Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
PORTUGAL
Gondomar Municipality
5th European Conference on Sustainable Cities & Towns
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
PORTUGAL
Gondomar Municipality
Session A5- Sustainable (re-)designing of districts
Joaquim Flores
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Structure
Introduction
Objectives
POLIS Programme
Gondomar Municipality
Gondomar Polis Project
Conclusions
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Objectives
To present the Gondomar Polis Project in relation withthe Aalborg Commitments:
1- regeneration of an area environmentally degradedfor the benefit of all;
2 – avoid urban sprawl in a greenfield site;
3 – rehabilitation and re-use of cultural heritage;
4 – promote high quality urban design standards
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
POLIS Programme
Programme for Urban Improvement and Environmental Enhancement of Towns and Cities
- Portuguese Program of the central administration inpartnership with the local city councils, initiated in 2000
- Main Objective:
- To improve the quality of live in Portuguese cities through urban and environmental interventions
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Interventions in 39 Portuguese cities:
- 28 large integrated operations
- 12 minor interventions
POLIS Programme
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Municipality
full signatory of the Aalborg Charter
North of Portugal
One of the 14 municipalities of Porto Great Metropolitan Area
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Municipality
Census of 2001 - population of 164.096 inhabitants
131,9 Km2 of Area
forest, agriculture and naturalprotected resources - more than50% of Territory
Forest Area
Forest in Urban Consolidated
Forest Spaces
Gold jewellery handcraft,Services, Agriculture and Forest,are the main economic activities
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Municipality
Porto
Gondomar
River Douro
waterfront
Atlantic
waterfront
gives continuity to the Porto River Douro Front along 35 Km
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis ProjectPotential:
Riverfront of 35 Km
Problems:
- the urban growth becomes progressively stronger
-
- leisure phenomenon
also generates pressure
- private ownership
Leads to Environmental degradation
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project1999/2000:
Strategic Plan
14 Km of riverfront
-
main objectives:
control the urban sprawl
requalify the area
in a sustainable way, (saving
environmental qualities, improving atthe same time the economic and sociallevel of the local inhabitants)
Porto
Crestuma Dam
National Road 108
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
2001:
Gondomar Polis Project approved
4,5 Km of riverfront
44 hectares
14.900.000,00€
90% Central Government
10% Municipality
Started 2002
Will finish in 2009
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Pedestrian and cycle
way – 4,5 Km
Gramido valley park /
Green corridor
Gramido central node
Porto Oriental Park
Freixo (Porto) Museums
and marina
Gondomar City Centre
Pedestrian and cycle
way – 1,5 Km
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Strategic Actions:
- Surveys and Studies
- Waterfront requalification projects and works
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Surveys and Studies:
- Geographical Information System (GIS)
- Sight Plan
- River pollution surveys (partnership)
- Environmental Impact Assessment
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Sight Plan
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Waterfront requalification projects and works:
- Waterfront requalification
- Rehabilitation of Gramido Historic House
- Construction of Gramido Nautical Centre
- Construction of Gramido car parking
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Preliminary Program
Definition of 5 Waterfront Requalification Units (Projects) - Units A,
B, C, D e E according to landscape units
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Preliminary Program
Flood survey and cartography
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Preliminary Program
Technical specifications for cycle and pedestrian way
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Gondomar Polis Project
Preliminary Program
Project Criteria:
- Concrete program definition
- Quality design standards
- Universal mobility (all locals accessible)
- Connections with public transportation
- Avoid impermeabilization of the soil
- Flood study – appropriated materials and techniques
- Use of local adapted vegetation, avoiding green spaces with watering systems
Rehabilitation of Gramido Historic House (2005/2006) – 788.600,00€
Session A5- Sustainable (re-)designing of districtsGondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Museum of Gold Jewellery
Partnership - AIORN
Gramido Nautical Centre (2006-2007)
1.350.000,00€
Session A5- Sustainable (re-)designing of districtsGondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Partnership – Local Club
Mix of generations
Waterfront requalification
Unit C – Gramido
1.600.000,00€
33.000 m2
389 m of
waterfront
456 m of cycle and
pedestrian way
5.100 m2 of public
/ green space
Session A5- Sustainable (re-)designing of districtsGondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Partnership with Public Institute to bring tourist
boats
Gondomar Environmental Centre
Passal Farm
Session A5- Sustainable (re-)designing of districtsGondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Partnership with Lipor
Environmental education
Sustainable design
Energy and water conservation
Biological farms
Educational farm
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
Conclusions
Weakness
- Lack of public participation
- Central Government financial support dependence
- Time delay due to complex plot of public/private entities
Gondomar Polis Project - Sustainable Requalification of Gondomar's River Douro Waterfront
Session A5- Sustainable (re-)designing of districts
ConclusionsStrengths
- Avoid urban sprawl in a green area
- Environmental and landscape requalification of this degraded green area
- Turning a semi-public area in a quality public green space for benefit of all
- Promote tourism to bring local income
- Establishment of partnerships to ensure sustainable exploration