13
THE 12 DAY STORY TO SUCCESS

intelloCut implementation at PT Daese Garmin

Embed Size (px)

Citation preview

Page 1: intelloCut implementation at PT Daese Garmin

THE 12 DAY STORY TO SUCCESS

Page 2: intelloCut implementation at PT Daese Garmin

For our clients in Indonesia, is available in Bahasa.

Page 3: intelloCut implementation at PT Daese Garmin

Day 1World class consultants of ThreadSol introduce intelloCut to the factory team.

IntelloCut Introduction

Page 4: intelloCut implementation at PT Daese Garmin

The consultants go on to explain the product usage on the floor.And how every inch of fabric is money.

Live Demo

Page 5: intelloCut implementation at PT Daese Garmin

DAY 2ThreadSol consultants discuss the current processes of the factory and achieve a streamlined process.

Process Discovery and Mapping

Page 6: intelloCut implementation at PT Daese Garmin

DAY 2With every aspect of the process mapped and the responsibilities allocated, the factory team is easily able integrate the system with their daily use.

Process Discovery and Mapping

Software ScreenResponsibility

Documentation

Steps to follow

Page 7: intelloCut implementation at PT Daese Garmin

Day 3-5 Extensive classroom and on-floor training is undertaken to perfect the factory on the software.

Training

Page 8: intelloCut implementation at PT Daese Garmin

DAY 6 – 11The factory team runs their orders using intelloCut with aid from ThreadSol consultants.Saving fabric every day.

On-Floor

Page 9: intelloCut implementation at PT Daese Garmin

Day 12

The last day marks the closure of the implementation. The processes are discussed and…

Closure

Page 10: intelloCut implementation at PT Daese Garmin

ThreadSol leaves the self-reliant happy factory team!

Closure

Page 11: intelloCut implementation at PT Daese Garmin

Save fabric with

Page 12: intelloCut implementation at PT Daese Garmin

Save fabric with

Page 13: intelloCut implementation at PT Daese Garmin

Thank You [email protected]