Targets of the Migration:
Learn the new SoH technology
„Use what we sell“ – long tradition at
itelligence to use SAP solutions for
ourselves
Be our own reference customer
Increase performance of reporting in ERP
Preparation for future improvements
coming along with HANA and EhP 7+
Option for the future to re-integrate BI-
function into ERP with direct reporting on
core data
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 26
Upgrade to EhP7 and migration into HANA
Parallel Project landscape to minimise change freeze period and risk
Test of SAP DMO tools (no GA) for upgrade and migration in one step to minimize downtime
ITD ITQ ITP
Production landscape
Project landscape Double Maintenance
SPAU
SPDD
System Copy
Upgrade
& Migrate
SPAU
SPDD
System Copy
Upgrade
& Migrate
Copy from
ITP EHP4
EHP7
EHP7oH
ITD’ITD’
Upgrade
ITD’ ITQ’ITQ’
Upgrade
ITQ’
ITP
UpgradeSPAU
SPDD
ITD
Copy from
ITP
ITQ
Upgrade
& Migrate
ITP
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 27
Migration plan and costs
Project duration:
Net 4 month (6 month in total due to summer vacation period and complex testing requirements)
Project cost (total about €100k plus internal efforts):
Consulting: €58k (about 60% for EhP7 Release Upgrade, 40% for HANA Migration)
Internal man days for Project management, coordination, testing, optimization: ~ 150 days
Key user tests in 15 countries in FI/CO/PS/HR/SD/MM/BI-interface/CRM-Interface: ~ 60 days
SAP support / tools: €17k
Hosting costs (in the itelligence Data Center): €24k
Compression
ratio:
-72%
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 28
ITPHANA
HANA
IBM Appliance
Size S+ 256 GB
Version 1.00.63
SuSE Linux Enterprise Server 11
20 Cores
IBM Appliance
Size M 512 GB
Version 1.00.63
MCOS
SuSE Linux Enterprise Server
11
40 Cores
VM, 8000 SAPS
Windows Server 2008 R2
32 GB
8 CPU
2 VMs, 4000 SAPS
Windows Server 2008 R2
4 CPU
16GB
ITQ
ITD
Database Size old MSSQL 2005: 350 GB
new HANA: 98 GB
HANA Systems scalable up to 4TB
Technical data about the system landscape
SAP ERP EHP 7
Unicode, 14 languages
22 Countries
2400 Users
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 29
Challenges with the ERP migration
HANA related challenges for us
(not looking at EhP7 related topics here):
Analysis of the highlighted objects in the
code inspector (250 hits) and identified
transactions during key user tests:
~ 5 man days analysis
Optimized coding of Z-Development:
Only 3 man days code optimization for Go Live
Correction of 8 non-performing select statements
Correction of ~80 selects for cluster tables with „Order by“
Still further potential identified in analysis, but not urgent or critical
Project system (PS) performance still to be improved with use of optimized new transactions and
optimization of our user exits
HR payroll run needs to be optimized even more, but maybe due to itelligence‘s complex rules
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 30
Performance: First results
Tests mainly on long running transactions or jobs (without optimization yet!):
Area Time on MS SQL Time on HANA Improvement
General Ledger Open Items listing (FI) 07:5101:09 - 85%
Asset History Sheet (AM) 00:12 00:02 - 83%
Profit Center Report – item list 01:22 00:19 - 77%
Analysis employee postings (ZAT4) 04:51 02:05 - 57%
Project mgmt. reporting single items (CJI3) Timeout 00:08 !!!
But: Project analysis cockpit (CJ74)(solution
ongoing, maybe user exit reason and use of
CJI3N instead of CJ74)
00:07 00:39 + 450%
further examples - 20-85%
HR Payroll for 1150 empl. (complex rules and
own dev.!)03:44 05:36 + 50%
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 31
Summary:
Surprisingly easy technical migration and low migration effort and costs (less than expected)
NO real critical topic or area
Even our very old custom coding was migrated easily
Long runners are about 70-80% faster
Several standard transactions are just slightly faster
Better usability - users see main improvements with reports, lists and jobs,
since the performance of daily tasks and operations was already good
In total we are much faster now!
AND now we can look for and analyze future improvements!!
Use new cockpits and transaction variants from SAP‘s future improvements
Re-integrate BI-function into ERP with direct reporting on core data
New project cockpit for service providers using HANA Live and a mobile App!
Summary of itelligence ERP on HANA project
Conclusion
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 33
Many advantages for customers
Future proof technology:
Strategic product of SAP, all future system enhancements and
new products will be based on the SAP HANA platform
Modern, open technology with open standards, for multiple
devices with modern HTML5 user interfaces
Secure and proven solution:
All proven functionality is ready for use with SAP HANA!
Operative hosting of SAP HANA platform is already daily routine in the data center
All standard and customer programs can be carried over without a change to SAP HANA
On top of this numerous options for optimization based on SAP HANA, e.g. shift of complex calculations to the
data base
Effectiveness and costs:
Consolidation of all processes on a single platform reduces complexity and costs
Protection of existing investment, e.g. through capturing of existing system configuration or specific migration
tools offering a safe passage towards the new technology
Attractive pricing models for new customers, when data base licensing is required anyway
© 2014 SAP AG or an SAP affiliate company. All rights reserved. 34
Past, Present & Future
Historical Realtime Predictive
Delay
Realtime only for transactionalscenarios
Direct integration of operational reporting in workflow
Shorter / Proactive reaction times (Google feeling: get the answers while still typing)
Simulations
Internet of things
Text analytics
Machine generated data
Self service analytics
Business
Challenge
Structured Data from Business Application
Limitations in RAM
Mainly Structured data from business applications
Partly unstructured possible
Many sources
Structured data
Unstructured data (text mining)
AdHoc queries
Many different sources, including Social Sources
Data
Classical BI / SBOP
Layered architecture
Separation OLTP / OLAP
ETL / Data Warehouses
In memory
HTAP
Now ready for enterprise computing
Hadoop / Map Reduce / No SQL / R
Originally for storing andindexing of websites
Technology
© 2014 SAP AG or an SAP affiliate company. All rights reserved.
Teşekkürler
İletişim Bilgileri:
Ad Soyad : Christian Schmidt
Ünvan : Global Director Business Analytics
Adres : [email protected]
Ad Soyad : Affan YILMAZ
Ünvan : İş Analitikleri Satış Yöneticisi
Adres : [email protected]