2Your Logo

Use of Simulation in Plant Lifecycle

Human Factors Initial Training Oper. Training

Virtual Commissioning

Part Task Training

Design Commission Operations

Page 3: Innovation in Nuclear Simulation

3

Background

Real-time simulators came to the nuclear industry as training tools in the 1970s

– Limited computing power– Limited fidelity and

realism– Hand crafted software– “Tuned” to make it work– Used for training

Today’s NPP simulator is high fidelity

– Predictive models– Engineering grade– Multiple uses

Page 4: Innovation in Nuclear Simulation

4

Introduction

• Digital instrumentation and control (I&C) and digital control rooms

• New plants designs and the life extension of older plants require validation of these system designs.

• The real-time or dynamic simulator is playing a valuable role in the design of these new systems.

Page 5: Innovation in Nuclear Simulation

5

Critical Issues on New Plant Design and Construction

• Plants are using new technology.

• New control and information systems are being introduced that have extensive and complex control and logics.

• Plants will integrate disparate technologies often for the first time.

• Coordination of technology providers for the unit operations and the integration and design of the plant is a huge concern.

• Aggressive scheduling is required to improve the return on investment.

Page 6: Innovation in Nuclear Simulation

6

Requires High Fidelity Predictive Models

• INL’s RELAP5-3D Thermohydraulic Model

• Studsvik’s S3R Neutronics Model

• EPRI’s MAAP5 Severe Accident Code

• GSE’s High Fidelity JADE Modeling Tools

The key! Predictive models are necessary for

engineering simulators.

Page 7: Innovation in Nuclear Simulation

Case Study: Mochovce Nuclear Plant

Page 8: Innovation in Nuclear Simulation

8

Two New Units at Mochovce

• Modern power plant consisting of four Soviet VVER 440/V-213

– Units 1&2 operated since 1998 and 2000

– Units 3&4 to be started up in 2015 and 2016

• Owner: Slovenské Elektrárne and Enel

• Primarily modern Siemens controls and a modern control room with a traditional plant design

Page 9: Innovation in Nuclear Simulation

9

Project Objective

• High-fidelity full-scope simulator

– All new system models and controls

– New control room panels including emergency control room

– Siemens and other vendors sub-contractor to GSE

– Simulator delivery critical to new plant schedule (critical path)

– Plant controls still in development as simulator was being constructed

Page 10: Innovation in Nuclear Simulation

10

Simulator Control Room

Page 11: Innovation in Nuclear Simulation

11

Project Challenges

• Plant under construction / Build simulator parallel with plant / DCS database availability and changes

• Size and complexity of the project with unique features DCS & backup panels

• Integrate with third party vendors, and complex and new technologies

Page 12: Innovation in Nuclear Simulation

12

3rd Party Integrated Software

The simulator integrated many third party new and complex technologies:

– Siemens /Areva DCS

– Invelt/Skoda Turbine Control System

– Skoda Reactor Rod Control System

– Rolls Royce Ex-core System

– SNIIP In-core System

– ZAT Electrical Distribution/Synchronization

– EnergoData Dispatching Center

– SafeCo Fire Detection and Protection System –

Stimulated

Page 13: Innovation in Nuclear Simulation

13

Simulator Control Room

Page 14: Innovation in Nuclear Simulation

14

Reduce design cost and project risk for the following:

– Validate plant system process designs

– Design & validate digital I&C strategy

– Design & validate human machine interface

– Use as a platform for human factor engineering (control room design)

– Validate plant operation procedure

The Value

Page 15: Innovation in Nuclear Simulation

15

First-of-a-Kind Engineering Projects

N u S c a leSMRHuman Factors Engineering

Control Strategy Evaluation

K o r e a

Ultra Supercritical

Tools for boiler control validation

S I N O P E C

IGCCDynamic Simulator for

Emerson/GE/Triconics/PLC

integration.

W e s t i n g h o u s eAP1000Human Factors Engineering

Control V&V

P B M R

Modular Reactor

C P R 1 0 0 0V&VControl Strategy

Development Simulator

Page 16: Innovation in Nuclear Simulation

16

About GSE Systems

Markets• Power Generation [Nuclear & Fossil]• Oil & Gas, Refining, Petrochemicals, Chemicals• Manufacturing, Pharma, Transportation, Desal/water

Products & Services• Simulation for Training and Engineering• Engineering [Electrical, IC&A] and Specialized Plant Services• Training and Training Technologies, Visualization

The Company• IPO 1994 symbol GVP• Merged pieces General Physics, S3Technologies, EuroSim• 2010-2014 Acquired TAS Eng., EnVision, Hyperspring• 350 Employees, 8 Locations, 5 Countries• $70M Annual Revenue

Page 17: Innovation in Nuclear Simulation

For more information:

Go to: www.GSES.com

Call: +1 800.638.7912

Email: [email protected]

Follow us on:

Twitter @GSESystems

Facebook.com/GSESystems