Example Applications

Fieldbus Tutorial Part 3 - Example Applications

Embed Size (px)

DESCRIPTION

Fieldbus Tutorial Part 3 - Example Applications: Example Application, World's First Installation, Fieldbus Installation at ARCO

Citation preview

Page 1: Fieldbus Tutorial Part 3  - Example Applications

Example Applications

Page 2: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 2

Agenda

Example Applicaton

World’s First Installation

Fieldbus Installation at ARCO

Page 3: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 3

NOTES

BRIGHTENGINEERING

GOODMANUFACTURING

REV DESCRIPTION

0 OWNER REVIEW

A

1/2 MILE

600 FTRiver

Main Cable Runs

Road

Plot Plan - Waste Water

A

MCC

LocalControlRoom

Page 4: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 4

Performance Specifications

Inflow of 10Kgal/min

Influent pH ranges from 5-10.5 pH

Flow can go to Zero

Effluent must be between 6-9pH

Compliance must be achieved 99.9% of Time

Site will be unmanned requiring;

– Extensive Remote Diagnostics

– Intelligent Transmitters

Page 5: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 5

Performance Specifications (Cont.)

Extensive Reporting is required;

– Reagent Usage

– Equipment Maintenance

– Regulatory Compliance

Plant Standards in Place for Instrument Vendors

There is also a PERFORMANCE GUARANTEE

Page 6: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 6

Attenuation Basin To River

2” DR.(TYP)

ACID

CV-108A/O

AT106A

2” DR.(TYP)

BASE

CV-109A/O

36”

36”

36”

CV103A CV103B

NOTES

BRIGHTENGINEERING

1 UNLESS OTHERWISE NOTED ALL INSTR.ON THIS DRAWINGCARRY AN AREADESIGNATION OF878, THAT IS FI-1 IS878FI-1.

GOODMANUFACTURING

LT104

AT103B

AT102

FT101

IP103A

IP103B

LT109

LT108

FIELD LOCATION 1

FAL101

AIC103

32

AI102

5

LI104

13 14 15 16 17 18 19

MOTOR CONTROL

11 12

INTERLOCKS

11 FILL PUMP WILL 12 TRIP OFF IF TANK

IS AT HIGH LEVEL

REV DESCRIPTION

0 OWNER REVIEW

18

19

16

17

14

13

15

5

21

3

12

11

10

9

CONTROLROOM

P&ID Waste Water

AT103A

AT106B

7

TRK

AY103

4

AAHL106

QTR106

7

FY103

4

LSH108 LSH

109

HS103

TT107

HS106

8

AT105

DissolvedOxygen

pHpH

pH 6

9

LI108

10

LI109

6

AI105

8

TI107

Page 7: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 7

36”

1 FT10113

14

AT102 2

17

Inlet Flow Measurements

Page 8: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 8

Attenuation Basin

To River

36”

4

AT103B

5LT104

7

AT106A

Measurement After Mixing

AT103A

AT106B

HS103

pH

HS106

AT105

6

DissolvedOxygen

pH

8TT107

Page 9: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 9

2” DR.(TYP)

BASE

CV-109A/O

CV103B

IP103B

LT109

1916

3

12

10

Base Feed Stream

LSH109

FY103To

103A

INTERLOCKS

11 FILL PUMP WILL 12 TRIP OFF IF TANK

IS AT HIGH LEVEL

Page 10: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 10

pH Control Strategy Design

AT103A

CV103A

CV103B

IP103A

IP103B

17

AIC103

AT103B

Track

(Linearized to Normality)

FY

103

AY

103

HS103

FT101

FAL

101

(Split range)

Select Value

Inflow

Acid BasepH

Page 11: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 11

Ngm-mol/l

pH

Characterization of pH to Normality(AY103)

Buffering requires many segments to properly describe

Note:

72 12

0.2

- 0.2

Page 12: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 12

ValvePosition(% of Span)

Split Range Output (FY103)

AIC103 Output (% of Span)1000

0

100

Base (IP103B)

Acid (IP103A)

Page 13: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 13

Attenuation Basin To River

AT106A

AT106B

HS106

AAHL106

QTR106

% Time in Compliance Calculation

Calculate Time Out of Compliance(High and Low)

Page 14: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 14

BASE

CV-109A/O

LT109

12

10

19

Discrete Control For Motors and Solenoid Valves

LSH109

OUTPUT

LSH109RunContact

Start

Stop

Page 15: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 15

ACID

AT106A

BASE

LT104

AT103B

AT102

FT101

IP103A

IP103B

LT109

LT108

18

19

16

17

14

13

15

AT103A

AT106B

Fieldbus Wiring

Control RoomPC

H1 Fieldbus

Segment # 1

H1 Fieldbus

Segment # 2

TT107

AT105

Page 16: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 16

FF Allows Control Applications To Be Distributed

Fieldbus Segment #2

Waste Water Process

FI101 IP103A IP103B AT103A AT103A

pH Control

pH Meas. SelectLO FlowMonitor

Page 17: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 17

pH Control Strategy Design

AIT103A

CV103A CV103B

IP103A

IP103B

17

AIC103

AIT103B

TRKPV, (Linearized to Normality)

FY

103

AY

103

AHY103

FT101

FAL

101

OUT, (Split range) Select Highest Value

AI ISEL CHAR

AIAI AALM

PID SPLT

AO

AO

Page 18: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 18

Attenuation Basin To River

AT106A

AT106B

AHY106

AAHL106

QTR106

% Time in Compliance Calculation

Calculate Time Out of Compliance(High and Low)

AI

AI

ISEL AALM TIMR

Page 19: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 19

BASE

CV-109A/O

LT109

12

10

19

Discrete Control For Motors and Solenoid Valves

LS109

OUTPUT

LSH109 RunContact

Start

Stop

AI AALM DO

DI DEVC DO

Page 20: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 20

9

7

6

8

5

pH

AT103Outlet

AT102Inlet

Response to Disturbance in Mixer Inlet pH

Page 21: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 21

Modified pH Control Strategy

AIT103A

CV103ACV103B

IP103A

IP103B

17

AIC103

AIT103B

TRKPV, (Linearized to Normality)

FY

103

AY

103

AHY103

FI101

FAL

101

OUT, (Split range)

Select Highest Value

AT102

AY102

AI ISEL CHAR

AIAI AALM

PID SPLT

AO

AO

AI CHAR

Page 22: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 22

9

7

6

8

5

pH

AT103Outlet

AT102Inlet

Response After Strategy Modification

Page 23: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 23

Startup of the World’s First Commercial Fieldbus System

April 15th, 1997, Fort Saskatchewan, Alberta, Canada

Installation and Commissioning of ninety six(96) 3051T transmitter was completed in 5 hours by 3 instrument tech’s.

Project Savings of over 30% have been documented by customer for the fieldbus installation vs traditional installation.

Page 24: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 24

Detailed View of DeltaV Controller Field Enclosure

Redundant power supplied to each segment.

DeltaV fieldbus modules interfaced to each fieldbus segment

Redundant Ethernet connection provided to field hub.

Page 25: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 25

Quick disconnects used at the transmitter to speed installation and to allow transmitters to be easily added and removed from the fieldbus segment.

Sixteen 3051T transmitters per fieldbus segment, 6 segments installed for a total of 96 transmitters

Fieldbus Installation

Page 26: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 26

Field Devices Available With Quick Disconnects

Page 27: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 27

Page 28: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 28

DeltaV Controller Field Mounted Hub

Redundant fiber link back to the rack room

Redundant Ethernet connects to the DeltaV Controller

Capacity to support 12 DeltaV controllers

Page 29: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 29

Plant Design

Data communication network

fieldbus H1

Operator Interface

Integration Station

H1 Fieldbus InterfaceExisting DCS

OPCFB

AMS

Page 30: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 30

Page 31: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 31

Page 32: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 32

DeltaV Integration

Station

Engineering LAN

Switched

Ethernet Hub

DEC Alpha SETCIM

Serv er

DeltaV Control LAN

Engineering LAN

OPC scanner resides

locally with SETCIM

kernel

DeltaV Prof essional

Plus

(Master) User Station

Radio Module (T1 and

10BaseT)

Radio Module (T1 and

10BaseT)

Radio Module (T1 and

10BaseT)

Radio Module (T1 and

10BaseT)

Radio Module (T1 and

10BaseT)

Switched Ethernet

Hub

SETCIM Client

PC/X-Terminal

SETCIM Client

PC/X-Terminal

DeltaV Standard Plus User

Station

5 Total

Broadcasting

Channels

Required

I.S. LAN

/Alaska Project

DeltaV Control Network Topology Diagram

04 June 1997

Ethernet Router

OPC

Serv er

Drill Site #1

Customer

Operator

Interf ace f or

Control and

Monitoring

For adv anced

diagnostics and real-

time trending

Radio Module (T1 and

10BaseT)

Switched Ethernet

Hub

DeltaV Prof essional

User/Integration

Station

SETCIM Client PC

/DeltaV Prof essional Hot

Backup

Resident

OPC Driv er

OPC

Serv er

Drill Site #5

Customer

Operator

Interf ace f or

Control and

Monitoring

For adv anced

diagnostics and real-

time trending

Radio Module (T1 and

10BaseT)

Switched Ethernet

Hub

DeltaV Prof essional

User/Integration

Station

SETCIM Client PC

/DeltaV Prof essional Hot

Backup

Resident

OPC Driv er

OPC

Serv erProgramming

WS

Diagnostic

WS

Separate Subnet

Utilize DeltaV Capability To Meet Fieldbus Systems Requirements

Page 33: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 33

Page 34: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 34

West Sak DS-1D

Page 35: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 35

Capital Cost Savings

– 16% Reduction in Wellhead Terminations

– 69% Reduction in Comparable Wiring Costs

– 98% Reduction in Home Run Wiring

– 83% Reduction in Instrument FCO and QA/QC

– 90% Reduced Configuration Time to Add an Expansion Well

– 92% Reduced Engineering Drawings to Add or Expand a Well

– $845 K Overall Project Cost Savings

Page 36: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 36

TARN DS-2N

Page 37: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 37

1998 Projects

– TARN DS-2N

– TARN DS-2L

– Tabasco

– West Sak DS-1C

Page 38: Fieldbus Tutorial Part 3  - Example Applications

[File Name or Event]Emerson Confidential27-Jun-01, Slide 38

Instrument Functional Checkout

– Time to do FCO Reduced by 80%

– Apply Portion of Time Savings to QA/QC

• Verify Terminations vs Drawings

• Verify Polarity (if Needed)

• Look for Frayed Wires

• Cables Meet Minimum Specs

• Fieldbus Terminators are Installed

• Verify Proper Grounding